A Novel Hybrid MCDM Procedure for Achieving Aspired Earned Value Project Performance
全文
數據
相關文件
The Performance Evaluation for Horizontal, Vertical and Hybrid Schema in Database Systems.. -A Case Study of Wireless Broadband
The aims of this study are: (1) to provide a repository for collecting ECG files, (2) to decode SCP-ECG files and store the results in a database for data management and further
The purpose of this research is to explore the important and satisfaction analysis of experiential marketing in traditional bakery industry by using Importance-Performance and
Theory of Project Advancement(TOPA) is one of those theories that consider the above-mentioned decision making processes and is new and continued to develop. For this reason,
Thus, the purpose of this study is to determine the segments for wine consumers in Taiwan by product, brand decision, and purchasing involvement, and then determine the
The results showed that (1) in the evolution process of GNN, two phenomena can be observed that “the training period performance is truly relevant to test period performance” and
This study investigates the effects of the initial concentration, initial pH value, and adsorption temperature on the adsorption behaviors between Cr(IV) ion with a
The purpose of this study was to explore the effects of learning organization culture on teachers’ study and teaching potency in Public Elementary Schools.. The research tool of