Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes

N/A
N/A
Protected

Academic year: 2021

Share "Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes"

Copied!
21
0
0

加載中.... (立即查看全文)

全文

(1)

On: 25 April 2014, At: 06:25 Publisher: Taylor & Francis

Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office: Mortimer House, 37-41 Mortimer Street, London W1T 3JH, UK

International Journal of Production

Research

Publication details, including instructions for authors and subscription information:

http://www.tandfonline.com/loi/tprs20

Minimising makespan on parallel batch

processing machines with non-identical

ready time and arbitrary job sizes

S.H. Chung a , Y.T. Tai a & W.L. Pearn a a

Department of Industrial Engineering and Management , National Chiao Tung University , Hsinchu, Taiwan, ROC

Published online: 30 Jun 2009.

To cite this article: S.H. Chung , Y.T. Tai & W.L. Pearn (2009) Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes, International Journal of Production Research, 47:18, 5109-5128, DOI: 10.1080/00207540802010807

To link to this article: http://dx.doi.org/10.1080/00207540802010807

PLEASE SCROLL DOWN FOR ARTICLE

Taylor & Francis makes every effort to ensure the accuracy of all the information (the “Content”) contained in the publications on our platform. However, Taylor & Francis, our agents, and our licensors make no representations or warranties whatsoever as to the accuracy, completeness, or suitability for any purpose of the Content. Any opinions and views expressed in this publication are the opinions and views of the authors, and are not the views of or endorsed by Taylor & Francis. The accuracy of the Content should not be relied upon and should be independently verified with primary sources of information. Taylor and Francis shall not be liable for any losses, actions, claims, proceedings, demands, costs, expenses, damages, and other liabilities whatsoever or howsoever caused arising directly or indirectly in connection with, in relation to or arising out of the use of the Content.

This article may be used for research, teaching, and private study purposes. Any substantial or systematic reproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in any form to anyone is expressly forbidden. Terms & Conditions of access and use can be found at http://www.tandfonline.com/page/terms-and-conditions

(2)

Vol. 47, No. 18, 15 September 2009, 5109–5128

Minimising makespan on parallel batch processing machines with

non-identical ready time and arbitrary job sizes

S.H. Chung*, Y.T. Tai and W.L. Pearn

Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan, ROC (Received 31 July 2007; final version received 16 December 2007) This paper considers the parallel batch processing machine scheduling problem which involves the constraints of unequal ready times, non-identical job sizes, and batch dependent processing times in order to sequence batches on identical parallel batch processing machines with capacity restrictions. This scheduling problem is a practical generalisation of the classical parallel batch processing machine scheduling problem, which has many real-world applications, partic-ularly, in the aging test operation of the module assembly stage in the manu-facture of thin film transistor liquid crystal displays (TFT-LCD). The objective of this paper is to seek a schedule with a minimum total completion time for the parallel batch processing machine scheduling problem. A mixed integer linear programming (MILP) model is proposed to optimise the scheduling problem. In addition, to solve the MILP model more efficiently, an effective compound algorithm is proposed to determine the number of batches and to apply this number as one parameter in the MILP model in order to reduce the complexity of the problem. Finally, three efficient heuristic algorithms for solving the large-scale parallel batch processing machine scheduling problem are also provided. Keywords: parallel batch; scheduling; unequal ready time

1. Introduction

The existing and growing importance of parallel batch processing machines demands a solution to its scheduling problem in order to improve efficiency of production. In this paper, a parallel batch processing machine scheduling problem with a minimum makespan criterion is presented, which has many real-world applications, particularly in the aging test operation in the manufacture of thin film transistor liquid crystal displays (TFT-LCD). On the batch processing machines in aging test operation, multiple jobs composed of different product families can be simultaneously processed as a batch. The batch processing times and batch ready times are dependent on the longest processing time and the latest ready time of all the jobs in each batch, respectively. Notably, the parallel batch processing machine scheduling problem is a multi-dimensional problem, which involves the constraints of unequal ready times, non-identical job sizes, limited machine capacity, and batch dependent processing times; the relationships among these dimensions is depicted as Figure 1. The constraints of unequal ready times and non-identical job sizes affect the determination of the number of batches which is based on the limited machine

*Corresponding author. Email: shchung@mail.nctu.edu.tw

ISSN 0020–7543 print/ISSN 1366–588X online ß 2009 Taylor & Francis

DOI: 10.1080/00207540802010807 http://www.informaworld.com

(3)

capacity and which then determines the batch processing times. Whenever batch formations are altered, the batch processing times are consequently varied and the batch sequence needs to be rescheduled in order to minimise the makespan. Since the parallel batch processing machine scheduling problem involves batch formation and scheduling with real-world constraints, it is an intractable problem for industrial planners and theoretical researchers. Therefore, the development of efficient algorithms to form appropriate batches and to arrange a suitable schedule for a parallel batch processing machine scheduling problem is difficult but critical.

The scheduling problem investigated in this paper has as its motivating cause the aging test operation in TFT-LCD manufacturing process. The TFT-LCD manufacturing process consists of four basic stages: TFT array fabrication, colour filter fabrication, LCD assembly, and module assembly, as shown in Figure 2. TFT array and colour filter fabrications are similar to the semiconductor wafer fabrication, and their process steps are also characterised by re-entrant flow. The LCD assembly simultaneously attaches the TFT and colour filter and fills the gap between them with liquid crystal. The final stage, module assembly, involves six steps in which the customer-specified components are assembled into the cells:

(1) The COG (chip on glass) process.

(2) The attachment of the flexible printed circuit board (FPC). (3) The bonding of the printed circuit board (PCB).

(4) The assembly of the backlight. (5) The aging test.

(6) The inspection (as shown in Figure 3).

unequal ready times limited machine capacity

non-identical job sizes

number of batches batch

sequence Cmax

batch dependent processing times

Figure 1. The multiple dimensions of the parallel batch processing machine scheduling problem.

Module Assembly

CF TFT

Colour Filter Fabrication

LCD Assembly TFT Array Fabrication

Figure 2. The TFT-LCD process flow.

(4)

At the end of the module assembly process, the aging test is undertaken by the only batch server in the whole process to put the assembled modules with different product families and unequal ready times into high temperature parallel batch processing machines. These machines then run aging tests for several hours to detect defects before the jobs are delivered; this batch production type is referred to as compatible product families. The processing times in the aging test operation are dependent on the longest processing time of all the jobs in the batch; they are generally longer than other serial processing operations, in particular for LCD TV products which usually take six hours to complete the aging test. Since the jobs with unequal ready times and long batch dependent processing times are processed at the end of the module assembly, the development of scheduling algorithms for the parallel batch processing machine scheduling problem is essential with a minimum makespan criterion.

This paper investigates the parallel batch processing machine scheduling problem, which involves constraints of unequal ready times, non-identical job sizes, limited machine capacity, and batch dependent processing times, is a variation of the classical parallel batch processing machine scheduling problem considered by Lee and Uzsoy (1999) and Chang et al. (2004). Due to fiercer competition in the global TFT-LCD industry, the manufacturing lead time in the throughout process for the module assembly stage has been reduced to only one or two days. This has resulted in a lower WIP (work in process) volume being maintained on the shop floor in order to accelerate the process. Due to the low level of WIP, batches need to be formed by collecting non-identical size jobs with unequal ready times at the aging test operation. The characteristic of unequal ready times makes the parallel batch processing machine scheduling problem in the aging test operation more complicated because it is sometimes advantageous to process a non-full batch to avoid excessive delays in waiting for jobs with later ready times (Mo¨nch et al. 2005). In other words, processing a full batch with late-ready-time jobs may cause a large makespan. However, taking the information of unequal ready times into consideration can lead to better decisions than those based only on the equal ready times of the system (Mo¨nch et al. 2005). In this paper, it is assumed that the ready times of jobs are known before the determination of the parallel batch processing machines schedule.

To the best knowledge of the authors, the parallel batch processing machine scheduling problem with unequal ready times and non-identical job sizes has not been considered by the other researchers in this area. This problem can be represented by P/batch, rj,

compatible/Cmax, and involves batch formation and scheduling simultaneously. In this

paper, the scheduling problem is formulated as a mixed integer linear programming (MILP) model to minimise the makespan. The programming model considers machine capacity restrictions, unequal ready times, non-identical job sizes, and batch-dependent processing times, in order to reflect real situations more accurately. A compound

COG process attachmentFPC PCB bonding AssemblyBacklight Aging test Inspection Front end Back end

Figure 3. The six steps in the module assembly process.

(5)

MILP-based algorithm is developed to determine the number of batches and to apply this number as one parameter in running the proposed MILP model. Furthermore, three efficient heuristic algorithms are also proposed. The best solution selected from the result of the MILP model and that of the compound algorithm is used here as a convenient reference point to assess the accuracy of the heuristic solutions. To demonstrate the effectiveness and efficiency of all the proposed algorithms, a set of testing problems is explored and a real-world problem is taken from a module assembly shop floor in a TFT-LCD factory located in the Science-based Industrial Park in Hsinchu, Taiwan. This paper is organised as follows. Section 2 provides the literature review, Section 3 presents the mathematical model for the problem and Section 4 presents the compound MILP-based algorithm. Three heuristic algorithms are presented in Section 5 and the computational comparisons are offered in Section 6. Finally, Section 7 provides the conclusions.

2. Literature review

In recent years, much research has focused on providing solutions to the batch processing machine (BPM) scheduling problems on a single or parallel batch processing machines. Two models of a single BPM scheduling problem with the characteristics of a common job processing time, unequal ready times and unequal due dates have been proposed by Morton and Pentico (1993). The first model concerns the one-class case that allows any two jobs with the same processing times to be simultaneously processed. Ikura and Gimple (1986) have provided efficient algorithms for this model to find a feasible schedule in order to minimise the final completion time under the assumption that ready times and due dates are agreeable, i.e. ri4 rj implies didj. The second model considers the

multi-class case that only allows jobs of the same product type to be simultaneously processed. This model is also referred to as incompatible product families. However, the parallel batch processing machine scheduling problem investigated in this paper considers the batch processing of compatible product families. It is assumed that jobs belonging to different product families may be simultaneously processed. In problems of this type, the batch processing time is computed by the longest job processing time in that batch.

The literature regarding the BPM scheduling problems on a single or parallel batch processing machines with compatible product families is shown in Table 1. However, their solution procedures have assumed that the ready times for the parallel batch processing machines are equal. This assumption prevents the developed procedure from being directly applied to the parallel batch processing machine scheduling problem investigated in this paper because the latter involves unequal ready times. Therefore, this paper arises from the need in industry to consider jobs with unequal ready times, non-identical job sizes and processing times, which are processed on identical parallel batch processing machines.

The first researchers to address the batch processing scheduling problem arising in a burn-in oven of the final test in the semi-conductor industry are Lee et al. (1992). They used dynamic programming-based algorithms and heuristics for a number of performance measures, such as maximum tardiness (Tmax), the number of tardy jobs

(Ui), and maximum lateness time (Lmax) on a single batch processing machine. They have

also presented heuristics for the parallel batch processing machine scheduling problem

(6)

with the minimum makespan (Cmax) and maximum lateness time (Lmax) criteria. They have

explored the area of scheduling batch processing machines and offered a classification of complexity for the investigated problems.

For batch processing machine scheduling problems with compatible product family characteristics, the single batch processing machine problem (Uzsoy 1994, Erramilli and Mason 2006, Kashan et al. 2006) and the two batch processing machines in a flow shop (Damodaran and Srihari 2004) do not take unequal ready times into consideration. Uzsoy (1994) investigated the single batch processing machine scheduling problem with non-identical job sizes to minimise the total completion times (Ci) of the jobs and makespan.

He has also provided bin-packing-based heuristics for minimising makespan and has used the branch and bound approach to minimise the total completion times. He also developed effective heuristics for the criteria of minimum makespan and minimum total completion time. Erramilli and Mason (2006) have investigated the multiple orders per job (MOJ) problem on a single batch processing machine. They grouped different customer orders into jobs and combined jobs into batches and scheduled them on a single batch processing machine to minimise the total weighted tardiness (wiTi) of orders. Damodaran and

Srihari (2004) have proposed two mathematical models with the minimum makespan criterion to schedule batches of jobs on two machines in a flow shop. Kashan et al. (2006) has addressed the need to minimise makespan by employing two different genetic algorithms (GAs) for scheduling jobs with non-identical sizes on a single batch processing machine. Unfortunately, all the above models do not consider the unequal ready time that is a common phenomenon in module assembly factories.

Although Lee and Uzsoy (1999), Sung and Choung (2000), Sung et al. (2002), and Van Der Zee (2004) have considered the characteristic of unequal ready times, they limited their applications to a single batch processing machine and an identical job size. Lee and Uzsoy (1999) have provided efficient heuristics to solve the scheduling problem arising in the final test phase of semiconductor manufacturing. To minimise the maximum

Table 1. The literature related to the batch processing machine scheduling problem with compatible product families.

References Shop type Ready time Job size

Performance criterion Lee et al. (1992) Single machine/parallel

machines

Unequal/equal Identical/identical Tmax, Ui, Lmax/Cmax, Lmax

Uzsoy (1994) Single machine Equal Non-identical Cmax, Ci

Erramilli and Mason (2006)

Single machine Equal Non-identical wiTi

Damodaran and Srihari (2004)

Two machines in a flow shop

Equal Non-identical Cmax

Kashan et al. (2006) Single machine Equal Non-identical Cmax

Lee and Uzsoy (1999) Single machine Unequal Identical Cmax

Sung and Choung (2000)

Single machine Unequal/equal Identical Cmax

Sung et al. (2002) Single machine Unequal Identical Cmax

Van Der Zee (2004) Single machine Dynamic arrival Identical Fi

Chang et al. (2004) Parallel machines Equal Non-identical Cmax

This paper Parallel machines Unequal Non-identical Cmax

(7)

completion time on a single batch processing machine with dynamic job arrivals, they designed three algorithms (GRLPT, DELAY, and UPDATE) to find the approximate solutions. Sung and Choung (2000) have presented a branch-and-bound algorithm and several heuristics to solve the static and dynamic cases on a single batch processing machine. Their objective was also to minimise the makespan of all jobs. Sung et al. (2002) have considered a single batch processing machine with job families and dynamic job arrivals. The performance measure used to evaluate a schedule is the minimum makespan. Van Der Zee (2004) has also presented the dynamic control of a batch processing machine; his objective was to find the minimum average flow time per product in the presence of compatible product families.

More recently, the parallel batch processing machine scheduling problem with equal ready time, non-identical job sizes, and the compatible product family characteristics is considered by Chang et al. (2004). They have provided a mathematical model and developed an algorithm based on simulated annealing (SA) approach to minimise makespan. However, they have not included the unequal ready times in their model. At the time this paper was being written, the authors were not aware of any other studies of the parallel batch processing machine scheduling problem with unequal ready time, non-identical job size, and compatible product family characteristics.

3. A mixed integer programming formulation

The mixed integer linear programming (MILP) model for the parallel batch processing machine scheduling problem with unequal ready times and non-identical job sizes in order to minimise the makespan is formulated in this section and is referred to as Model P. A set of jobs is given to be processed in batches by identical parallel machines. Let the total number of jobs be denoted by N and the number of batches be denoted by B. In this paper, however, an individual job cannot be split into different batches due to the inconvenience to practical management that might result. Let machine group M ¼ {mk| k ¼ 1, 2, . . . , K},

contain the K parallel batch processing machines. Due to the fact that the unequal ready times and batch dependent processing times are considered, they are associated with job j and have a processing time denoted by pj and a ready time denoted by rj. The batch

processing time may vary, depending on the composite jobs. Term ptb is the longest

processing time of all the jobs processed simultaneously in the bth batch, and it represents the batch processing time. The batch ready time is also the latest ready times of those composite jobs. Each job has a non-identical job size (sj). A batch can be processed on a

machine on the condition that the accumulated size of those jobs in that batch does not exceed the machine’s capacity (a maximum number of pieces can be processed simultaneously on a machine) (S0). Each job in its associated batch is a candidate that

is processed without pre-emption on one machine. The parallel batch processing machine scheduling problem is to form batches appropriately as well as to find a schedule for those batches that satisfies the ready time restrictions without violating the machine capacity constraints, while also achieving the objective of minimising makespan. Initially, it is assumed that each job will be contained in an individual batch (B ¼ N). However, after the mathematical model is solved, it may be that the better solution might require combining more than one job into one batch. Hence, by using the proposed MILP model, the number of batches required will be self-evident. Before the MILP model (Model P) is presented, the notations used in the formulation are listed below.

(8)

Indices j job index, j ¼ 1, 2, . . . , N, b batch index, b ¼ 1, 2, . . . , B, k machine index, k ¼ 1, 2, . . . , K. Decision variables xjbk

1 if job j is assigned to batch b on machine mk,

0 otherwise; 

ybb0k 1 if batch b

0is scheduled following batch b on machine m k,

0 otherwise; 

zbk

1 if batch b is assigned to machine mk,

0 otherwise; 

tbk the starting time of batch b to be processed on machine mk,

Cmax the maximum completion time (makespan).

Model P Minimise Cmaxþ XB b¼1 XK k¼1 zbk ð1Þ subject to XB b¼1 XK k¼1 xjbk¼1, for all j, ð2Þ XK k¼1 zbk1, for all b, ð3Þ XN j¼1 xjbkQ1zbk, for all b, k, ð4Þ XN j¼1 XK k¼1 sjxjbkS0, for all b, ð5Þ ptbpjxjbk, for all j, b, k, ð6Þ

Cmaxtbkþptb, for all b, k, ð7Þ

tbkrjxjbk, for all j, b, k, ð8Þ

tbkþptbtb0kþQ2ðybb0k1Þ  0, for all b, k, b06¼b, ð9Þ

ðybb0kþyb0bkÞ Q2ðzbkþzb0k2Þ  1, for all b, k, b06¼b, ð10Þ

ðybb0kþyb0bkÞ þQ2ðzbkþzb0k2Þ  1, for all b, k, b06¼b, ð11Þ

(9)

ðybb0kþyb0bkÞ Q2ðzbkþzb0kÞ 0, for all b, k, b06¼b, ð12Þ

ðybb0kþyb0bkÞ Q2ðzb0kzbkþ1Þ  0, for all b, k, b06¼b, ð13Þ

ðybb0kþyb0bkÞ Q2ðzbkzb0kþ1Þ  0, for all b, k, b06¼b, ð14Þ

xjbk2 f0,1g, for all j, b, k, ð15Þ

ybb0k2 f0,1g, for all b, k, b06¼b, ð16Þ

zbk2 f0,1g, for all b, k, ð17Þ

Cmax0: ð18Þ

The bi-functional objective of Equation (1) of Model P is to minimise the maximum completion time and the number of batches. The former is the main objective for the scheduling problem and the latter is the subsidiary one in order to reduce the complexity of the batch sequence. Therefore, the term  is a constant, which is chosen to be a sufficiently small value which cannot affect the makespan. Constraint (2) guarantees that each job is assigned to one batch and processed on exactly one machine. Constraint (3) ensures that each batch is either processed once by one machine or not at all. Constraint (4) is a contingent constraint. That is, if some jobs are assigned to batch b on machine mk

(xjbk¼1), then batch b should be assigned to machine mk(zbk¼1). Term Q1is a constant

and is greater than the total number of jobs (N). Constraint (5) is the batch size constraint, which requires that the sum of all the pieces of each job contained in each batch on one machine be simultaneously processed and within the maximum machine capacity. Constraint (6) ensures that the processing time of each batch is the longest processing time of all the jobs simultaneously processed in a batch. Constraint (7) is the maximum completion time (makespan) and is always greater than or equal to the sum of the starting and processing times for each batch. Constraint (8) indicates that the starting time of each batch is greater than or equal to the ready time of that batch. The ready time of a batch is the latest ready time of all the jobs clustered in a batch. Term Q2is the chosen constant

as it is sufficiently large in value to satisfy ybb0k¼0 or 1 which is required for constraints

(9) to (14). Constraint (9) ensures the satisfaction of the inequality in tbkþptb  tb0k,

if batch b precedes batch b0(ybb0k¼1). Constraints (10) to (14) are the precedence

constraints provided by Pearn et al. (2002). Constraints (10) and (11) guarantee that one batch should precede another (ybb0kþybb0k¼1) if two batches are scheduled on the same

machine (zbkþzb0k2 ¼ 0). It should be noted that the precedent relationships (ybb0k)

between batches b and b0on machine mkmay not be limited to direct ones. Constraint (12)

ensures that the precedence variables ybb0kand yb’bkshould be set to zero (ybb0kþyb’bk0)

if any two batches b and b0are not scheduled on the machine mk(zbkþzb0k¼0). Constraint

(13) indicates the situation in which batch b is scheduled on machine mkand batch b

0

is scheduled on another machine (zb0kzbkþ1 ¼ 0) and constraint (14) indicates the

situation in which batch b0is scheduled on machine mkand batch b is scheduled on another

machine (zbkzb0kþ1 ¼ 0). Constraints (15) to (17) indicate that xjbk, ybb0k, and zbkare

binary integer variables. Finally, constraint (18) indicates that the makespan is greater

(10)

than or equal to zero. The total number of variables is NBK þ B2K þ BK þ1 and the total number of constraint equations is

ð9=2ÞB2K þ3NBK  ð3=2ÞBK þ N þ 2B þ 1, where B is the number of batches.

To demonstrate the applicability of Model P, an illustrative example is considered. The example involves two parallel batch processing machines (m1 and m2) and seven

independent jobs with various sizes and processing times, which are ready for different starting times, as shown in Table 2. The seven jobs should be clustered into an appropriate number of batches. Those batches are scheduled on the two identical machines. The batch processing time is not affected by the machine processing it, but is dependent on the batch formation. The maximum number of pieces of one batch in a machine is set at 450 pieces in this example.

Model P is implemented using the software CPLEX OPL 3.5 to solve the seven-job example. For the example investigated, the model contains 225 variables and 736 equations. The MILP model is run on a Pentium IV 3.2GHZ PC to obtain optimal

solutions. The four batches, b1, b2, b3, and b4, are actually formed and their batch

processing times are 90, 190, 200, and 290, respectively. Job 3 is grouped into b1 and

scheduled on Machine 1. Jobs 1, 2, and 4 are grouped into b2and scheduled on Machine 2.

Moreover, jobs 6 and 7 are grouped into b3 which is scheduled on Machine 2 and

processed after b2. Job 5 is the only one in b4 and it is scheduled on Machine 1 and

processed after b1. The makespan of the example is 430 as shown in Figure 4 and the

computational time is 1041.3 CPU seconds.

4. Compound MILP-based algorithm

A compound MILP-based algorithm (CMA) improves the efficiency of the MILP model proposed in Section 3. For the parallel batch processing machine scheduling problem investigated in this paper, the number of batches and the composite jobs for each batch determine the solution quality and efficiency. It is obvious that the probable numbers of batches fall into the range, 1  B  N, in an N-job scheduling problem. The lower and upper bound values of B are obtained when all the N jobs are combined with one batch and each job is contained in an individual batch, respectively. However, exploring all the possible numbers of batches would increase the run time to obtain the optimal solution.

Table 2. Job sizes, ready times, and processing times of the seven independent jobs.

Job ID Size (pieces) Ready time Processing time

1 50 6 160 2 200 40 120 3 240 8 90 4 180 10 190 5 400 80 290 6 300 30 160 7 150 80 200

(11)

Therefore, a relaxed MILP model (Model N) focuses on the batch formation and relaxes all relative precedence constraints to obtain the lower bound of the number of batches. Model N is then provided to reduce the search space for the parallel batch processing machine scheduling problem and is applied in the CMA. In Model N, the precedence variable (ybb0k) and precedence constraints (constraints (9) to (14)) are removed. Model N

uses PBb¼1PKk¼1zbk as its objective function. Model N starts from a makespan lower

bound C0

max, which is greater than the longest processing time of all the jobs.

In this section, the compound MILP-based algorithm (CMA) is developed. The algorithm essentially consists of two phases. Phase I applies Model N to obtain the lower bound of the number of batches, which can serve as a referenced batch number in Model P. As mentioned earlier, it is sometimes advantageous to assign one more batch than the referenced batch number obtained from Phase I of the CMA to avoid excessive delays in waiting for the next scheduled late ready time job. Therefore, in Phase II, the solution of the subsequent batch number is checked. The algorithm is stated as follows and the flow chart is depicted in Figure 5.

Phase I: The number of batches is determined and applied to Model P

Step 1: Solve the following relaxed MILP model (Model N) in order to allow the number of batches formed in the optimal solution to serve as lower bound batch numbers.

Model N: Minimise X B b¼1 XK k¼1 zbk ð19Þ

subject to constraints (2)–(8), and (15),

C0maxmaxfpjg: ð20Þ

Step 2: Denote the number of lower-bound batches to be the candidate number and denote it as BN. Apply BN as one parameter to Model P developed in Section 3. Denote the solution obtained within the limited computational time as Z*.

Phase II: The solution of subsequent batch number is checked Step 1: BN ¼ BN þ 1. idle time process time 0 80 160 240 320 m1 m2 400 480 430 8 140 b4 b2 b1 98 40 230 430 b3

b1 : job 3 b2 : job 1, job 2, job 4

b3 : job 6, job 7 b4 : job 5

Figure 4. An optimal solution for the seven-job example with two parallel batch processing machines.

(12)

Step 2: If BN  N, then the batch number BN is applied as one parameter to Model P. Let the solution obtained from Model P be denoted as Z and go to Step 3. If the BN 4 N, then let Z* be the final solution and stop the algorithm.

Step 3: If Z  Z*, then let Z* be the final solution and stop the algorithm. If Z 5 Z*, then set Z as the new Z* and go back to Step 1.

It should be noted that the computational complexity of the original MILP model (Model P) developed in Section 3 is reduced when the number of lower-bound batches is obtained by using the algorithm of Phase I of the CMA. The greater the difference between the number of jobs and the number of batches, the greater is the reduction in complexity. For the example with seven jobs described in Section 3, the number of batches is four, and it is obtained by using the algorithm in Phase I of the CMA. The composite jobs for these batches are presented in Table 3.

Using four batches as the parameter for Model P, 97 variables and 316 constraint equations are obtained. The solution is a makespan of 430 and is obtained within 1.3 CPU seconds by using CPLEX OPL 3.5. Moreover, when the batch number is set to five using Step 1 of Phase II of the CMA, the makespan is also 430 but the computational time is 10 CPU seconds. Therefore, the final solution of the example with seven jobs using the CMA is 430.

Start Set Z=0, Z *=0 Check if BN ≤ N BN=BN+1 Run Model P based on BN

Set the solution of Model P as Z Check if Z ≥ Z∗ Set Z=Z * End Set solution of CMA as Z * no yes yes no Solve Model N to obtain the number of batches BN. Let BN be lower bound of number of batches. Apply BN as a parameter to Model P

Set the final solution of Model P as Z *

Phase I Phase II

Figure 5. The flow chart of the compound MILP-based algorithm (CMA).

(13)

5. Heuristic algorithms for large-scale problems

For small- and moderate-size parallel batch processing machine scheduling problems with unequal ready times and non-identical job sizes, the mixed integer linear programming model can provide optimal solutions within reasonable amounts of computational time. However, for large-size parallel batch processing machine scheduling problems, solving the mathematical model is computationally inefficient. Therefore, three heuristic algorithms are proposed to generate efficient solutions for large problems. The proposed algorithms incorporate the merits of the DELAY heuristic solution procedure proposed by Lee and Uzsoy (1999) with some modifications in order to accommodate the parallel batch processing machine environment. The DELAY heuristic algorithm allows for post-ponement in processing a batch in order to accommodate a job that is due to arrive soon and which might be combined with the delayed batch. This strategy can be used to avoid unacceptable delays in the completion of scheduled batches. At other times, however, if the expected job is due to arrive much later, it is not advantageous to delay processing as this would cause excessive delays to jobs already waiting to be processed.

The three new heuristic algorithms include the characteristics of unequal ready times, non-identical job sizes, and parallel batch processing machines; they are referred to as Heuristic Algorithm 1 (H1), Heuristic Algorithm 2 (H2), and Mixed-strategy Heuristic Algorithm (MixedH). The first two heuristic algorithms essentially consist of two phases. Phase I of each modifies the DELAY algorithm (proposed by Lee and Uzsoy 1999) to form appropriate batches by adding a machine capacity checking step in order to accommodate the constraint of non-identical job sizes to enable the processing of batches of varied numbers of jobs. Furthermore, in Phase II of the two algorithms, the original single-machine scheduling idea proposed by Lee and Uzsoy (1999) is also extended to accommodate a parallel batch processing machine environment. In this phase, the formed batches are then assigned to parallel batch processing machines and sequenced according to the batch ready times and batch processing times with a minimal makespan criterion. Finally, a mixed-strategy approach is also proposed. Algorithm details are presented as follows.

5.1 Heuristic algorithm 1 (H1)

Phase I: Batch formation(the modified DELAY algorithm; Lee and Uzsoy 1999) Step 0: Let the available set be the set of jobs which are available to be selected as a batch. Sort all jobs associated with ready times in ascending order of magnitude as an unscheduled-job list. Index the ready times in the list as ri. Assign the first job on the

unscheduled-job list into the available set. Set the decision time point (t) as the ready time of the first job (r1) in the available set and set i ¼ 1 and b ¼ 1.

Table 3. The composite jobs for each estimated batch.

Batch name Job ID Batch size

b2 1, 3, 7 440

b3 5 400

b6 6 300

b7 2, 4 380

(14)

Step 1: Arrange the jobs associated with the processing times in the available set in descending order of magnitude. Choose the required number of early jobs in the available set which satisfy the constraint of machine capacity and place them in the candidate batch (b). The longest processing time of all the jobs in batch b serves as the corresponding batch processing time and is denoted as ptb.

Step 2: Check whether there is a job (j) on the unscheduled-job list which satisfies constraints rjt þ ptband pjptb, where 0    1. If a job ( j ) satisfies the conditions,

then put job ( j ) into the candidate batch (b) and go to Step 3. Otherwise go to Step 4. Step 3: If q2bpqptb, or q2bsq4 S0where 0    3 and  ¼

PN j¼1sj=S0

l m

, then they do not form a part of the candidate batch (b); therefore, let i ¼ i þ 1, decision time point (t) be ri, and then go to Step 5. Otherwise, go to Step 4.

Step 4: Form candidate batch (b), let t ¼ t þ ptb, then remove those jobs which are formed

in batch b from the unscheduled-job list, set i ¼ 1, b ¼ b þ 1, and go to Step 6.

Step 5: Select the maximum time value between the current decision time point and the smallest ready time in the unscheduled-job list as the new decision time point. Choose the jobs which have ready times which are earlier than the new point in decision time (t) to update the available set. Go back to Step 1 to reform the candidate batch.

Step 6: Repeat Step 5 until no more candidate jobs can be found on the unscheduled-job list.

Phase II: Batch scheduling

Step 1: Calculate the batch ready time and batch process time for each batch. Step 2: Sort the batch ready times in ascending order of magnitude.

Step 3: If the ready times of some of the batches are equal, then sort the batch processing times in descending order of magnitude.

Step 4: Schedule the first batch into the first available machine and then remove the batch from the batch list.

Step 5: Repeat Step 4 of Phase II until all batches are scheduled.

In Step 2 of Phase I, Lee and Uzsoy (1999) used parameter  to accommodate the postponement idea of the DELAY heuristic algorithm. Parameter  can be used to examine whether there exists a job with a ready time which is less than or equal to the summation of the current decision time point and the  ptb time units. In addition, its

corresponding job processing time is greater than or equal to the  ptb. If such a job exists,

the job might be combined with the delayed batch to avoid delaying that job.

5.2 Heuristic algorithm 2 (H2)

In Phase II of Heuristic Algorithm 1 (H1), the batches are mainly scheduled based on their batch ready times. If the number of batches to be processed is slightly greater than the number of machines available to process them and, furthermore, if the processing times of some batches are relatively short, then the result may be that H1 performs poorly because the individual short-process-time batches have been assigned to different machines

(15)

resulting in a longer makespan. In attempting to improve the solution, an alternative approach which combines the ready and processing times is proposed. The algorithm is described in the following.

Phase I: Batch formation

Use the same process as for Phase I of Heuristic Algorithm 1 (H1). Phase II: Batch scheduling

Step 1: Calculate the batch ready times (r0

b) and the batch process times (ptb), which are

determined by the latest ready time and the longest processing time of all the jobs in one batch, respectively.

Step 2: Calculate Tb¼r0bþptb.

Step 3: Assign batches on K parallel batch processing machines using the longest pro-cessing time (LPT) rule (here it is assumed that the value of Tbrepresents the processing

time for the LPT rule).

Step 4: Sequence batches on each machine in ascending order based on batch ready times.

5.3 Mixed-strategy heuristic algorithm (MixedH)

In attempting to obtain better solutions, a mixed-strategy approach is presented. The mixed-strategy approach first uses H1 and H2 algorithms to generate two complete parallel batch processing machine scheduling problem solutions, then selects the best one. This approach is referred to as the Mixed-strategy Heuristic Algorithm (MixedH). MixedH also involves two phases. Phase I, as in Phase I of H1, determines the batch formations. However, Phase II performs the solution procedures of Phase II of H1 and H2 simultaneously to determine the final sequence and to select the value with the minimum makespan from the two solutions available.

6. Computational results and comparisons

For the purposes of testing the proposed algorithms and comparing them with the MILP model, an experiment involving two computational tests was designed to generate a series of problem instances. One computational test performed with small to moderate size problems obtains the solution quality of the proposed heuristic algorithms by comparing their solutions with the optimal solutions generated by the MILP model (Model P). The other computational test involves the large size problem taken from a module assembly process at a TFT-LCD factory in Hsinchu Science-based Industrial Park, Taiwan. In the following, two computational results are provided.

6.1 Analysis of results from small and moderate size problems

The experimental design involves two essential characteristics, ready time variation and processing time variation. These two variations are characterised by two magnitudes, large (L) and small (S). Accordingly, the ready times in a problem are generated from uniform distributions in [0, 300], [0, 100] for large and small variations, respectively. The processing times are generated from uniform distributions in [90, 300], [100, 200] for large and small

(16)

variations, respectively. The structure and data of the test problems are generated covering a wide variety of scheduling problems encountered in industrial practice. A number of machines and a number of jobs are alternated in order to get 16 problem configurations. For each problem configuration, five problem instances are randomly generated. Thus, 80 different problem instances are generated which are either small or moderate in size. The four different experimental factors are listed in Table 4. The aging oven can process a batch in which the total number of pieces from all the jobs in that batch does not exceed 450 pieces. Without loss of generality, we assume that the size of each job is less than the machine capacity (i.e. 450 pieces of panel). Once the batch processing begins, it is non-preemptive until the batch is completely processed. Processing and ready times are measured in minutes. All jobs should be formed as batches and be processed completely by the minimum makespan.

Table 5 presents the solutions generated by all the proposed algorithms on the eight small problem configurations with seven jobs in each. The values of the optimal solutions are obtained by solving the MILP model (Model P), which is formulated in Section 3. In Table 5, the problem configuration ‘7LL2’ represents the seven jobs with large ready time and large processing time variations, which are processed on two batch machines. In this testing, the run times of Model P and the CMA may vary for problem instances with different configurations. However, the run times of the CMA are significantly faster than for the original MILP model (Model P). All the solutions of the CMA are equal to the values obtained from Model P; hence the solutions are optimal. In the three heuristic algorithms, their performances are sensitive to the values of the parameters  and  (as also concluded by Lee and Uzsoy 1999). This paper provides the experiments involving the three heuristic algorithms to the testing problem instances using several values of , which are initially set to 0, 0.2, 0.4, 0.6, 0.8, and 1 (0    1) and , which are initially set to 0, 0.2, 0.4, . . . , 2.6, 2.8, and 3 (0    1). The best solution, obtained using one of the parameter combinations, is selected as the final solution to the heuristic algorithm. It is worthwhile to note that the MixedH obtains 34 (out of 40) optimal solutions within 0.8 CPU seconds for each problem instance.

Table 6 displays the results for the problem instances with 15 jobs and different configurations and their performance comparisons in terms of the makespan obtained using mathematical and heuristic algorithmic solutions. In the MILP model (Model P) and Model N of the CMA, the depth-first search strategy (Wolsey 1998) is implemented by choosing the most recently created node. To avoid the CPLEX routine which requires

Table 4. Experimental factors for small- and moderate-sized problems.

Factor Value considered

Number of values

Number of jobs (N) 7, 15 2

Ready time variation L, S 2

Processing time variation L, S 2

Number of machines (K) 2, 3 2

Total problem configurations 16

Instances per configuration 5

Total problem instances 80

(17)

a tremendous amount of computation time, the maximum run time is set at 28,800 CPU seconds. Furthermore, the nodes created cannot be greater than 1E06 in Phase II of the CMAin order to check the subsequent batch numbers repeatedly. CPLEX could stop at the pre-determined time without guaranteeing optimality for problems with high

Table 5. Run times and makespan results for 7-job problem instances.

MILP CMA H1 H2 MixedH

Problem configuration Cmax Time (sec) Cmax Time (sec) Cmax Time (sec) Cmax Time (sec) Cmax Time (sec) 1 7LL2 459 2496.0 459 11.2 459 0.672 486 0.641 459 0.688 7LL3 379 8742.0 379 71.9 379 0.625 379 0.625 379 0.656 7LS2 395 501.2 395 13.7 395 0.609 401 0.609 395 0.672 7LS3 345 1032.0 345 21.4 365 0.625 345 0.625 345 0.656 7SL2 430 1041.3 430 11.2 430 0.656 480 0.625 430 0.676 7SL3 370 648.0 370 1.7 370 0.625 370 0.688 370 0.719 7SS2 346 1268.0 346 12.1 346 0.625 393 0.625 346 0.656 7SS3 289 15,475.0 289 66.3 289 0.609 306 0.625 289 0.672 2 7LL2 607 463.0 607 5.5 607 0.613 631 0.625 607 0.656 7LL3 540 15.8 540 6.2 568 0.609 540 0.609 540 0.656 7LS2 488 482.0 488 6.4 488 0.625 502 0.672 488 0.712 7LS3 418 2899.8 418 32.6 418 0.625 422 0.625 418 0.672 7SL2 561 450.0 561 18.3 570 0.641 575 0.609 570 0.719 7SL3 435 28,052.0 435 150.3 435 0.609 435 0.609 435 0.656 7SS2 348 1376.0 348 25.2 348 0.641 367 0.703 348 0.756 7SS3 267 20,714.0 267 115.9 267 0.625 267 0.609 267 0.688 3 7LL2 522 1.6 522 1.1 522 0.625 599 0.609 522 0.734 7LL3 522 7.5 522 5.3 522 0.641 522 0.594 522 0.672 7LS2 455 1.3 455 1.1 455 0.609 471 0.594 455 0.672 7LS3 455 10.0 455 3.0 455 0.641 455 0.609 455 0.672 7SL2 424 693.3 424 8.7 424 0.641 468 0.609 424 0.734 7SL3 332 7389.2 332 4.4 358 0.625 332 0.672 332 0.692 7SS2 330 461.8 330 11.0 345 0.625 343 0.594 343 0.656 7SS3 303 23,341.0 303 85.0 318 0.625 303 0.609 303 0.813 4 7LL2 630 1606.0 630 13.1 656 0.609 656 0.609 656 0.672 7LL3 543 41721.0 543 64.8 619 0.625 543 0.625 543 0.672 7LS2 411 7.7 411 2.9 411 0.625 530 0.594 411 0.656 7LS3 411 12.4 411 6.8 411 0.672 411 0.609 411 0.734 7SL2 512 4209.9 512 7.7 512 0.625 534 0.672 512 0.756 7SL3 425 31,346.8 425 117.8 465 0.625 425 0.703 425 0.741 7SS2 313 462.8 313 9.6 317 0.625 336 0.609 317 0.641 7SS3 258 22,398.0 258 61.6 261 0.625 258 0.609 258 0.641 5 7LL2 574 1306.8 574 6.4 592 0.641 590 0.641 590 0.656 7LL3 555 7.6 555 5.3 555 0.625 555 0.609 555 0.655 7LS2 453 1.6 453 0.7 454 0.625 453 0.703 453 0.741 7LS3 453 10.9 453 4.8 453 0.609 453 0.719 453 0.741 7SL2 498 3310.0 498 15.6 498 0.625 534 0.609 498 0.766 7SL3 398 43,339.0 398 134.2 398 0.719 398 0.609 398 0.752 7SS2 371 3748.0 371 23.1 393 0.609 373 0.672 373 0.741 7SS3 294 22,360.0 294 96.1 298 0.625 294 0.609 294 0.719

Note: The underlined values represent the best solutions for each problem instance from among all of the algorithms.

(18)

computational complexity. However, the depth-first search strategy can incorporate the strong branching rule (Wolsey 1998) causing the variable selection based on partially solving a number of sub-problems with tentative branches in order to find the most promising branch. Table 6 shows that the performances of the CMA are reasonably good;

Table 6. Run times and makespan results for 15-job problem instances.

MILP CMA H1 H2 MixedH

Problem configuration Cmax Time (sec) Cmax Time (sec) Cmax Time (sec) Cmax Time (sec) Cmax Time (sec) 1 15LL2 592 28,800.0 579 786.8 610 0.844 612 0.797 610 0.947 15LL3 552 28,800.0 552 15.3 552 0.781 552 0.781 552 0.931 15LS2 467 250.6 467 5.1 467 0.781 467 0.766 467 0.916 15LS3 467 7471.3 467 19.8 467 0.797 467 1.031 467 1.041 15SL2 532 28,800.0 532 1096.2 532 0.813 575 0.766 532 0.994 15SL3 382 28,800.0 382 2789.5 382 0.875 382 0.875 382 0.947 15SS2 372 28,800.0 372 1252.5 409 0.828 392 0.766 392 0.931 15SS3 276 28,800.0 275 2225.0 303 0.938 275 0.766 275 0.994 2 15LL2 614 28,800.0 605 3756.1 629 0.813 713 0.766 629 0.978 15LL3 565 642.0 565 17.4 565 0.797 565 0.750 565 0.947 15LS2 498 28,800.0 498 3063.0 516 0.797 551 0.797 516 0.931 15LS3 478 28,800.0 478 31.6 478 0.813 478 0.750 478 0.931 15SL2 500 28,800.0 475 1085.9 475 0.813 537 0.750 475 0.963 15SL3 380 28,800.0 380 150.7 380 0.797 380 0.750 380 0.916 15SS2 380 28,800.0 374 8478.0 380 0.781 403 0.766 380 0.947 15SS3 293 28,800.0 293 183.9 293 0.797 293 0.750 293 0.931 3 15LL2 505 28,800.0 505 902.3 505 0.797 596 0.750 505 0.963 15LL3 442 28,800.0 442 48.2 442 0.781 442 0.750 442 0.916 15LS2 455 28,800.0 455 872.4 467 0.781 498 0.750 467 0.931 15LS3 424 28,800.0 424 18.8 426 0.875 426 0.813 426 0.963 15SL2 425 28,800.0 425 999.0 428 0.797 466 0.750 428 0.931 15SL3 323 28,800.0 314 1089.0 323 0.797 314 0.766 314 0.931 15SS2 375 28,800.0 375 1290.0 393 0.781 420 0.750 393 0.916 15SS3 318 28,800.0 306 3012.9 315 0.797 306 0.750 306 0.947 4 15LL2 495 28,800.0 495 1185.0 516 0.797 546 0.750 516 0.931 15LL3 445 28,800.0 445 16.9 445 0.859 469 0.813 445 0.978 15LS2 435 28,800.0 422 997.7 435 0.781 456 0.828 435 0.947 15LS3 370 28,800.0 370 1275.5 375 0.781 390 0.734 375 0.892 15SL2 459 28,800.0 459 1323.0 473 0.797 473 0.750 473 0.910 15SL3 369 28,800.0 369 219.0 369 0.781 369 0.766 369 0.947 15SS2 384 28,800.0 383 1437.0 403 0.766 410 0.734 403 0.916 15SS3 327 28,800.0 327 3684.0 331 0.781 331 0.750 331 0.916 5 15LL2 553 28,800.0 553 1014.7 586 0.828 590 0.766 586 0.963 15LL3 538 813.0 538 13.1 538 0.797 538 0.781 538 0.916 15LS2 454 28,800.0 454 472.2 464 0.875 488 0.828 464 0.994 15LS3 451 28,800.0 451 22.7 451 0.859 451 0.828 451 0.993 15SL2 517 28,800.0 477 1483.9 505 0.797 517 0.750 505 0.916 15SL3 363 28,800.0 350 697.5 363 0.828 363 0.750 363 0.916 15SS2 374 28,800.0 368 3138.0 390 0.797 390 0.750 390 0.900 15SS3 324 28,800.0 321 4298.0 368 0.813 326 0.750 326 0.947

Note: The underlined values represent the best solutions for each problem instance from among all of the algorithms.

(19)

that is, with all the problem instances it achieved better solutions than the original MILP model (Model P). Furthermore, the three heuristic algorithms perform well and efficiently. As seen in Table 6, due to its solution strategy, the MixedH provides the best solutions of all three heuristic algorithms for all problem configurations.

Table 7 displays the performance comparisons among the five algorithms in terms of (1) average rank, (2) average run times, (3) number of problem instances receiving the best solutions, and (4) number of optimal solutions. The results indicate that the CMA can obtain 40 (out of 40) optimal solutions for the seven-job test problem instances and it can perform remarkably well for the 15-job problem instances. The CMA significantly speeds up the original MILP model in test problem instances. It should also be noted that all three heuristic algorithms run very fast. With the 80 problem instances tested, it was found that two of them required more than 1 CPU seconds on a Pentium IV 3.2 GHz PC. To access the accuracy of the heuristic solutions, the best solution selected from the CMA and the original MILP model (Model P) is used for each problem instance as a convenient reference point. The average percentage deviations between the MixedH and the selected best solutions are 0.36% and 1.8% for seven-job and 15-job problem instances, respectively. The percentage deviation is defined as (VMixedHV)/V, where VMixedH and

Vare the values for each problem instance which is obtained using the MixedH and the two mathematically based algorithms, respectively. The CMA may perform inefficiently as the number of jobs increases to the large scale usual in real-world factories. Thus, if the computational time is a primary concern, MixedH can solve real-world problems well.

6.2 Analysis of the result based on the large scaled problem

To demonstrate the applicability of the MixedH heuristic algorithm in real world problems, the following problem taken from a module assembly process of a TFT-LCD factory in Hsinchu Science-based Industrial Park, Taiwan, is considered. For the parallel batch processing machine scheduling problem in the aging test operation, there are 100 jobs (which can be categorised into 35 product families) to be processed on six identical aging test machines arranged in parallel. The maximum batch size in one machine is 450 pieces of panel. It is assumed that the job testing recipes require the same testing temperature, which is normally set to a high temperature (55C).

Table 7. Comparisons of the five algorithms.

Problem MILP CMA H1 H2 MixedH

7-job Average rank among the five algorithmsa 1 1 2.23 2.9 1.3

Average run times (in CPU seconds) 7335.3 31.5 0.629 0.630 0.696 Number of problem instances receiving

the best solutions

40 40 25 19 34

Number of optimal solutions 40 40 25 19 34

15-job Average rank among the five algorithmsa 1.6 1 2.3 3.1 1.95

Average run times (in CPU seconds) 26149 1362 0.810 0.776 0.943 Number of problem instances receiving

the best solutions

26 40 15 15 19

Number of optimal solutions 4 4 4 4 4

Note:aThe smallest rank value indicates the best solutions among all algorithms.

(20)

In order to solve the real-world aging test problem with unequal ready times and non-identical job sizes using the MixedH algorithm, the program codes of the three heuristic algorithms are written in Visual Basic 6.0. As a result, the MixedH algorithm runs quite efficiently. In fact, the MixedH algorithm takes 6.8 CPU seconds to obtain makespan 1330 on six aging test machines.

7. Conclusions

This paper tackled the parallel batch processing machine scheduling problem with unequal ready times, non-identical job sizes, limited machine capacity, and batch dependent processing times. This problem is a variation of the classical parallel batch processing machine scheduling problem, which has many real-world applications. To the best knowledge of the authors, the parallel batch processing machine scheduling problem has not been considered before. In this paper, the scheduling problem is formulated as a mixed integer linear programming model considering batch formation and batch scheduling simultaneously. To reduce the complexity associated with a search of all probable numbers of batches, an effective compound MILP-based algorithm (CMA) is proposed to pre-determine the number of batches and then to apply the number as a parameter of the MILP model. From the computational tests conducted in the paper, the CMA significantly outperforms the original MILP model (Model P) within the limited computational time. Furthermore, if the computational time is a primary concern, three efficient heuristic algorithms are also developed for solving large-scale problems. The performances of the three heuristic algorithms are quite satisfactory. In particular, the MixedH shows its superiority with respect to run time and solution quality, which are essential for real-world factories to schedule their batch processing machines. A real-world problem taken from a module assembly shop floor at a TFT-LCD factory is solved by using MixedH to obtain the near optimal solution within a few CPU seconds. From this investigation, two possible concerns might be useful in further research. The first involves solving a batch processing machine scheduling problem which involves continuous multiple-batch operations. The second is the need to minimise the maximum completion time involved in the consid-eration of setup times for the parallel batch processing machine scheduling problem with unequal ready times and incompatible product families.

References

Chang, P.Y., Damodaran, P., and Melouk, S., 2004. Minimising makespan on parallel batch processing machines. International Journal of Production Research, 42, 4211–4220.

Damodaran, P. and Srihari, K., 2004. Mixed integer formulation to minimise makespan in a flow shop with batch processing machines. Mathematical and Computer Modelling, 40, 1465–1472.

Erramilli, V. and Mason, S.J., 2006. Multiple orders per job compatible batch scheduling. IEEE Transactions on Electronics Packaging Manufacturing, 29 (4), 285–296.

Ikura, Y. and Gimple, M., 1986. Efficient scheduling algorithms for a single batch processing machine. Operations Research Letters, 5, 61–65.

Kashan, A.H., Karimi, B., and Jolai, F., 2006. Effective hybrid genetic algorithm for minimising makespan on a single-batch-processing machine with non-identical job sizes. International Journal of Production Research, 44, 2337–2360.

(21)

Lee, C.Y. and Uzsoy, R., 1999. Minimising makespan on a single batch processing machine with dynamic job arrivals. International Journal of Production Research, 37 (1), 219–236.

Lee, C.Y., Uzsoy, R., and Martin-Vega, L.A., 1992. Efficient algorithms for scheduling semi-conductor burn-in operations. Operations Research, 40 (4), 764–775.

Mo¨nch, L., et al., 2005. Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Computer & Operations Research, 32, 2731–2750. Morton, T.E. and Pentico, D.W., 1993. Heuristic scheduling systems: with applications to production

systems and project management. New York: John Wiley & Sons.

Pearn, W.L., Chung, S.H., and Yang, M.H., 2002. Minimising the total machine workload for the wafer probing scheduling problem. IIE Transactions, 34, 211–220.

Sung, C.S. and Choung, Y.I., 2000. Minimising makespan on a single burn-in oven in semiconductor manufacturing. European Journal of Operational Research, 120, 559–574.

Sung, C.S., et al., 2002. Minimising makespan on a single burn-in oven with job families and dynamic job arrivals. Computer & Operations Research, 29, 995–1007.

Uzsoy, R., 1994. Scheduling of a single batch processing machines with non-identical job sizes. International Journal of Production Research, 32, 1615–1635.

Van Der Zee, D.J., 2004. Dynamic scheduling of batch servers with compatible product families. International Journal of Production Research, 42, 4803–4826.

Wolsey, L.A., 1998. Integer programming. 1st ed. New York: John Wiley & Sons.

數據

Figure 1. The multiple dimensions of the parallel batch processing machine scheduling problem.
Figure 3. The six steps in the module assembly process.
Table 1. The literature related to the batch processing machine scheduling problem with compatible product families.
Table 2. Job sizes, ready times, and processing times of the seven independent jobs.
+7

參考文獻

相關文件

Department of Mathematics, National Taiwan Normal University,

--coexistence between d+i d singlet and p+ip-wave triplet superconductivity --coexistence between helical and choral Majorana

2 Center for Theoretical Sciences and Center for Quantum Science and Engineering, National Taiwan University, Taipei 10617, Taiwan..

2 Center for Theoretical Sciences and Center for Quantum Science and Engineering, National Taiwan University, Taipei 10617, Taiwan..

Department of Mathematics, National Taiwan Normal University, Taiwan..

2 Department of Materials Science and Engineering, National Chung Hsing University, Taichung, Taiwan.. 3 Department of Materials Science and Engineering, National Tsing Hua

Department of Physics and Institute of nanoscience, NCHU, Taiwan School of Physics and Engineering, Zhengzhou University, Henan.. International Laboratory for Quantum

Department of Mathematics, National Taiwan Normal University, Taiwan..