第八章 結論與未來研究方向
8.2 未來研究方向
本論文在配電饋線型態升級上的研究,主要針對其影響因素、對 原系統所造成之影響與衝擊,以及必須採行之相關配套措施等作深入 的探討與分析,雖已獲至初步的成果;然而,常閉環路相關問題尚待 研究者仍多,在此不揣淺陋提出後續研究方向,供有興趣者參考。
1. 應用地理資訊系統(Geographic Information System, GIS)於配 電常閉環路系統之規劃、設計研究。
2. 考慮成本效益及供可靠度之常閉環路系統規劃、設計研究。
3. 利用最佳化方法,如基因演算法(Genetic Algorithms, GA) 或 進化演算法(Evolutionary Algorithms, EA)等尋求常閉環路饋線 之最佳負載轉供策略。
參考文獻
[1] T. H. Chen and J. T. Cherng, “Design of a TLM Application Program Based on an AM/FM/GIS System,” IEEE Transactions on Power Systems, Vol. 13, pp. 904-909, August (1998).
[2] P. Heine, A. Lehtonen and E. Lakervi, “Voltage Sag Analysis Taken Into Account in Distribution Network Design,” IEEE Power Tech Proceedings, Porto , Vol. 3 , 10-13 September (2001).
[3] M. Lehtonen, A. Matsinen, E. Antila, J. Kuru, P. Vuorenpaa, E.
Matinlassi, and S. Pettissalo, “Automatic Fault Management in Distribution Networks,” 16th International Conference and Exhibition on Electricity Distribution Part 1: Contributions CIRED, No.
482, Vol. 3, 18-21 June (2001).
[4] Y. T. Chao, S. T. Lee, H. C. Chang and T. H. Chen, “An Improvement Project for Distribution Transformer Load Management in Taiwan,” IEEE Transactions on Power Systems, Vol.
18, pp. 875- 881, May (2003).
[5] S. Kearney, “How Outage Management Systems Can Improve Customer Service,” IEEE 8th International Conference on Transmission & Distribution Construction, Operation & Live-Line Maintenance, pp. 172-178, 26-30, April (1998).
[6] D. C. Nelson, “Evaluation, Selection and Implementation of An AM/FM System,” the 37th Annual Conference, Rural Electric Power Conference, pp. B1/1-B1/8, 25-27 April (1993).
[7] T. E. Lee, C. S. Chen, Y. M. Tzeng, M. S. Kang, C. C. Lee, J. S. Wu, T. S. S. Liu and Y. M. Chen, “The Application of AM/FM System to Distribution Contingency Load Transfer,” IEEE Transactions on Power Delivery, Vol. 10, pp. 1126-1135, April (1995).
[8] Y. L. Ke, “Application of GCN Approach for Power Distribution System Contingency Load Transfer,” IEE Proceedings-Generation, Transmission and Distribution, Vol. 150, pp. 717-721, November (2003).
[9] C. C. Liu, S. J. Lee and S. S. Venkata, “An Expert System
Operational Aid for Restoration and Loss Reduction of Distribution Systems,” IEEE Transactions on Power Systems, Vol. 3, pp. 619-626, May (1988).
[10] Youman Deng, Le Cai and Yixin Ni, “Algorithm for Improving the Restorability of Power Supply in Distribution Systems,” IEEE Transactions on Power Delivery, Vol.18, pp. 1497-1502 (2003).
[11] J. Marks, “New Technology Improves Loop-Feeder Sectionalizing,”
Electrical World, pp.34-36, February (1997).
[12] Y. Fukuyama and H. D. Chiang, “A parallel genetic algorithm for service restoration in electric power distribution systems,” IEEE International Conference on Fuzzy Systems and The Second International Fuzzy Engineering Symposium, vol.1, pp. 275-282.
[13] J. Reson, “Customer Demand for Quality Spur Feeder Sectionalizing,” Electrical World, pp.32-35, November (1990).
[14] D. Shirmohammadi, “Service Restoration in Distribution Networks via Network reconfiguration,” IEEE Transactions on Power Delivery, Vol. 7, No. 2, pp. 952-958, April (1992).
[15] E. Lakervi and E. J. Holmes, Electricity distribution network design, 2nd ed., London, United Kingdom: Perter Peregrinus Ltd., pp. 176-177 (1995).
[16] A. A. Chowdhury and D. O. Koval, “Value-Based Distribution System Reliability Planning,” IEEE Transactions on Industry Applications, Vol. 34, No. 1, pp. 23-29, January (1998).
[17] R. E. Brown and J. R. Ochoa, “Distribution System Reliability:
Default Data and Model Validation,” IEEE Transactions on Power Systems, Vol. 13, pp. 704-709 (1998).
[18] R. E. Brown, S. Gupta, R. D. Chrictie, S. S. Ventata, and R. Fletcher,
“Distribution System Reliability Assessment Using Hierarchical Markvo Modeling,” IEEE Transactions on Power Delivery, Vol. 11, pp. 1929-1934 (1996).
[19] J. G. Tine and D. A. Walder, “Improved Distribution System Reliability at Northeast Utilities: a Case History,” IEEE Transactions on Power Delivery, Vol. 8, No. 2, pp. 689-696, April (1993).
[20] 陳在相、黃維澤,「配電系統型態與變電所饋線數選用原則與
效益分析—總計畫及子計畫一:配電系統型態及其與配電自動 化之互動研究」,國科會電力科技產業學術合作研究計劃,完 成報告,NSC 89-TPC-011-001,國立臺灣科技大學,台北,25 August (2000).
[21] James J. Burke, Power Distribution Engineering: fundamentals and applications, Marcel Dekker Inc (1994).
[22] Barry. Pagel, “Energizing International Drive,” Transmission &
Distribution World, pp.18-34, April (2000).
[23] J. C. Appleyard, D. A. Myers and J. K. Niemira, “Innovations in Use of Microprocessor Relays and Controls for Improved Reliability on the Distribution System,” in Proc. 2001 IEEE/PES Transmission and Distribution Conference and Exposition,Vol. 1, pp. 293-298 (2001).
[24] J. C. Tobias, F. Sautriau, D. J. Hull and S. Fabray, “Improved Quality of Supply in MV Distribution Networks Using Directional Blocking Scheme,” CIRED 97, IEE Publication No. 438, pp. 4.29.1-5 (1997).
[25] R.P. Leeuwerke, A.L Brayford, A. Robinson, J.C. Tobias,
“Developments in ring main unit design for improved MV network performance,” Power Engineering Journal, Vol. 14 Issue: 6, pp. 270-277, December (2000).
[26] J. C. Tobias, R. P. Leeuwerke, A. L. Brayford and A. Robinson, “The Use of Sectionalising Circuit Breakers in Urban MV Distribution Networks,” Trends in Distribution Switchgear, IEE Publication No.
459, pp. 102-108 (1998).
[27] T. C. Yu, Principles and Design of Low Voltage Systems, Singapore:
Byte Power Publications, pp. 13-14 (1996).
[28] W. T. Huang, T. H. Chen, G. C. Pu, Y. F. Hsu and T. Y. Guo,
“Assessment of Upgrading Existing Primary Feeders from Radial to Normally Closed Loop Arrangement,” in Proc. 2002 IEEE Power Engineering Society Transmission and Distribution Conf., pp. 2123-2128 (2002).
[29] T. H. Chen, W. T. Huang, G. C. Pu, Y. F. Hsu and T. Y. Guo,
“Feasibility Study of Upgrading Primary Feeders from Radial and
Transactions on Power Systems, pp. 1308-1316 (2004).
[30] T. Gönen, Electric Power Distribution System Engineering, McGraw-Hill, New York, (1986).
[31] Yuen, M. H., Short circuit ABC, Gas Industries Association, San Francisco, (1975).
[32] Chen, T. H., “Complex short circuit MVA method for power system studies,” IEE Proceedings on Generation, Transmission and Distribution, Vol. 141, pp. 81-84 (1994).
[33] Chen, T. H. and Chuang, H. J., “Applications of the complex short- circuit MVA method to power flow studies,” Electric Power Systems Research, pp.135-143 (1996).
[34] 陳在相、辜志承、黃維澤、林金順、蔡金龍、于尚禮、蒲冠 志、許炎豐,「配電系統採常閉環路可行性研究」,臺灣電力 股份有限公司八十九年研究計劃 531-2103-06,計畫編號(GRB 檔):88-2103-07,完成報告,研發建字第 1225 號,電機建字第 0095 號,台灣科技大學,台北,31 October (1999).
[35] 陳在相、辜志承、黃維澤、沈混源、游伯煌、趙恆寬、蒲冠 志、許炎豐,「配電系統採同一主變常閉環路之建置」,臺灣 電力股份有限公司八十九年研究計劃,計畫編號(GRB 檔):
2103-13,期末報告,研發建字第 1478 號,電機建字第 0136 號,國立臺灣科技大學,台北,31 May (2001).
[36] T. H. Chen and S. W. Wang, “Applications of simplified bi-directional feeder models for accelerating the voltage-drop and power-loss calculations,” in Proc. 1995 Energy Management and Power Delivery Conf. on vol. 2, pp. 708-713 (1995).
[37] T. H. Chen and S. W. Wang, “Simplified bidirectional-feeder models for distribution-system calculations,” Proc. IEE, vol. 1425, pp. 459-467, September (1995).
[38] N. Vemptati, R. R. Shoults, M. S. Chen and L. Schwobel,
“Simplified Feeder modeling for Load Flow calculations,” IEEE Trans. Power Systems, vol. PWRS-2, no. 1, pp. 168-174, February (1987).
[39] E. R. Ramos, J. L. Martinez-Ramos, A. G. Exposito and A. J. U.
Salado, “Optimal Reconfiguration of Distribution Networks for Power Loss Reduction,” Power Tech Proceedings, 2001 IEEE Porto, Vol. 3, 10-13 September (2001).
[40] M. E. Baran and F. F. Wu, “Network Reconfiguration in Distribution Systems for Loss Reduction and Load Balancing,” IEEE Transactions on Power Delivery, Vol. 4, Issue: 2, pp. 1401-1407, April (1989).
[41] A. Merlin and H. Back, “Search for a Minimal-Loss Operating Spanning Tree Configuration in an Urban Power Distribution System,” Proc. 5th Power System Computation Conference (PSCC), Cambridge, United Kingdom, pp.1-18, (1975).
[42] D. Shirmohammadi and H. W. Hong, “Reconfiguration of Electric Distribution Networks for Resistive Line Losses Reduction,” IEEE Transactions on Power Delivery, Vol. 4, No. 2, pp. 1492-1498, April (1989).
[43] R. Taleski and D. Rajicic, “Distribution Network Reconfiguration for Energy Loss Reduction,” IEEE Transactions on Power Systems, Vol.
12, No. 1, pp. 398-406, February (1997).
[44] W. M. Lin and H. C. Chin, “A New Approach for Distribution Feeder Reconfiguration for Loss Reduction and Service Restoration,”
IEEE Transactions on Power Delivery, Vol. 13, No. 3, pp. 870-875, July, (1998).
[45] C. S. Chen, J. S. Wu and Y. N. Chang, “Criteria for Interfeeder Switching in Distribution Systems,” IEE Proceedings-C, Vol. 135, No. 5, pp. 461-467 (1988).
[46] Y. T. Hsiao and C. Y. Chien, “Multiobjective optimal feeder reconfiguration,” IEE Proceedings- Generation, Transmission and Distribution, Vol. 148, Issue: 4, pp. 333 – 336, July (2001).
[47] Y. Zhao, J. Li and D. Xia, “Distribution network optimal operation for loss reduction and harmonic mitigation,” Proceedings of Power System Technology, PowerCon 2002, Vol. 4, pp. 2522 – 2525, October (2002).
[48] T. H. Chen and J. T. Cherng, “Optimal Phase Arrangement of Distribution Transformers Connected to a Primary Feeder for System
Unbalance Improvement and Loss reduction Using a Genetic Algorithm,” IEEE Transactions on Power Systems, Vol. 15, Issue:
3, pp. 994-1000, August (2000).
[49] W. M. Lin, Y. S. Su, S. C. Chang, M. T. Tsay and S. J. Chen, “The optimal loss reduction of distribution feeder based on special distribution transformers reconnection using genetic algorithm,”
Proceedings of Power System Technology, PowerCon 2000, , Vol. 3, pp. 1413-1418, December (2000).
[50] G. Levitin, A. Kalyuzhny, A. Shenkman and M. Chertkov,
“Optimal capacitor allocation in distribution systems using a genetic algorithm and a fast energy loss computation technique,” IEEE Transactions on Power Delivery, Vol. 15 , Issue: 2 , pp. 623-628, April (2000).
[51] B. A. de Souza, Hd. N. Alves and H. A. Ferreira, “Microgenetic algorithms and fuzzy logic applied to the optimal placement of capacitor banks in distribution networks,” IEEE Transactions on Power Systems, Vol. 19, Issue: 2, pp. 942-947, May (2004).
[52] M.H. Haque, “Capacitor placement in radial distribution systems for loss reduction,” IEE Proceedings- Generation, Transmission and Distribution, Vol. 146, Issue: 5, pp. 501-505, September (1999).
[53] T. C. Yu, Principles and Design of Low Voltage Systems, Singapore:
Byte Power Publications, pp. 13-14, (1996).
[54] B. Pagel, “Energizing International Drive,” Transmission &
Distribution World, pp.18-34, April (2000).
[55] R. P. Leeuwerke, A. L. Brayford, A. Robinson, and J. C. Tobias,
“Developments in ring main unit design for improved MV network performance,” Power Engineering Journal, Vol. 14 , Issue:
6, pp.270- 277,December (2000).
[56] J. C. Tobias, F. Sautriau, D. J. Hull and S. Fabray, “Improved Quality of Supply in MV Distribution Networks Using Directional Blocking Scheme”, CIRED 97, IEE Publication No. 438, pp. 4.29.1-5, (1997).
[57] Wei-Tzer Huang, Tsai-Hsiang Chen, Guan-Chih Pu, Yen-Feng Hsu and Tzong-Yih Guo, “Assessment of Upgrading Existing Primary
Feeders from Radial to Normally Closed Loop Arrangement,”
Proceedings of the IEEE / PES Transmission and Distribution Conference and Exhibition 2002: Asia Pacific, Yokohama, Japan, pp.
2123-2128, October (2002).
[58] Wei-Tzer Huang, Tsai-Hsiang Chen, Jyh-Cherng Gu, Heng-Kuan Chao, Guan-Chih Pu, Yen-Feng Hsu and Tzong-Yih Guo, “Analysis of the Operating Characteristics of Normally Closed Rings Fed by the same Main Transformer,” Proceedings of the 22nd Symposium on Electrical Power Engineering, Kaoshiung, Taiwan, pp. 869-872, November (2001).
[59] Tsai-Hsiang Chen, Jyh-Cherng Gu, Wei-Tzer Huang, Heng-Kuan Chao, Kun-Yuan Shen, Tsung-Ling Chuang, Guan-Chih Pu and Yen-Feng Hsu, “Analysis of Characteristics of Normally Closed Loop Primary Feeders Fed by Distinct Transformers in a Substation,”
Proceedings of the 23rd Symposium on Electrical Power Engineering, Taoyuan, Taiwan, pp. 1046-1050, December (2002).
[60] Jyh-Cherng Gu, Tsai-Hsiang Chen, Kun-Yuan Shen, Wei-Tzer Huang, Tsung-Ling Chuang, Heng-Kuan Chao, Tzong-Yih Guo, Guan-Chih Pu, Yen-Feng Hsu, “Protection Coordination Analysis of Closed-Loop Distribution System,” Proceedings of the 23rd Symposium on Electrical Power Engineering, Taoyuan, Taiwan, pp.
1026-1030, December (2002).
[61] Willian H. Kersting, Distribution System Modeling and Analysis, CRC Press, (2002).
[62] Kao Chen, Industrial power distribution and illuminating systems, Marcel Dekker Inc., (1990).
[63] 陳在相、辜志承、黃維澤、沈混源、趙恆寬、莊宗霖、蒲冠 志、許炎豐,「配電系統採同一變電所不同主變常閉環路建置 研究」,臺灣電力股份有限公司九十年研究計劃,計畫編號 (GRB 檔):2103-05,期末報告,研發建字第 1478 號,電機建字 第 0136 號,國立臺灣科技大學,台北,31 May (2002).
[64] 李宏任,實用保護電驛,全華科技圖書股份有限公司,April (2000).
[65] 成政田,配電系統個別相負載計算技巧及其應用,國立台灣科 技大學博士論文,民國八十八年。
[66] 王錫文,配電系統規劃與分析用之簡化饋線模型推導與應用,
國立台灣工業技術學院博士論文,民國八十五年。
作者簡介
◎ 個人資料
姓 名:黃維澤 (Wei-Tzer Huang) 出生日期:民國 60 年 8 月 15 日 出 生 地:台灣省南投縣
◎ 主要學歷
z 國立台灣科技大學 電機工程研究所博士班 (88.9 ~迄今) z 國立台灣科技大學 電機工程研究所碩士 (86.9 ~ 88.6) z 國立台灣工業技術學院 電機工程技術系學士 (84.9 ~ 86.6)
◎ 工作經歷
z 私立智光商工資訊科 教師 (87.8 ~ 88.7)
z 私立建國技術學院電機工程系 講師 (89.9 ~93.7) z 私立建國科技大學電機工程系 講師 (93.8 ~93.10) z 私立建國科技大學電機工程系 助理教授 (93.11 ~迄今)
◎ 論文著作
一、期刊論文
1. Tsai-Hsiang Chen, Wei-Tzer Huang, Jyh-Cherng Gu, Guan-Chih Pu, Yen-Feng Hsu, and Tzong-Yih Guo," Feasibility Study of Upgrading Primary Feeders from Radial and Open-Loop to Normally Closed-Loop Arrangement," IEEE Transactions on Power Systems, Vol. 19, No. 3, pp. 1308-1316, August 2004.
2. Tsai-Hsiang Chen, Jyh-Cherng Gu, Wei-Tzer Huang, Kun-Yuan Shen, Heng-Kuan Chao, Tsung-Ling Chuang, Guan-Chih Pu, Yen-Feng Hsu,
" Study on the construction of normally closed-loop primary circuits fed by two main transformers in the same substation," Monthly Journal of Taipower's Engineering, Vol. 655, Taipei, Taiwan, pp. 40-66,
March 2003.
3. Tsai-Hsiang Chen, Jyh-Cherng Gu, Wei-Tzer Huang, Kun-Yuan Shen, Heng-Kuan Chao, Tsung-Ling Chuang, Guan-Chih Pu, Yen-Feng Hsu, Tzong-Yih Guo, "Construction of Closed-loop Distribution Circuits Fed by a Main Transformer," Monthly Journal of Taipower's Engineering, Vol. 644, Taipei, Taiwan, pp. 26-63, April 2002.
4. Tsai-Hsiang Chen, Jyh-Cherng Gu, Wei-Tzer Huang, Chin-Shun Lin, Chin-Lung Tsai, Sun-Li Yu, Tzong-Yih Guo, Guan-Chih Pu and Yen-Feng Hsu, "Feasibility Study of applying Close Loop in Taipower Distribution Systems," Monthly Journal of Taipower's Engineering, Vol. 625, Taipei, Taiwan, pp. 50-85, September 2000.
5. Tsai-Hsiang Chen and Wei-Tzer Huang, " Evaluation of the Variations of Short-Circuit Capacities Along a Feeder Due toDistribution Network Upgrading," Submitted for IEE Proceedings Generation, Transmission & Distribution.
二、會議論文
1. Tsai-Hsiang Chen and Wei-Tzer Huang, " Evaluation of the Variations of Short-Circuit Capacities Along a Feeder Due toDistribution Network Upgrading," 2005 IEEE PES General Meeting, 12-16 June 2005, San Franciso, California, USA.
2. Wei-Tzer Huang, Tsai-Hsiang Chen, Guan-Chih Pu, Yen-Feng Hsu and Tzong-Yih Guo, " Assessment of Upgrading Existing Primary Feeders from Radial to Normally Closed Loop Arrangement,"
Proceedings of IEEE/PES Transmission and Distribution Conference and Exhibition 2002: Asia Pacific, 6-10 October 2002, Yokohama, Japan, pp. 2123-2128.
3. Tsai-Hsiang Chen and Wei-Tzer Huang, " Analysis of System Imbalance due to Removal of a Failed Capacitor Unit in an Ungrounded Y-connected Capacitor Bank with One Series Group per Phase," Proceedings of the 35th Universities’ Power Engineering Conference (UPEC 2000), 6-8 September 2000, Belfast, Northern Ireland, UK.
4. Tsai-Hsiang Chen, Wei-Tzer Huang and Jeng-Tyan Cherng, "Analysis
of reversed power flow in an open wye-open delta transformer bank,"
Proceedings of the IASTED International Conference on Power and Energy Systems (PES’99), 8-10 November 1999, Las Vegas, Nevada, USA, pp. 285-289.
5. Wei-Tzer Huang and Tsai-Hsiang Chen, " Study on Loss Reduction on Distribution Systems by Upgrading Voltage-Drop-Limited Feeders form Open-Loop to a Normally Closed-Loop Arrangement,"
Proceedings of the 25th Symposium on Electrical Power Engineering, December 2004, Tainan, Taiwan, pp. 1061-1065.
6. Zhen-Kai Lin, Tsai-Hsiang Chen and Wei-Tzer Huang, " Study on the Secondary Distribution System Configurations," Proceedings of the 25th Symposium on Electrical Power Engineering, December 2004, Tainan, Taiwan, pp. 313-317.
7. Wei-Tzer Huang and Tsai-Hsiang Chen, " Study on Line Loss Reduction by Upgrading the Primary Feeder form Radial to Normally Closed-Loop Arrangement," 九十三年節約能源論文發表會, Taipei, Taiwan, May, 2004, pp. 153-164.
8. Tsai-Hsiang Chen, Yi-Jun Huang and Wei-Tzer Huang, " Study on the Integration of Substation Bus Schemes and Primary Distribution Feeder Arrangements," Proceedings of the 24th Symposium on Electrical Power Engineering, December 2003, Tainan, Taiwan, pp.
822-826.
9. Tsai-Hsiang Chen and Wei-Tzer Huang, " Study on the Nature and Operation Schemes of Typical Two-Substation Closed Rings Fed by the Same Transformer," Proceedings of the 24th Symposium on Electrical Power Engineering, December 2003, Tainan, Taiwan, pp.
1269-1273.
10. Wei-Tzer Huang, Tsai-Hsiang Chen, Guan-Chih Pu and Yen-Feng Hsu, "The Impacts and Required Supporting Measures of Upgrading Primary Feeders from Open-Loop to Normally Closed-Loop Arrangement," Proceedings of the 23rd Symposium on Electrical Power Engineering, December 2002, Taoyuan, Taiwan, pp. 1042-1045.
11. Tsai-Hsiang Chen, Jyh-Cherng Gu, Wei-Tzer Huang, Heng-Kuan
Feng Hsu, "Analysis of Characteristics of Normally Closed Loop Primary Feeders Fed by Distinct Transformers in a Substation,"
Proceedings of the 23rd Symposium on Electrical Power Engineering, December 2002, Taoyuan, Taiwan, pp. 1046-1050.
12. Jyh-Cherng Gu, Tsai-Hsiang Chen, Kun-Yuan Shen, Wei-Tzer Huang, Tsung-Ling Chuang, Heng-Kuan Chao, Tzong-Yih Guo, Guan-Chih Pu, Yen-Feng Hsu, "Protection Coordination Analysis of Closed-Loop Distribution System," Proceedings of the 23rd Symposium on Electrical Power Engineering, December 2002, Taoyuan, Taiwan, pp.
1026-1030.
13. Wei-Tzer Huang, Tsai-Hsiang Chen, Jyh-Cherng Gu, Heng-Kuan Chao, Guan-Chih Pu, Yen-Feng Hsu and Tzong-Yih Guo, "Analysis of Impacts of Dispersed Generation System on the Normally Closed Rings in a Primary Distribution Network," Proceedings of the 22nd Symposium on Electrical Power Engineering, November 2001, Kaoshiung, Taiwan, pp. 859-863.
14. Wei-Tzer Huang, Tsai-Hsiang Chen, Jyh-Cherng Gu, Heng-Kuan Chao, Guan-Chih Pu, Yen-Feng Hsu and Tzong-Yih Guo, " Analysis of the Operating Characteristics of Normally Closed Rings Fed by the same Main Transformer," Proceedings of the 22nd Symposium on Electrical Power Engineering, November 2001, Kaoshiung, Taiwan, pp. 869-872.
15. Wei-Tzer Huang, Tsai-Hsiang Chen, Jyh-Cherng Gu, Chin-Shun Lin, Tzong-Yih Guo, Guan-Chih Pu and Yen-Feng Hsu, " Feasibility Study of Shifting Existing Radial Primary Distribution Networks to Normally Closed-loop Arrangement, " Proceedings of the 21st Symposium on Electrical Power Engineering, 18-19 November 2000, Taipei, Taiwan, pp. 174-178.
16. Tsai-Hsiang Chen and Wei-Tzer Huang, "Evaluation of the
16. Tsai-Hsiang Chen and Wei-Tzer Huang, "Evaluation of the