Process Parameters Optimization: A Design Study for TiO2 Thin Film of Vacuum Sputtering Process
全文
相關文件
2-1 註冊為會員後您便有了個別的”my iF”帳戶。完成註冊後請點選左方 Register entry (直接登入 my iF 則直接進入下方畫面),即可選擇目前開放可供參賽的獎項,找到iF STUDENT
The continuity of learning that is produced by the second type of transfer, transfer of principles, is dependent upon mastery of the structure of the subject matter …in order for a
* All rights reserved, Tei-Wei Kuo, National Taiwan University, 2005..
The remaining positions contain //the rest of the original array elements //the rest of the original array elements.
The presentation or rebranding by a company of an established product in a new form, a new package or under a new label into a market not previously explored by that company..
The manufacturing cycle time (CT) of completing the TFT-LCD processes is about 9~13 days which is the summation of about 5-7 days for Array process, 3-5 days for Cell process and 1
“ Customer” ,employs the fuzzy analytic hierarchy process (FAHP) to develop a systematic model for the evaluations of knowledge management effectiveness , to reach the goal
Thus, the proposed approach is a feasible and effective method for process parameter optimization in MIMO plastic injection molding and can result in significant quality and