Counterpropagation fuzzy-neural network for city

flood control system

Fi-John Chang

a,

*

, Kai-Yao Chang

a

, Li-Chiu Chang

b

a

Department of Bioenvironmental Systems Engineering, National Taiwan University, No. 1, Sec. 4. Roosevelt Road, Taipei 106, Taiwan, ROC

b

Department of Water Resources and Environmental Engineering, Tamkang University, Taiwan, ROC

Received 28 September 2007; received in revised form 7 May 2008; accepted 10 May 2008

KEYWORDS Fuzzy-neural network; Rule-base control; Artificial intelligence; Flood; Pumping station operation

Summary The counterpropagation fuzzy-neural network (CFNN) can effectively solve

highly non-linear control problems and robustly tune the complicated conversion of human intelligence to logical operating system. We propose the CFNN for extracting flood control knowledge in the form of fuzzy if–then rules to simulate a human-like operating strategy in a city flood control system through storm events. The Yu-Cheng pumping sta-tion, Taipei City, is used as a case study, where storm and operating records are used to train and verify the model’s performance. Historical records contain information of rain-fall amounts, inner water levels, and pump and gate operating records in torrential rain events. Input information can be classified according to its similarity and mapped into the hidden layer to form precedent if–then rules, while the output layer gradually adjusts the linked weights to obtain the optimal operating result. A model with increasing histor-ical data can automathistor-ically increase rules and thus enhance its predicting ability. The results indicate the network has a simple basic structure with efficient learning ability to construct a human-like operating strategy and has the potential ability to automatically operating the flood control system.

ª 2008 Elsevier B.V. All rights reserved.

Introduction

Due to urbanization and climate change, existing drainage systems are facing a great challenge. It is imperative to con-struct an effective and efficient flood control system and

drainage mechanism. Taiwan is located in the north Pacific Ocean subtropical jet stream monsoon district. Taipei City, the capital of Taiwan, is located in the Taipei Basin in north-ern Taiwan and is surrounded by the Danshui River, with a narrow estuary that makes it difficult for water in the city to be effectively discharged. A high intensity rainfall during a storm or typhoon could easily cause flooding. The Nari ty-phoon struck North Taiwan with stunning rainfall on Sep-tember 17th 2001, where the accumulated precipitation in

0022-1694/$ - see front matterª 2008 Elsevier B.V. All rights reserved. doi:10.1016/j.jhydrol.2008.05.013

* Corresponding author. Tel.: +886 2 23639461; fax: +886 2 23635854.

E-mail address:changfj@ntu.edu.tw(F.-J. Chang).

a v a i l a b l e a t w w w . s c i e n c e d i r e c t . c o m

(2)

Taipei City plain area was 500 mm/day and in mountain area was over 1000 mm; the highest precipitation reached 148.5 mm/h. It caused 27 deaths, with 3 missing, and 16 in-jured. Taipei mass rapid transportation (MRT) system was flooded (all underground lines were just like sewers, includ-ing 16 stations, the heavy-capacity system operation control center, and the administration building), 4151 building basements were inundated, the city functions were severely damaged, and the economic effects were countless.

In these circumstances, the flood control strategy for Taipei City was to build an embankment along the river side to prevent a two-hundred year river flood from entering the city and to set up pumping stations at the main draining lines to pump out the inner city water. Undoubtedly, the pumping stations play an important role in the Taipei flood controlling system. A pumping station that fails to perform its designed draining function can cause flood disasters and result in resentment from the residents and their loss of property. Related operating guidelines were built a long time ago, where the hydrological data were lacking and with high uncertainty. The pumping stations have been operated under actual circumstances and require experienced opera-tors to adjust the switching (turning on and off) of the pump machines according to the actual precipitation and the changes of fore bay levels. To overcome the disadvantages of traditional operating guidelines, which are difficult to follow due to ambiguous forms and the need for skilful oper-ators, we propose a rule-based fuzzy-neural network to effectively operate the pumping sets.

The last decade has witnessed growing interest in the use of fuzzy logic and neural networks in the field of hydrological modeling (Chang et al., 2001; Xiong et al., 2001; Lobbrecht

and Solomatine, 2002; Bhattacharya et al., 2003; Jingyi and Hall, 2004; Nayak et al., 2004; Lobbrecht et al, 2005; Chang and Chang, 2006; Lohani et al., 2006; Tutmez et al., 2006; Bae et al., 2007; Chaves and Kojiri, 2007; Hsu and Wei, 2007). The neural networks and fuzzy systems are either used as competing alternatives to the traditional hydrological models or work in synergy with the traditional models to pro-duce better modeling solutions. Based on the realization that a fuzzy logic is a nonlinear mapping from an input space to an output space and a neural network can be adapted to data, a fusion of fuzzy logic and neural network model could solve the highly non-linear control problem robustly and effectively (Chang and Chang, 2001). To bridge the gap between aca-demic research and actual operation, we propose an artificial intelligent technology that fuses the ANN and fuzzy logic fea-tures for extracting the flood control knowledge for the Tai-pei city flood control system. The major advantage of this fuzzy-neural network is that it can tune the complicated con-version of human intelligence to a fuzzy logical operating sys-tem. The network is constructed by adopting the historical hydrological data of storm events, and the historical operat-ing records of the gravity gates and pump sets, with the judg-ing method of human bejudg-ings. The detailed methodology and the results are provided in the following sections.

Theoretical background

Artificial Intelligence is a state-of-the-art technology that resembles the human thinking process in decision making

and strategy learning, and it has been well recognized for its outstanding ability in controlling complex systems, such as reservoir operating systems (Chang et al., 2005; Chaves

and Chang, 2008). The ANN and fuzzy logic are two effective tools in developing an intelligent control engineering model. Fuzzy logic is controlled by a human operator to deal with reasoning that is approximate rather than precisely deduced from classical predicate logic. In the absence of a system mathematical model, fuzzy logic is analogous to human behaviour to establish the relationships between the inputs and the outputs, based on approximate reasoning bound by a minimum set of rules. An artificial neural network (ANN) is an interconnected group of neurons that changes its struc-ture and connected weights based on external or internal information that flows through the network. ANN can be used to model complex relationships between inputs and outputs. Neural networks are trainable systems that can ‘‘learn’’ to solve complex problems from a set of exemplars and generalize the ‘‘acquired knowledge’’ to solve unfore-seen problems as in environmental prediction. Today ANNs are being applied to an increasing number of real-world problems of considerable complexity.

This study is based on a rule base, fuzzy control, and counterpropagation neural network to establish the proper relationship between hydrological variations and pump sta-tion operasta-tion. Fuzzy-Neural Network, which was first intro-duced byNie and Linkens (1994), Nie and Linkens (1995), consists of two parts, where the first part is clustering the input data and the second part is a look-up table for map-ping input and output patterns. The architecture of the counterpropagation fuzzy-neural network (CFNN) consists of three layers: input, hidden (Kohonen), and output (Gross-berg) layers (Fig. 1). The input layer with n nodes stores the input values, the Kohonen layer with p nodes clusters the in-put values with a similarity measurement, and the Gross-berg layer with m nodes calculates the outputs by summing the weighted Kohonen layer outputs.

The CFNN has a hybrid learning scheme, unsupervised and supervised, to learn human beings’ experiences and operating rules. Unsupervised learning is used during the first stage for clustering the input vectors to separate dis-tinct sets according to the similarity of nodes and formed precedent if–then rules. During the second stage of learn-ing, the weight vectors between the Kohonen and Grossberg layers are adjusted by supervised learning to reduce the er-rors. A model with increasing historical data can automati-cally increase rules and thus enhance its predicting ability. The CFNN has efficient clustering effects from human-like ability of extracting rules, and good simulating results from non-linear functions. It is a good pattern recognition engine and robust classifier, with the ability to generalize in making decisions about imprecise input data. Details of the CFNN procedure can be found inChang et al. (2001)and are sum-marized as follows.

Network learning algorithms

A network input vector X¼ ðx1; . . . ; xi; . . . ; xnÞ would be transformed to an output vector Y¼ ðy1; . . . ; ymÞ through a logical judgment, which is called a set of rule. The connec-tion of the input layer to the nodes in the Kohonen layer is w, which is an ‘IF’ statement of rule-base control, and the

(3)

next connection to the nodes in the Grossberg layer is p, which is the ‘THEN’ statement of rule-base control. Thus, the two-step connections could be viewed as a whole ‘IF X is w, THEN Y is p0 statement. The weights in the Kohonen and Grossberg layers are trained independently and shown as follows.

Kohonen layer

In the Kohonen layer, every node represents a rule unit. The number of nodes in this layer is the same as the number of rules. We have to decide the number of rules and the center of each rule unit wj. First, the learning arithmetic computes the distance between the input X(t) with the center wjof the existing N nodes and decides the winning node (the shortest distance). Then, the weights of winner node will be adjusted in the following condition.

If the closest distance between wjand input X(t) is smal-ler than D (D is the interval in a triangular function), then the wjis updated by the following equation:

wnew j ¼ w old j þ a XðtÞ  w old j h i ð1Þ

where X(t) is the tth input vector, and a is the learning rate, which is between 0 and 1.

If the distance between wjand X(t) is larger than D, a new rule wnew

j ¼ XðtÞ will be created, and the existing N rules will become (N + 1) rules (Kohonen, 1998). In the arith-metic, when the D value decreases, the number of units in the rule base and the accuracy (especially in train set) will increase and the complexity of the network will also in-crease. The decision has to be made between accuracy

and model complexity. Generally, D is selected by trial-and-error method.

Grossberg layer

The weights (p) in this layer is updated according to the Grossberg learning rule, as follows:

pnew j ¼ p old j þ b YðtÞ  p old j h i ð2Þ where Y(t) is the output vector, and b is the learning rate, which is between 0 and 1. Only the weights connecting the winning neuron in the Kohonen layer will be updated.

Network predicting

The network-predicting algorithm consists of two steps, pattern matching and weighted average determining, and is coupled with the concept of fuzzy control (Nie, 1997). Pattern matching takes the Gaussian function as member-ship function (sj2 ½0; 1) for calculating the similarity of the input value and the jth rule unit. If the central vector distance between input and the jth rule is larger than D, then sj= 0, which means the influence weight of the jth rule to the input is 0.

The weighted average is used to calculate the fuzzy out-put ^YðtÞ as follows.

Y^ðtÞ ¼ PN j¼1sjpj PN j¼1sj ð3Þ

where ^YðtÞ denotes the fuzzy output of X(t), pjis the output weight.

(4)

After the network is trained, all of the weights are kept fixed. Only input data is needed for the model to operate for predicting.

In practice, the input X(t) might not be clustered into any rule because the distances of each rule’s center are all lar-ger than the interval D. The reason could be a lack of histor-ical data for training network, or the value of D is too small, which causes the data not to be grouped properly and effec-tively. One solution is trying to find a suitable D that makes the model have proper clustering abilities. The other way is to enlarge the existing width of D by a geometric ratio that increases the opportunity of clustering the rule units (Chang

et al., 2001). In this study, the latter solution is imple-mented into the proposed CFNN for modelling the pumping station operation.

Case study

The city of Taipei and its suburbs, bounded by mountains, was the site of a great lake in prehistoric times; it slowly developed its present features as alluvial deposits filled the lake. Topographically, the Danshui River and its tribu-taries surround the Taipei basin and its outlet, the Guandu pass, near estuary is narrow, so that running water in the city cannot be discharged by gravity when the river level reaches a certain height as storms strike Taipei in a mon-soon. The flood control strategy has built an embankment along the river side and set pumping stations at main drain lines to discharge the rainfall in the city area.

Yu-Cheng pumping station

The Yu-Cheng pumping station is located in the east of Taipei City. The total measure of the watershed is 1644.93 ha.Fig. 2

shows its geographic location andFig. 3shows its watershed. The station was completed in 1987 to pump inner water to the Keelung River. It contains seven massive pumps whose pump-ing capacity is 26.3 m3/s each and that makes the total capac-ity to 184.1 m3/s. In the 1980s the station was said to be the most advanced and largest in Asia. Its facilities are shown in

Fig. 4. The start-out level is EL. 2.4 m. Design outer-level is the 10-year flood level, EL. 7.62 m, of Keelung River. The cur-rent capacity can only drain away the rainfall runoff of a rain-fall intensity of 42.5 mm/h. According to the watershed of main drainage lines, the system of the Yu-Cheng pumping sta-tion could be roughly divided as Songlong Road line system, Zhongpo North Road line system and Nangang Road line sys-tem, 3 sub-drainage systems. There is a level monitoring booth, Yu-Cheng 10 (YC10) in the watershed of Yu-Cheng pumping station.

The gravity gates of Yu-Cheng pumping station usually re-main open to drain out the inner water to the Keelung River. When the level of the river tends to rise up to the warning level of the fore bay of the pumping station, the pumps turn and warm up. The pumps start pumping as soon as the water level is up to the start-out level and the gravity gates are closed at the same time. The 7 pump sets are operated independently and sequentially (seeFig. 5).

Pumping station operation

Operation target

Mechanical power is used to drain away the inner water as the outer level is higher than the inner level and the running water cannot be discharged by gravity. The pumped water will lower the level of the drainage system before the flood peak to in-crease the storage capacity of the system and to speed up the discharging for decreasing the flooding probability.

Current operation mechanisms (Taipei City Government,

1989, 1998; Pumping Station Operation Manual et al., 1984)

There are several standards for guiding the pumps to turn on or off. The minimum water level is the lowest water level for pumps functioning; the pumps may be damaged if the water is lower than this level. The pumps are warmed up and stand-by as the water level reaches the warning water level. The start-out water level is the pumps starting to function at this water level. Generally, the pumps start sequentially, which means when a running pump cannot

(5)

control the water level under the start-out level, another pump will start working. On the contrary, the pumps are turned off, respectively, as the water level is falling. The maximum water level is the maximum defensible water le-vel in the pumping station.

As the river level rises to the bottom of the gravity gates, the gates are closed immediately to prevent the flow in. Since the gravity gates are closed, runoff in the city cannot be discharged into the river, causing the level of fore bay to rise. If the level were to reach the warning level, the pump sets would be warming up and would start to pump water when the level reached the start-out level. The gravity gates should remain closed while the pump sets keep drain-ing water. When the river level is lower than the fore bay

level, the gravity gates are opened immediately to speed up the drainage. In addition, if the level of fore bay is still higher than the start-out level, the pump sets keep running.

Pumping operation factors analyses

The operating decision mainly depends on the variation of fore bay level caused by rainfall runoff. Their relationship, however, is very complex. Therefore, the rainfall situation, the variation of fore bay level, the rainfall in the future, and fore bay level prediction are all important factors that influ-ence the decision. As mentioned above, the operation of gravity gates is considerably related to the operation of pump sets, the changes of inner level, and the comparison of inner and outer levels.

Figure 3 Watershed of the Yu-Cheng pumping station.

sump Keelung River

pressure water channel levee

maintenance road

gate Flag gate

flow Pumping station

bridge P1 P2 P3 P4 P5 P6 P7 sump Keelung River

pressure water channel levee

maintenance road

gate Flag gate

flow Pumping station

bridge P1 P2 P3 P4 P5 P6 P7

(6)

To sum up, the purpose of the pumping station operation is to efficiently lower the fore bay level, keep it under the maximum tolerable level to avoid flooding but not under its minimum tolerable limits to avoid damaging to pump sets. And at the same time, the pump sets should not be turned on and off too frequently during the period of oper-ation to keep the pumps from being damaged.

Network model and parameter settings

To build up an intelligent control system, one first needs to acquire knowledge of the system. The knowledge could be rules or guidelines, which explicitly show the way that a sys-tem responds to an input. Unfortunately, in this case no strict rules exist to guide the way. One alternative way is

to collect the historical operating records (i.e., the input– output patterns), and then try to analyze the input–output relation. If a solid relation can be found, it can be used for future operation when we face a similar input situation. The proposed intelligent flood control system learns from the decisions made by the experienced operators, which are considered to be the optimal decisions in this study.

We collected the precipitation, fore bay level, opening and closing of the gravity gates, and historical records of pump set operation from seven storm events. The precipita-tion variaprecipita-tion was treated by accumulated precipitaprecipita-tion of different duration (such as 5-min accumulated precipita-tion, 10-min accumulated precipitation). The fore bay level variation was treated by the lifts of different duration (the difference between current and 5 min before). Since it

bed flag gate

Keelung River levee

maintenance road

pressure water pipe pump engine gearbox sump bed flag gate Keelung levee maintenance road

pressure water pipe pump

engine gearbox

sump

Figure 5 Section of pumping station facilities.

(7)

would cause damage to the pump sets if the machines were turned on and off too frequently, the maximum number of such operations is normally set as 12 times in an hour. The precipitation and water level differences were normalized into the interval between 0 and 1 before they were put in the network.

The input layer consists of the accumulated precipitation of current and previous time, I(t) and I(ti); the differences of fore bay level at two time, DH(t) and DH(ti); the num-ber of closing gates at current time, G(t); and the numnum-ber of active pumps at current time, P(t). And the output layer is the number of active pumps at next 5 min, P(t + i) in this case i = 5. Those inputs and output are shown as Fig. 6. The precipitation caused by a typhoon or storms during the wet season can be huge (e.g., 100 mm/h is not unusual) while the capacity of the fore bay is relatively limited; con-sequently, the fore bay water level would change rapidly. The model can be running every minute to predict the num-ber of running pumps in the next 5-min for the operating center as the latest information, so the possible variations can be estimated ahead of time and the operators will have more time to make a suitable decision.

To construct a suitable neural network, the data sets are divided into three independent sub-sets, namely training, validation, and testing subsets. The training sets are used to adjust the connected weights of the constructed net-works, the validation sets are implemented to select a suit-able network from the above-trained networks, and the reliability of the selected network is then tested by testing sets. In this study, we arbitrarily divided event datasets into training, validation and testing subsets. The data adopted for training are the data of 5 storm events (total 3565 data sets), and thus the rule base is built. Then the data of one event in 2007 (515 data) are used for validation. After that, the data of Haitang Typhoon (1168 data) are used for test-ing. Table 1 shows the chosen data for modelling the networks.

There are two learning rates (a and b) and one matching parameter (D), which need be predetermined before the network is trained. The mean average error (MAE) is taken as the criterion to judge the error between the modelling predicting values and the actual operating values. A smaller MAE represents higher accuracy. The formulations of MAE are shown as below:

MAE¼ PN

t¼1jPestðtÞ  PobsðtÞj

N ð4Þ

where N is the number of times, and Pestand Pobsare the number of active pumps by model estimation and observed (human operated) record.

Observed rain, water level and the pumping station operation information

The real-time water level monitoring of the sewerage sys-tems, which is very helpful for flood alarming syssys-tems, has been operated by the hydraulic engineering office (HEO) of Taipei City Government in last few years. The data used in this study were built since 2002 near the fore bay of Yu-Cheng pumping station. The seven recorded typhoons and/ or storm events are shown inTable 1. The precipitation data were obtained from the San Xin Elementary School station, which is located in the watershed of Yu-Cheng Pumping Sta-tion (shown inFig. 3) also operated by the HEO.

Results and analyses

The initial settings for training the model are a = 0.5 and b = 0.5, the limit of fault tolerance is 0.0001. The initial

va-Table 1 Chosen data of typhoons and floods events in Yu-Cheng pumping station

Stage Events Starting time Ending time Duration

(min) Accumulation of precipitation (mm) Maximus precipitation (mm) 5 min 10 min 1 h

Training Storm Event 2002/12/21 02:34 2002/12/21 10:05 451 37.0 6.5 13.0 35.0

Storm Event 2002/12/25 17:59 2002/12/25 20:41 162 20.0 1.5 2.0 7.0

Storm Event 2002/12/26 05:27 2002/12/26 11:16 349 45.0 8.5 13.5 37.0

Haima Typhoon 2004/9/10 16:39 2004/9/11 13:51 1282 445.5 11.0 18.0 74.0

Storm Event 2006/9/10 23:54 2006/9/11 21:55 1321 58.0 2.5 5.0 15.5

Validation Storm Event 2007/6/9 14:00 2007/6/9 17:35 515 24.0 3.0 4.0 8.5

Testing Haitang Typhoon 2005/7/17 23:21 2005/7/18 18:49 1168 170.0 5.5 6.5 32.5

Table 2 Summary of the performance of the different D at

different stages

D Rules MAE

Training Validation Testing

0.04 465 0.151 0.404 0.433 0.06 229 0.189 0.548 0.351 0.08 158 0.252 0.552 0.434 0.1 107 0.289 0.452 0.384 0.12 84 0.254 0.206 0.081 0.14 66 0.288 0.194 0.104 0.16 49 0.458 0.368 0.312 0.18 41 0.591 0.450 0.294 0.2 35 0.217 0.122 0.049 0.22 32 0.355 0.142 0.223 0.24 21 0.395 0.152 0.082 0.26 21 0.255 0.138 0.147 0.28 15 0.393 0.136 0.050 0.3 13 0.420 0.142 0.095 0.4 6 0.757 0.792 0.409 0.5 4 1.102 0.804 0.893

(8)

lue of D is set as 0.04 and is increased 0.02 in each con-structed network until D reaches 0.5. Consequently, 24 net-works were trained and evaluated. The influence of the D value in the training phase of network constructing and in the validation and test phases of network performance is shown in Table 2 andFig. 7. As expected, we found that in training stage a smaller D will provide smaller predicting error, while in validation and testing stages, after a certain value of the D, the predicting results cannot be improved further and the accuracy is decreased instead. For instance, when D is 0.04, there are 465 rules units and the value of

MSE in training stage is quite ideal. When D is 0.5, only 4 rules units are built; however, larger error was obtained. It is found when D is 0.2, 35 rules are built and the con-structing network has among the best for which the values of MAE are equal to 0.217 in training, 0.122 in validation, and 0.049 in testing, respectively. Consequently, we suggest that the influence of the D value is set as 0.2 and the net-work has 6 inputs, 35 hidden nodes, and one output. With small error and not complex structure, the results suggest that the constructed network is suitable and do not have over fitting problem. It is noted that the value of MAE in

0 50 100 150 200 250 300 350 400 450 500 0 0.1 0.2 0.3 0.4 0.5 0.0 0.3 0.6 0.9 1.2 1.5 Ru le s MA E Rules Train Validation Test

Figure 7 Influence of D value on network modelling.

0 1 2 3 4 5 6 7 Rain(mm/min) 0 1 2 3 4 5 6 7 8 9 10

Number of closed Gates

gates colsed Rain -1 1 3 5 7 9 11 13 0 200 400 600 800 1000 1200 Time (min) Water level (m) 0 2 4 6 8 10 12 Number of runnin g p um p s

Real pumping operation model pumping operation Water Level

(9)

testing case is much smaller than the value of MAE in train-ing case (also in validation case). This is mainly because the output (the number of active pump) is relatively stable in the validation and testing cases than in the training case (shown inFigs. 8–10).

Fig. 8shows a comparison between the model output and the actual operating records in a training case (Haima

Ty-phoon). It appears the model outputs nicely correspond with the actual operating records.Table 3gives the analyses of comparing between the numbers of actual opened pumps with the model estimated. In training phase, the accuracy of model estimation for the opened pumping sets less than 4 pumps can reach 91.5% to 100%, and the errors are all un-der 1 set. When the number of pump sets is equal or greater

0 1 2 3 4 5 6 7 Rain (mm/min) 0 1 2 3 4 5 6 7 8 9 10 Number of closed g ates gates colsed Rain -3 -1 1 3 5 7 9 11 0 50 100 150 200 250 300 350 400 450 500 Time (min) Water level (m) 0 2 4 6 8 10 12 Number of runnin g p um p s

Real pumping operation model pumping operation Water Level

Figure 9 Comparison of model operation and real operation in validation stage (Storm event).

0 1 2 3 4 5 6 7 Rain (mm/min) 0 1 2 3 4 5 6 7 8 9 10 Number of closed g ates gates colsed Rain -3 -1 1 3 5 7 9 11 0 100 200 300 400 500 600 700 800 900 1000 1100 Time (min) Water level (m) 0 2 4 6 8 10 12

Number of running pumps

Real pumping operation model pumping operation Water Level

(10)

than 4 sets, the accuracy of the estimation becomes lower, from 64% to 80%.

Figs. 9 and 10 present the number of opened pumps through a typhoon event by the model operation and the real operating record in the validation and testing cases. As shown in Table 3, the accuracies are all higher than 91% in the validation and testing phases, and the errors are all within 1 pump set. Apparently, the built model could get good results in the validation and testing phases. How-ever, there are no recorded operation events that contain 6 or 7 pumps in validation and testing stages. How well built the model is for the prediction of a high number of active pumps, unfortunately, could not be verified. After carefully examining the results, we found the model’s accuracy for 4 and 5 pumps in training phase could only reach 67% to 80%, while the accuracy in validation and testing phases could reach nearly 100%. Therefore, it is believed that the built network can well estimate with considerable accuracy.

Conclusions

Taipei City is a basin surrounded by the Danshui River, while the narrow estuary makes it difficult for water in the city to be effectively discharged which leads to flooding. The flood control system is highly dependent on operating pumping stations. Thus, continuous consideration must be given to improving the operation efficiency of existing or newly developed pumping stations. Developing optimal operating rules and linking those with the design system shows much promise. This study presents a human-like operation strat-egy for the pumping station by using a novel neural-fuzzy

network. The proposed CFNN fuses the ANN and fuzzy logic features to tune the complicated conversion of human intel-ligence to real operating systems. The combination of neu-ral networks and fuzzy logic concepts allows the advantages of each approach to be utilized while, at the same time, overcoming their respective disadvantages. The advantages include simple basic structure, efficient learning ability, ease of expandability, and humanistic clustering effects. The CFNN is a good pattern recognition engine and robust classifier, with the ability to generalize in making decisions about imprecise input data.

The network is implemented in the Yu-Chen pumping sta-tion, Taipei. The station contains seven massive pumps. The network was built and verified based on historical typhoon (or storm) events data sets, which include cumulative pre-cipitation, fore bay level, the gravity gates, and operating record of pump sets. A total of 5248 data sets are divided into three independent sets, namely training, verification, and testing. The results demonstrate that the developed intelligent network can provide human-like performance in determining the number of active pumps in the pumping station. The similarity of the active pumps between the net-work’s estimation and historical record, in terms of accu-racy, is higher than 91% in the validation and testing phases, and the estimating errors are all within 1 pump in almost all the cases.

The CFNN has built 35 fuzzy rules to estimate the active pumps based on the related hydrological conditions. We found the accuracy of the forecasting is sensitive to the numbers of rule units. If the number of the rules is in-creased, the error (in terms of MSE and MAE) will be de-creased in the training phase but inde-creased after a certain

Table 3 Comparison of Model Operation and Real Operation

Pumps On (min) Error (Prediction–Observation) Accuracy

7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 % Train 0 1395 0 0 0 0 0 0 0 1384 11 0 0 0 0 0 0 99.21 1 467 0 0 0 0 0 0 0 467 0 0 0 0 0 0 0 100.00 2 380 0 0 0 0 0 0 4 348 28 0 0 0 0 0 0 91.58 3 391 0 0 0 0 0 0 0 382 9 0 0 0 0 0 0 97.70 4 102 0 0 0 0 0 0 0 68 27 7 0 0 0 0 0 66.67 5 116 0 0 0 0 0 0 0 93 23 0 0 0 0 0 0 80.17 6 655 0 0 0 0 0 4 233 418 0 0 0 0 0 0 0 63.82 7 59 0 0 0 0 0 6 14 39 0 0 0 0 0 0 0 66.10 Validation 0 107 0 0 0 0 0 0 0 107 0 0 0 0 0 0 0 100.00 1 189 0 0 0 0 0 0 0 178 11 0 0 0 0 0 0 94.18 2 61 0 0 0 0 0 0 0 56 5 0 0 0 0 0 0 91.80 3 51 0 0 0 0 0 0 0 51 0 0 0 0 0 0 0 100.00 4 92 0 0 0 0 0 0 0 92 0 0 0 0 0 0 0 100.00 5 15 0 0 0 0 0 0 0 15 0 0 0 0 0 0 0 100.00 Test 0 245 0 0 0 0 0 0 0 245 0 0 0 0 0 0 0 100.00 1 292 0 0 0 0 0 0 5 282 5 0 0 0 0 0 0 96.58 2 198 0 0 0 0 0 0 0 193 5 0 0 0 0 0 0 97.47 3 74 0 0 0 0 0 0 0 73 1 0 0 0 0 0 0 98.65 4 359 0 0 0 0 0 0 0 356 3 0 0 0 0 0 0 99.16

(11)

number of rules in the validation and testing phases. The re-sults suggest that 35 rules seem adequate in this study case and more rules could cause over-fitting and diminishing model performance in the testing phase. The study gives an insight into the applicability of fuzzy control to systems with rapidly changing dynamics. It becomes clear that a self-organizing neural-fuzzy network can be efficient to construct a limited number of IF–THEN rules which are likely to respond successfully to the possible input patterns. This gives the CFNN model powerful and accurate forecast-ing ability.

Acknowledgments

This study was partially supported by the National Science Council (NSC), Taiwan ROC (NSC 95-2313-b-002-031) and by the Taipei City Government for providing the valuable data sets.

References

Bae, D.H., Jeong, D.M., Kim, G., 2007. Monthly dam inflow forecasts using weather forecasting information and neuro-fuzzy technique. Hydrological Science Journal 52 (1), 99–113. Bhattacharya, B., Lobbrecht, A.H., Solomatine, D.P., 2003. Neural

networks and reinforcement learning in control of water systems. Journal of Water Resources Planning and Management 129 (6), 458–465.

Chaves, P., Chang, F.J., 2008. Intelligent Reservoir Operation System Based on Evolving Artificial Neural Networks. Advances in Water Resources 31, 926–936.

Chaves, P., Kojiri, T., 2007. Deriving reservoir operational strate-gies considering water quantity and quality objectives by stochastic fuzzy neural networks. Advances in Water Resources 30 (5), 1329–1341.

Chang, F.J., Chang, Y.T., 2006. Adaptive neuro-fuzzy inference system for prediction of water level in reservoir. Advances in Water Resources 29, 1–10.

Chang, F.-J., Hu, H.-F., Chen, Y.-C., 2001. Counterpropagation fuzzy-neural network for streamflow reconstructing. Hydrolog-ical Processes 15 (2), 219–232.

Chang, L.C., Chang, F.J., 2001. Intelligent control for modeling of real-time reservoir operation. Hydrological Processes 15 (9), 1621–1634.

Chang, Y.T., Chang, L.C., Chang, F.J., 2005. Intelligent control for modelling of real-time reservoir operation, part II: artificial neural with operating rule curves. Hydrological Processes 19, 1431–1444.

Hsu, N.S., Wei, C.C., 2007. A multipurpose reservoir real-time operation model for flood control during typhoon invasion. Journal of Hydrology 336 (3–4), 282–293.

Jingyi, Z., Hall, M.J., 2004. Regional flood frequency analysis for the Gan-Ming River basin in China. Journal of Hydrology 296, 98– 117.

Kohonen, T., 1998. Self-organization and associative memory, second ed. Springer-Verlag, Berlin, Germany.

Lobbrecht, A.H., Solomatine, D.P., 2002. Machine learning in real-time control of water systems. Urban Water 4, 283– 289.

Lobbrecht, A.H., Yonas, B.D., Solomatine, D.P., 2005. Neural networks and Fuzzy systems in model based control of the Overwaard Polder. Journal of Water Resources Planning and Management 131, 135–145.

Lohani, A.K., Goel, N.K., Bhatia, K.K.S., 2006. Takagi–Sugeno fuzzy inference system for modeling stage–discharge relationship. Journal of Hydrology 331, 146–160.

Manual of Taipei City Raining Drainage Plan, New Construction Office of Public Works Department, Taipei City Government, 1989 (in Chinese).

Nayak, P.C., Sudheer, K.P., Rangan, D.M., Ramasastri, K.S., 2004. A neuro-fuzzy computing technique for modeling hydrological time series. Journal of Hydrology 291 (1–2), 52–66.

Nie, J., 1997. Nonlinear time-series forecasting: a fuzzy-neural approachNeurocomputing, vol. 16. Elsevier, pp. 63–761. Nie, J., Linkens, D.A., 1994. Fast self-learning multivariable fuzzy

controllers constructed from a modified CPN network. Interna-tional Journal of Control 60 (3), 369–393.

Nie, J., Linkens, D.A., 1995. Fuzzy-Neural Control: Principles, Algorithms and Applications. Prentice-Hall, London.

Pumping Station Operating Manual, Maintenance Office of Public Works Department, Taipei City Government, 1984 (in Chinese). Taipei City Government, Handouts for Operating and Maintaining Training of Pumping Station Operators, Maintenance Office of Public Works Department, Taipei, 1998 (in Chinese).

Tutmez, B., Hatipoglu, Z., Kaymak, U., 2006. Modelling electrical conductivity of groundwater using an adaptive neuro-fuzzy inference system. Computers and Geosciences 32 (4), 421– 433.

Xiong, L., Shamseldin, A., O’Connor, K., 2001. A non-linear combination of the forecasts of rainfall-runoff models by the first-order Takagi–Sugeno fuzzy system. Journal of Hydrology 245, 196–217.

參考文獻

相關文件

例如 : http ( 網頁伺服器所用的協定 ) 定義了 client 如何向 server request 網頁及 server 如何 將網頁及其中的各種內容回傳給 client 。. 提供服務給 application layer

本次的作業 (netstat -na 部分 ) 即在觀看所有機 器上的 transport layer 連線. 本次的作業 (netstat -na 部分 ) 即在觀看所有機 器上的 transport layer

5/11 Network Address Translation and Virtual Private Network. 5/18 System configuration and

5/4 System configuration and log systems 5/11 Network Address Translation (NAT)
. and Virtual Private

Random Forest: Theory and Practice Neural Network Motivation.. Neural Network Hypothesis Neural Network Training Deep

Idea: condition the neural network on all previous words and tie the weights at each time step. Assumption: temporal

This study proposed the Minimum Risk Neural Network (MRNN), which is based on back-propagation network (BPN) and combined with the concept of maximization of classification margin

For Experimental Group 1 and Control Group 1, the learning environment was adaptive based on each student’s learning ability, and difficulty level of a new subject unit was