National Chiao Tung University
1001 TA HSUEH ROAD, HSINCHU, TAIWAN 30010
Phone: +886-3-5718083
www.sde.tw
facebook.com/twsde
twitter.com/NCTU_UNICODE
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-101
ST 2014/04/30 CD Submission
ST -
-
SHEET LIST 1
GE-101 Sheet List 1 2
GE-102 Sheet List 2 3
GE-103 Sheet List 3 4
GE-201 General Symbols 5
GE-211 General Abbreviations 6
GE-301 Urban Project Location 7
GE-310 Urban Proposal Explanation 1 8
GE-311 Urban Proposal Explanation 2 9
GE-320 Existing Building Drawings and Analysis 10
GE-330 Competition Dwelling 11
GE-401 Pavilion East Side Rendering 12
GE-402 Pavilion West Side Rendering 13
2. ARCHITECTURAL
AR-001 La Cité du Soleil® Plan 14
AR-002 Site Plan 15
AR-011 Solar Envelope 16
AR-014 Architecture Footprint 17
AR-017 Measurable Area 18
AR-021 Ground Level Plan 19
AR-022 Mezzanine Level Plan 20
AR-031 Roof Level Plan 21
AR-041 Reconfigurable Feature 1 22
AR-042 Reconfigurable Feature 2 23
AR-043 Reconfigurable Feature 3 24
AR-044 Reconfigurable Feature 4 25
AR-051 Site Entrance and Exit 26
AR-101 Site Elevation 27
AR-111 East Elevation 28
AR-112 North Elevation 29
AR-113 South Elevation 30
AR-114 West Elevation 31
AR-201 Longitudinal Section 1 32
AR-202 Longitudinal Section 2 33
AR-203 Longitudinal Section 3 34
AR-211 Transversal Section 1 35
AR-212 Transversal Section 2 36
AR-213 Transversal Section 3 37
AR-301 Window Schedule and Details 1 38
AR-302 Window Schedule and Details 2 39
AR-303 Window Schedule and Details 3 40
AR-304 Window Schedule and Details 4 41
AR-305 Window Schedule and Details 5 42
AR-306 Window Schedule and Details 6 43
AR-307 Window Schedule and Details 7 44
AR-308 Window Schedule and Details 8 45
AR-309 Window Schedule and Details 9 46
AR-311 Door Schedule and Details 1 47
AR-312 Door Schedule and Details 2 48
AR-321 Floor Construction Ground Level 49
AR-322 Floor Construction Mezzanine Level 50 AR-323 Floor Construction Details Ground Level 1 51 AR-324 Floor Construction Details Ground Level 2 52 AR-325 Floor Construction Details Ground Level 3 53 AR-326 Floor Construction Details Ground Level 4 54 AR-327 Floor Construction Details Ground Level 5 55 AR-328 Floor Construction Details Mezzanine Level 1 56 AR-329 Floor Construction Details Mezzanine Level 2 57 AR-330 Floor Construction Details Mezzanine Level 3 58 AR-331 Floor Construction Details Mezzanine Level 4 59 AR-332 Ceiling Construction Details Mezzanine Level 1 60 AR-333 Ceiling Construction Details Mezzanine Level 2 61 AR-334 Ceiling Construction Details Mezzanine Level 3 62
AR-336 Roof Construction Details 63
AR-363 Joints Details 3 68
AR-364 Joints Details 4 69
AR-371 Stair Details 1 70
AR-372 Stair Details 2 71
AR-401 Green Core Details 1 72
AR-402 Green Core Details 2 73
AR-403 Green Core Details 3 74
AR-404 Green Core Details 4 75
AR-411 Blue Wall Details 76
AR-421 Smart Skin Details 77
AR-431 Thermal Wall Details 1 78
AR-432 Thermal Wall Details 2 79
AR-433 Thermal Wall Details 3 80
AR-434 Thermal Wall Details 4 81
AR-435 Thermal Wall Details 5 82
AR-436 Thermal Wall Details 6 83
AR-437 Thermal Wall Details 7 84
AR-438 Thermal Wall Details 8 85
AR-439 Thermal Wall Details 9 86
AR-440 Thermal Wall Details 10 87
AR-441 Thermal Wall Details 11 88
AR-442 Thermal Wall Details 12 89
AR-443 Thermal Wall Details 13 90
3. BIOCLIMATIC ANALYSIS (BA)
BA-001 Taipei Climate Analysis 91
BA-002 Taipei Shading Analysis 92
BA-003 Taipei Wind Rose Analysis 93
BA-004 Versailles Climate Analysis 94
BA-005 Versailles Shading Analysis 95
BA-006 Versailles Wind Rose Analysis 96
BA-011 Bioclimatic Strategies 97
BA-012 Natural Ventilation 98
BA-013 Solar Chemny 99
BA-014 Earth/Vegetation cooling 100
BA-015 Evaporative Cooling 101
BA-016 Direct Solar Heating 102
BA-017 Bioclimatic Drawings Heating 103
BA-018 Thermal Wall in Versailles 104
BA-019 Thermal Wall in Taipei 105
BA-020 Heat Exchanger Preheated by Solar Hot Water 106
BA-021 Heat Pump 107
4. INTERIORS (IN)
IN-001 Ground Level Floor 108
IN-002 Mezzanine Level Floor 109
IN-101 Reflected Ceiling 110
IN-201 Interior Elevation 1 111
IN-202 Interior Elevation 2 112
IN-203 Interior Elevation 3 113
IN-204 Interior Elevation 4 114
IN-205 Interior Elevation 5 115
IN-211 Interior Elevation 6 116
IN-212 Interior Elevation 7 117
IN-301 Ground Level Furnishings 118
IN-302 Mezzanine Level Furnishings 119
IN-401 Kitchen Plan 1 120
IN-402 Kitchen Plan 2 121
IN-411 Kitchen Elevations 122
IN-421 Kitchen Section 1 123
IN-422 Kitchen Section 2 124
IN-423 Kitchen Section 3 125
IN-501 Bathroom Plan 126
IN-511 Bathroom Elevations 127
-
2
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-102
ST 2014/04/30 CD Submission
ST -
-
SHEET LIST 2 IN-604 Interior Rendering View From Terrace 131
IN-701 Workstation Plan 132
IN-711 Workstation Elevations 133
IN-721 Workstation Sections 134
5. STRUCTURAL (ST)
ST-001 Foundation Plan and Details 135
ST-002 Structural Floor Unit 136
ST-011 Structural Ground Level Plan 137
ST-012 Structural Mezzanine Level Plan 138
ST-013 Structural Elements Marking Ground Level Plan 139 ST-014 Structural Elements Marking Mezzanine Level Plan 140
ST-021 Structural Roof Plan 141
ST-022 Structural Roof Units 142
ST-023 Structural Elements Marking Roof Plan 143 ST-101 Structural Longitudinal Sections Frame 1 144 ST-102 Structural Longitudinal Sections Frame 2 145 ST-103 Structural Longitudinal Sections Frame 3 146 ST-104 Structural Longitudinal Sections Frame 4 147 ST-111 Structural Transversal Sections Frame A 148 ST-112 Structural Transversal Sections Frame A-3 149 ST-113 Structural Transversal Sections Frame A-4 150 ST-114 Structural Transversal Sections Frame B 151 ST-115 Structural Transversal Sections Frame B-1 152 ST-116 Structural Transversal Sections Frame C 153 ST-117 Structural Transversal Sections Frame C-1 154 ST-118 Structural Transversal Sections Frame D 155
ST-201 Structural Blow ups 156
ST-301 Structural Details 157
ST-302 Structural Details Axon 158
ST-401 Structural Axon 159
6. FIRE PROTECTION (FP)
FP-001 Fire Protection Details 160
FP-002 Fire Protection : Ground Level 161
FP-003 Fire Protection : Mezzanine Level 162
FP-004 Fire Protection Evacuation Path : Ground Level 163 FP-005 Fire Protection Evacuation Path : Mezzanine Level 164 7. PLUMBING (PL)
PL-001 Plumbing Supply and Removal Ground Level Plan. 165 PL-002 Plumbing Supply and Removal Ground Mezzanine Plan. 166
PL-011 Gray Water Ground Level 167
PL-012 Gray Water Mezzanine Level 168
PL-021 Drain / Waste / Vent 169
PL-031 Containers and Fill Locations 170
PL-101 Schematic diagram in Taiwan 171
PL-102 Schematic diagram in Competition 172
PL-201 Supply and removal Clean Water Isometric 173 PL-202 Supply and removal Hot Water Isometric 174
PL-211 Grey water Isometric 175
PL-221 Drain/Waste/Vent Isometric 176
PL-301 Green Core Irrigation Plan 177
PL-302 Green Core Irrigation Elevation 1 178
PL-303 Green Core Irrigation Elevation 2 179
8. SOLAR WATER HEATING (SW)
SW-001 Solar Water Plan 180
SW-101 Solar Water Isometric 181
SW-201 Solar Water Schematic 182
9. MECHANICAL (ME)
ME-001 HVAC Distribution Plan Ground Level 183 ME-002 HVAC Distribution Plan Mezzanine Level 184
ME-041 Ventilation 1 189
ME-042 Ventilation 2 190
ME-101 Mechanical room elevations 191
ME-201 HVAC System Schematic drawings 192
ME-211 Heating mode Schematic drawings 1 193
ME-212 Heating mode Schematic drawings 2 194
ME-221 Cooling mode Schematic drawings 1 195
ME-222 Cooling mode Schematic drawings 2 196
ME-231 Controls 1 197
ME-232 Controls 2 198
ME-301 Isometric Distribution 1 199
ME-302 Isometric Distribution 2 200
10. ELECTRICAL (EL)
EL-001 Grid interconnection 201
EL-201 DC wiring diagram 202
EL-301 Power Plan Ground Level 203
EL-302 Power Plan Mezzanine Level 204
EL-401 Lighting Plan Site 205
EL-402 Lighting Plan Ground Level 206
EL-403 Lighting Plan Mezzanine Level 207
EL-501 One-line Diagram 1 208
EL-502 One-line Diagram 2 209
EL-503 One-line Diagram 3 210
EL-601 AC Circuit layout 211
EL-602 AC Circuit layout 212
EL-603 AC Circuit layout 213
11. PHOTOVOLTAIC SYSTEM (PV)
PV-001 Photovoltaic System: General 1 214
PV-002 Photovoltaic System: General 2 215
PV-003 Photovoltaic System: General 3 216
PV-011 Photovoltaic System: DC circuits 217
PV-021 Photovoltaic System: AC citcuits 218
PV-031 Photovoltaic System: grounding system 219 PV-041 Photovoltaic System: Module Layout 220 PV-042 Photovoltaic System: Module String Layout 221 12. TELECOMMUNICATIONS AND BUILDING AUTOMATIZATION SYSTEM (BAS)
BAS-001 Wiring Plan Ground Level 222
BAS-002 Wiring Plan Mezzanine Level 223
BAS-101 Schematic diagram 1 224
BAS-102 Schematic diagram 2 225
BAS-201 Equipment 1 226
BAS-202 Equipment 2 227
13. SDE INSTRUMENTATION DRAWINGS (ID)
ID-001 General Monitoring Ground Level 228
ID-002 General Monitoring Mezzanine Level 229
ID-003 Electricity Meter Connection 230
ID-011 Monitoring Panel Room 231
ID-021 Electricity Meters Topology 232
ID-031 Electricity Meters Connection 232
ID-041 House Appliances Ground Level 234
ID-042 House Appliances Mezzanine Level 235
-3
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-103
ST 2014/04/30 CD Submission
ST -
-
SHEET LIST 3 SO-011 Trucks Shipment During Assembly Phase 1 237
SO-012 Trucks Shipment During Assembly Phase 2 238 SO-013 Trucks Shipment During Assembly Phase 3 239 SO-014 Trucks Shipment During Assembly Phase 4 240 SO-015 Trucks Shipment During Assembly Phase 5 241 SO-021 Trucks Shipment During Disassembly Phase 1 242 SO-022 Trucks Shipment During Disassembly Phase 2 243 SO-023 Trucks Shipment During Disassembly Phase 3 244 SO-024 Trucks Shipment During Disassembly Phase 4 245 SO-025 Trucks Shipment During Disassembly Phase 5 246
SO-101 La Cité du Soleil® Plan 247
SO-102 Assembly Lot Plan 248
SO-103 Disassembly Lot Plan 249
SO-201 Assembly Phase 1 250
SO-202 Assembly Phase 2 251
SO-203 Assembly Phase 3 252
SO-204 Assembly Phase 4 253
SO-205 Assembly Phase 5 254
SO-206 Assembly Phase 6 255
SO-207 Assembly Phase 7 256
SO-208 Assembly Phase 8 257
SO-209 Assembly Phase 9 258
SO-210 Assembly Phase 10 259
SO-301 Disassembly Phase 1 260
SO-302 Disassembly Phase 2 261
SO-303 Disassembly Phase 3 262
SO-304 Disassembly Phase 4 263
SO-305 Disassembly Phase 5 264
SO-306 Disassembly Phase 6 265
SO-307 Disassembly Phase 7 266
SO-308 Disassembly Phase 8 267
SO-309 Disassembly Phase 9 268
SO-310 Disassembly Phase 10 269
15. HEALTH AND SAFETY (HS)
HS-001 Health and Safety in the lot and surroundings 1 270 HS-002 Health and Safety in the lot and surroundings 2 271 HS-101 Health and Safety during the Outside Logistic 272 HS-201 Health and Safety during the Inside Logistic 273 HS-301 Health and Safety during load / unload 274
HS-302 Health and Safety Signposting 275
HS-303 Health and safety PPE 276
HS-401 Health and Safety during Assembly Phase 1 277 HS-402 Health and Safety during Assembly Phase 2 278 HS-403 Health and Safety during Assembly Phase 3 279 HS-404 Health and Safety during Assembly Phase 4 280 HS-405 Health and Safety during Assembly Phase 5 281 HS-406 Health and Safety during Assembly Phase 6 282 HS-407 Health and Safety during Assembly Phase 7 283 HS-408 Health and Safety during Assembly Phase 8 284 HS-409 Health and Safety during Assembly Phase 9 285 HS-410 Health and Safety during Assembly Phase 10 286 HS-501 Health and Safety during Maintenance 287 HS-601 Health and Safety during Disassembly Phase 1 288 HS-602 Health and Safety during Disassembly Phase 2 289 HS-603 Health and Safety during Disassembly Phase 3 290 HS-604 Health and Safety during Disassembly Phase 4 291 HS-605 Health and Safety during Disassembly Phase 5 292 HS-606 Health and Safety during Disassembly Phase 6 293 HS-607 Health and Safety during Disassembly Phase 7 294 HS-608 Health and Safety during Disassembly Phase 8 295 HS-609 Health and Safety during Disassembly Phase 9 296 HS-610 Health and Safety during Disassembly Phase 10 297
PT-002 Site accessibility Elevation 299
PT-101 House Tour Plan 300
PT-201 House Tour General Information 301
-
4
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-201
ST 2014/04/30 CD Submission
SS DN -
GENERAL SYMBOLS
SHEET DWG
SHEET DWG
SHEET DWG
SHEET DWG
No.
EL ±0xx xx NAME GWG.
SHEET DWG
ELEVATION MARK
SECTION MARK
ROOM TAG
GRID NUMBER
ELEVATION MARKER
1 2 4 XX 3
DWG INTERIOR ELEVATION
MARKER
DOOR TAG
WINDOW TAG DOOR #
WIN#
WATERPROOF RECESSED DN LIGHT RECESSED DN LIGHT
S D A
FE EXIST
SPRINKLER
SMOKE DETECTOR SMOKE ALARM
FIRE EXTINGUISHER
EXIST SIGN
EXIST DIRECTION
GENERAL SYMBOLS
-
5
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-211
ST 2014/04/30 CD Submission
DN DN -
# Pound: OR Number
&: And
@: At
ACT: Acoustic Ceiling Tile AD: Area Drain
AFF: Above Finished Floor ALUM: Aluminum ANOD: Anodized BSMT: Basement BYND: Beyond BOT: Bottom CIP: Cast In Place CHNL: Channel CJ: Control Joint CLG: Ceiling CLR: Clear
CMU: Concrete Masonry Unit COL: Column
COMPR: Compressible CONC: Concrete CONT: Continuous CPT: Carpet CT: Ceramic Tile CTYD: Courtyard DBL: Double
DEMO: Demolish or Demolition DIA: Diameter
DIM: Dimension DIMS: Dimensions DN: Down DR: Door DWG: Drawing EA: Each
EJ: Expansion Joint EL: Elevation ELEC: Electrical
ELEV: Elevator or Elevation
EPDM: Ethylene Propylene Diene M-Class (Roofing) EQ: Equal
EXIST: Existing EXP JT: Expansion Joint EXT: Exterior
FD: Floor Drain or Fire Department FEC: Fire Extinguisher Cabinet FIXT: Fixture
FLR: Floor FM: Filled Metal FO: Face Of FND: Foundation GA: Gauge GALV: Galvanized GWB: Gypsum Wall Board HC: Hollow Core
HI: High
HM: Hollow Metal HP: High Point HR: Hour
HVAC: Heating, Ventilating, And Air Conditioning IRGWB: Impact Resistant Gypsum Wall Board ILO: In Lieu Of
INSUL: Insulated or Insulation INT: Interior
LO: Low
MAX: Maximum MO: Masonry Opening MECH: Mechanical MEMBR: Membrane MIN: Minimum
MRGWB: Moisture-Resistant Gypsum Wall Board MTL: Metal
NIC: Not In Contract NO: Number NOM: Nominal OC: On Center OH: Opposite Hand OZ: Ounce
PCC: Pre-Cast Concrete PLUMB: Plumbing PLYD: Plywood PT: Pressure Treated PNT: Paint or Painted PVC: Polyvinyl Chloride RBR: Rubber
RCP: Reflected Ceiling Plan RD: Roof Drain
REQD: Required RM: Room SIM: Similar
SPEC: Specified OR Specification SPK: Sprinkler or Speaker SSTL: Stainless Steel
STC: Sound Transmission Coefficient STL: Steel
STRUCT: Structure or Structural T&G: Tongue And Groove TELE: Telephone TLT: Toilet TO: Top Of
TOC: Top Of Concrete TOS: Top Of Steel
TPD: Toilet Paper Dispenser T/D: Telephone/Data TYP: Typical
UNO: Unless Noted Otherwise U/S: Underside
VIF: Verify In Field VP: Vision Panel W/: With WD: Wood
-
GENERAL ABBREVIATIONS
6
ST DN - -
Urban Project Location (compare with France’s 674,834 km2 and 65.7
million people). The population density is especially high because two-thirds of the island is composed of mountains, and as a result most people live along the coastal areas.
It is especially crowded in urban areas, such as the capitol city, Taipei, which is one of the top ten densest cities in the world. In addition to the high population density, Taipei also developed rapidly over the years, both of which contribute to a random assortment of architecture in the city that expands
horizontally instead of vertically to conserve space.
However, also as a result of the rapid development, many of the residential buildings were not built to last and have infrastructure that is now rundown or outdated. In recent years, new residential buildings are sky scraper apartments, which are usually only affordable by the wealthy upper class because of the luxury design and locations in the city center.
This population growth results in the lack of living space and sufficient public amenity, and cause middle classes moving toward the periphery, even outside of city. The majority of these people are young professionals who just graduated from collage whom have worked a few years, and they are not able to afford a house yet. However, most of them works in the city center and commute, and caused major traffic congestions with millions of cars and motorcycle. Consequently, the city is left with a high carbon dioxide pollution, and the decrease living quality.
7
Taipei, Taiwan
Population: 2,650,900 Area: 271.8 km² Density: 9,753 Person/km²
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-301
ST 2014/04/30 CD Submission
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-310
ST 2014/04/30 CD Submission
RL DN -
URBAN PROPOSAL EXPLANATION 1
-
8
Taipei city population reached its 20-year peak and residential building has been constructed in various types.
The majorities are a duplex apartment, which is relatively wide and 4 to 5 story building, and a row house that is extremely narrow and deep single family owned. These two types were constructed during the modern democracy period. Most of flat-roof duplex apartment and row house are facing problems: leakage, heat absorption and no public facilities. Therefore, the illegal make-shift metal roofed shelters have been introduced widely in most of the residential buildings and create unregulated cityscape of Taipei.
For Orchid House urban design strategy, NCTU UNICODE focus districts where the most of duplex apartment and row house are located as the most needed area for urban regeneration to vitalize not only the residential building, but also these districts.
As main focal point of Ximending Zero Energy District plan, NCTU UNICODE proposes not only PV panel implementation to buildings, but also larger scale of renewable energy sources such as CSP (Concentrated Solar Power), Biomass, Wind power and Geothermal. In order for all renewable energy sources to be distributed efficiently, advanced applications of Wide-area-Measurement System (WAMS) is installed one of larger footprint building rooftops, and Data Centre (MDMS) serve all the energy with automation system.
Furthermore, AMI (Advanced Metering Infrastructure) is installed to Orchid House Clusters to manage power supply within houses. Please refer Architecture Design Narrative for farther details of AMI integration to housing appliances.
The Orchid House Cluster acts as a pilot project for further development of smart building energy
management technology. Eventually, AMI system will be installed to most of buildings in the district to
increase 20% energy usage efficiency from conventional grid system.
SC DN -
URBAN PROPOSAL EXPLANATION 2
-
9
district urban planning, but also to apply new concept of urban regeneration. Almost 50% of residential building in Taipei city are over 30 years old and typically demolished during the renewal planning. However, NCTU UNICODE points out the problem of city re-development organized by government and executed by private developers. The developer tends to acquire larger number of properties to combine the land FAR (Floor Area Ratio) to build up high-rise residential condominium, which is not affordable for average income level and treated as investment target by investors.
Orchid House will proved unique opportunity for not only the building owner, but also the targeted tenants, who needs housing support to pursue their young profession to promote new creative industry in Taipei.
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-311
ST 2014/04/30 CD Submission
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-320
ST 2014/04/30 CD Submission
ST DN -
EXISTING BUILDING DRAWING AND ANALYSIS
-
Taipei Residential Type Analysis
Duplex Apartment 30%
Row House 20%
Super Luxury Housing 6%
Single House 7%
Community Housing 18%
Super Tiny Housing 18%
Comdominium 12%
Stack Villa 1%
DESCRIPTION
Row House and Duplex Apartment are the most number of Taipei residential building Type. These two types are usually 4 to 5 floor high and the oldest building in Taipei, which are about 20 to 30 years old and facing some following problems:
1. Top floor Leaking 2. Top floor is too hot 3. No Public Facility
Presently, most households live in flat-roofed row houses and duplex apartments, but due to a lack of space, people try to expand their living area by building on their roofs.
The illegal make-shift metal-roofed shelters that result are unregulated and
displeasing to the eye. Lastly, social housing projects have fallen to the wayside and do not adequately consider the needs of disadvantaged groups, social justice, and the problems of housing for those with low-income.
10
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-330
ST 2014/04/30 CD Submission
CC DN -
COMPETITION DWELLING
-
Extension Canopy Rooftop Garden
Steel Bar Window Extended Signboard
Small-Scale Street
11
CC DN
-
PAVILION EAST SIDE RENDERING
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-401
ST 2014/04/30 CD Submission
-
N
12
CC DN
-
PAVILION WEST SIDE RENDERING
- Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
GE-402
ST 2014/04/30 CD Submission
N
13
DTU ROF CUJ
SHU REC KMU
PLT FNX ATC BAR OTP DEL LUC BUC ROM PAR
S1 S2
S3 UNI
ST DN 1:1000
La Cité du Soleil® PLAN
mm Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-001
ST 2014/04/30 CD Submission
14
LOT "S"
LOT "Q"
LOT "P"
EL ±0
EL +710
EL +430
EL +710
EL +398 EL ±0
8600 (5% SLOPE)1875
1650 200 1600 6075
10370 (<5% SLOPE) 6480
16006240 (5% SLOPE)8850
60151600
3900 2300 1600
1825
425
Makino bamboos
Makino bamboos EL ±0 Makino bamboos
425
Vanilla garden
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-002
ST 2014/04/30 CD Submission
CF - 1:100
SITE PLAN
mm
0 1 2 5 METER
15
Solar Envelope 20000
20000
5000 10000 5000
5000100005000
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-011
ST 2014/04/30 CD Submission
CF DN 1:100
SOLAR ENVELOPE
mm NORTH
SOUTH
EAST
0 1 2 5 METER
10000
7000
20000
10000
7000
20000
10000
7000
20000
10000
7000
20000
16
PhotovoltaicBESS Inverter&Battery Delta H=2000
Couch Piping Shaft Indoor
unit Humidifier
UP
Indoor unit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Piping Shaft
ARCHITECTURE FOOTPRINT
146.6 m²
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-014
ST 2014/04/30 CD Submission
CF DN 1:100
ARCHITECTURE FOOTPRINT
mm
0 1 2 5 METER
17
MAXIMUM MEASURABLE AREA
56.92 m²
PhotovoltaicBESS Inverter&Battery Delta H=2000
Couch Piping Shaft Indoor
unit Humidifier
UP
Indoor unit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Piping Shaft
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-017
ST 2014/04/30 CD Submission
CF DN 1:100
MEASURABLE AREA
mm
0 1 2 5 METER
18
MECH. RM.
BATHROOM
BEDROOM WORKSTATION
KITCHEN
TEA TERRACE
LIVING RM.
ENTRANCE
BESS Photovoltaic Inverter&Battery Delta H=2000
Couch Piping Shaft
Indoor unit Humidifier
UP
Indoor unit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Piping Shaft
SEE AR-213
SEE AR-212
SEE AR-211
3600 1800 3600
A
A-3
A-4
B
C
D B-1
C-1
800169017102100210021002100
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-021
ST 2014/04/30 CD Submission
CF DN 1:100
GROUND LEVEL PLAN
mm
0 1 2 5 METER
19
OPEN TO BELOW LAUNDRY HANGING AREA
Evaporation Cooling Wall Exhaust Area Mezzanine
SEE AR-213
SEE AR-212
SEE AR-211 Rain Water Collection Surface
Kitchen Exhaust
OPEN TO BELOW
Air Hose / Refrigerant Pipe H=200
Cold Water Pipe / Hot Water Pipe / Electric Tube
3600 1800 3600
A
A-3
A-4
B
C
D B-1
C-1
800169017102100210021002100
Washing Machine Miele W 6641 H=900
Clothes Dryer BOSCH WTC82101TC H=842
Heat Pump ���� MK-150 H=540 HVAC ��� DAIKIN RXYMQPVET H=1345
Air Hose
Air Hose hot water tank (300L) Wind Pipe
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Wind Pipe
DN
CO2 Heat Pump Tank Panasonic HE-WU37CQ H=1843
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-022
ST 2014/04/30 CD Submission
CF DN 1:60
MEZZANINE LEVEL PLAN
mm
0 1 2 5 METER
20
SEE AR-213
SEE AR-212
SEE AR-211 Bayer Makrolon® Solid Sheet Bayer Makrolon® Polypropylene Hollow Sheet
Aluminum Louvers
Delta PV Panel
Aluminum Louvers Clear Glass
Solar Water Heater
3600 1800 3600
A
A-3
A-4
B
C
D B-1
C-1
800169017102100210021002100
Fan Exhaust
CF DN 1:60
ROOF LEVEL PLAN
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-031
ST 2014/04/30 CD Submission
mm
0 1 2 5 METER
21
Swing Door
Awning Window
Solar Envelope
335 3765 5975
10075
335 408
10075
89756082 15057
410639063751882
15057
Architecture Footprint
9332
410127351912
Sliding Door
Louvers
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-041
ST 2014/04/30 CD Submission
CF DN 1:100
RECONFIGURABLE FEATURES 1
mm Canopy 8.7 M2
Louvers:17.8 M2 Total:146.9 M2
0 1 2 5 METER
House
9.332x12.735+0.6375x0.7854x3.14=120.4 (M2) Canopy
5.975x0.41+(8.975-0.41)x0.408+6.375x0.335=8.0 (M2) Louvers
9.332x1.912=17.8 (M2) Total
120.41+8.05+17.84=146.3 (M2)
22
BESSPhotovoltaic Inverter&Battery Delta H=2000
Couch Piping Shaft
Indoor unit Humidifier
UP
Indoor unit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Piping Shaft
Swing Door
Sliding Door
Louvers Awning Window
Washing Machine Miele W 6641 H=900
Clothes Dryer BOSCH WTC82101TC H=842
Heat Pump ���� MK-150 H=540 HVAC ��� DAIKIN RXYMQPVET H=1345
Air Hose
Air Hose hot water tank (300L) Wind Pipe
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Wind Pipe
DN
CO2 Heat Pump Tank Panasonic HE-WU37CQ H=1843
Louvers
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-042
ST 2014/04/30 CD Submission
CF DN 1:100
RECONFIGURABLE FEATURES 2
mm
0 1 2 5 METER
23
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-043
ST 2014/04/30 CD Submission
CF DN N/A
RECONFIGURABLE FEATURES 3
Louvers N/A Sliding Door Swing Door Awning Window
24
Solar Envelope Solar Envelope
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-044
ST 2014/04/30 CD Submission
CH DN 1:40
RECONFIGURABLE FEATURES 4
mm
0 0.5 1 2 METER
25
PhotovoltaicBESS Inverter&Battery Delta H=2000
Couch Piping Shaft Indoor
unit Humidifier
UP
Indoor unit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Piping Shaft
Entrance
Exit
Solar Envelope
LOT "S"
LOT "Q"
LOT "P"
EL ±0
EL +710
EL +430
EL +710
EL +398 EL ±0
8600 (5% SLOPE)1875
1650 200 1600 6075
10370 (<5% SLOPE) 6480
16006240 (5% SLOPE)8850
60151600
3900 2300 1600
1825
425
Makino bamboos
Makino bamboos EL ±0 Makino bamboos
425
Vanilla garden
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-051
ST 2014/04/30 CD Submission
CF DN 1:100
SITE ENTRANCE AND EXIT
mm
0 1 2 5 METER
26
EL ±0GL EL +7101st FL EL +1810Handrail
398312 710
398312 710
430
10370 6480
430280 710
EL ±0GL EL +7101st FL EL +1810Handrail
398312710
EL ±0GL EL +7101st FL EL +1810Handrail
710
8600 1875
EL ±0GL EL +7101st FL EL +1810Handrail
710398
1600 6240 8850
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-101
ST 2014/04/30 CD Submission
CF ST 1:60
SITE ELEVATION
North
mm South
East
0 1 2 5 METER
27
<5% Slope
5% Slope
5% Slope
2100 2100 2100 2100 1710 1690 800 12600
18°
72°
72° 53°
37°
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
Bayer
Makrolon®Polycarbonate Inter-Locking Hollow Sheet t=40mm
Canopy
Bayer
Makrolon®Polycarbonate Hollow Sheet
t=10mm Exhaust Louver
Handrail
Footing
A A-3
A-4 B
B-1 C
C-1 D
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-111
ST 2014/04/30 CD Submission
CF DN 1:60
EAST ELEVATION
mm
0 1 2 5 METER
28
1 2
3 4
3600 1800 3600
9000
ENTRANCE
Louvers
Bayer
Makrolon® Polycarbonate Hollow Sheett= 16 mm
Bayer
Makrolon® Solid Sheet t= 10 mmBayer
Makrolon® Polycarbonate
Hollow Sheett= 16 mm
Swing Door
Bayer
Makrolon® Polycarbonate
Hollow Sheett= 10 mm
Canopy Canopy
Handrail
Footing
Sand BoxEL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-112
ST 2014/04/30 CD Submission
CF DN 1:60
NORTH ELEVATION
mm
0 1 2 5 METER
29
1 2 3 4
3600 1800 3600
9000
PV Module Clear Glass
Solar Water Heater
Aluminum Louvers
Glass Louvers Canopy Canopy
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-113
ST 2014/04/30 CD Submission
CF DN 1:60
SOUTH ELEVATION
mm
0 1 2 5 METER
30
A A-3 A-4 B B-1 C C-1 D
800 1690 1710 2100 2100 2100 2100
12600
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
Bayer
Makrolon®Polycarbonate Inter-Locking Hollow Sheet t=40mm
Canopy
POLLI-Brick
™ (Thermal Wall)
Bayer
Makrolon®Polycarbonate Hollow Sheet
t=10mm
53° 72°
18°
72°
37°
Canopy
Handrail
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-114
ST 2014/04/30 CD Submission
CF DN 1:60
WEST ELEVATION
mm
0 1 2 5 METER
31
Fix
2100 2100 2100 2100 1710 1690 800
12600 SEE AR-212
SEE AR-211 SEE AR-213
A A-3
A-4 B
B-1 C
C-1 D
Louvers Water pan
PV Module Steel Beam Box 150x150 t=4.5
Wood floor Duct
Bayer Makrolon® Polycarbonate Hollow Sheet
t=10mm
Seat
Vacuum Insulation panel E-foam
Delta DC Fan VFB25AEHT
Bayer Makrolon® Polycarbonate Hollow Sheet
t=16mm Gutter Gutter
POLLI-Bricks™
( Thermal mass )
Footing
Glass Louvers
Bayer
Makrolon® PolycarbonateInter-Locking Hollow Sheet t=40mm
Wood Plastic Composites Steel Beam H 150x150
Aluminum Louvers
Evaporation Cooling Wall
Steel Beam C 150x75
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-201
ST 2014/04/30 CD Submission
CF DN 1:60
LONGITUDINAL SECTION 1
mm
0 1 2 5 METER
AR-3433 AR-3223
AR-3213
32
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
2100 2100 2100 2100 1710 1690 800
12600
SEE AR-212
SEE AR-211 SEE AR-213
A A-3
A-4 B
B-1 C
C-1 D
Water pan
Evaporation Cooling Wall
PV Module Steel Beam Box 150x150x4.5
Plant Pots
Green core
Gutter Gutter
Canopy
Bayer Makrolon® Polycarbonate Solid Sheett=6mm
Wood Plastic Composites
Delta DC Fan VFB25AEHT
Bayer Makrolon® Polycarbonate Hollow Sheet
t=16mm
Glass Louvers
Steel Beam I 150x150 t=4.5
Aluminum Louvers
Glass Louvers
Steel Beam Box 150x150 t=4.5 Aluminum Louvers
Wood floor Vacuum Insulation panel E foam
Duct
Footing
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-202
ST 2014/04/30 CD Submission
CF DN 1:60
LONGITUDINAL SECTION 2
mm
0 1 2 5 METER
33
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
2100 2100 2100 2100
12600 1710
1690 800
SEE AR-212 SEE AR-211
SEE AR-213
A A-3 A-4 B B-1 C C-1 D
Glass Louvers Water pan
PV Module
Steel Beam Box 150x150 t=4.5
Wood Plastic Composites
Steel Beam C 150x75
Bayer Makrolon® PolycarbonateWood floor
Hollow Sheet
t=10mm
Vacuum Insulation panel
E-foam Delta DC Fan VFB25AEHT
Bayer Makrolon® Polycarbonate Hollow Sheet
t=16mm
Gutter
Gutter
Canopy
Footing
Bayer Makrolon
®PolycarbonateInter-Locking Hollow Sheet t=40mm
Aluminum Louvers Evaporation Cooling Wall Duct
Steel Beam C 150x75
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-203
ST 2014/04/30 CD Submission
CF DN 1:60
LONGITUDINAL SECTION 3
mm
0 1 2 5 METER
AR-3213
34
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
3600 1800 3600
9000
SEE AR-202 SEE AR-203
SEE AR-201
1 2 3 4
Water pan
Footing
PV Module
Canopy
Bayer Makrolon
®PolycarbonateInter-Locking Hollow Sheet t=40mm
Clear Glass
Solar Water HeaterBed Work Station
Living Room
ACBedroom POLLI-Bricks
™(Thermal mass)
Gutter
Gutter
Kitchen
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-211
ST 2014/04/30 CD Submission
CF DN 1:60
TRANSVERSAL SECTIONS 1
mm
0 1 2 5 METER
AR-3423
AR-3512
35
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
3600 1800 3600
9000
SEE AR-202 SEE AR-203
SEE AR-201
Green core
Kitchen Tea Terrace
Bayer Makrolon® Polycarbonate Solid Sheet
t=6mm
Bayer Makrolon
®PolycarbonateInter-Locking Hollow Sheet t=40mm
Gutter PV Module
Canopy
Footing
Bayer Makrolon
®PolycarbonateHollow Sheet
t=10mm
Bayer Makrolon
®PolycarbonateHollow Sheet
t=10mm
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-212
ST 2014/04/30 CD Submission
CF DN 1:60
TRANSVERSAL SECTIONS 2
mm
0 1 2 5 METER
AR-3522
AR-3512
36
Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam
EL ±0GL
SEE AR-202 SEE AR-203
SEE AR-201
1 2 3 4
1410
3600 1800 3600
9000
Canopy
Bayer Makrolon® Polycarbonate Hollow Sheet
t=10mm
Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm
Gutter PV Module
Greencore
Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm
Gutter
Bayer Makrolon
® Polycarbonate Solid Sheett=6mm
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-213
ST 2014/04/30 CD Submission
CF DN 1:60
TRANSVERSAL SECTIONS 3
mm
0 1 2 5 METER
AR-3413
AR-3512 AR-3522
37
BESSPhotovoltaic Inverter&Battery Delta H=2000
Couch Piping Shaft
Indoor unit Humidifier
UP
Indoor unit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Piping Shaft
WIN 2
WIN 3
WIN 5
WIN 6 WIN 4
WIN 7 WIN 8
WIN 10
WIN11
WIN12 WIN13
WIN 9
40504050
3450 1650
3450
1950500 19501950
1650 2300
6001170
Project:
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission N
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-301
ST 2014/04/30 CD Submission
CF DN 1:60
WINDOW SCHEDULE AND DETAILS 1
mm
0 1 2 5 METER
38
MO=12000
8400
25 25
40 25 40
H=2400
MO=2470 45 a=1100
10mm
40
25
40 40 40 25 40 40
W=4000 W=4000
150
40 25 40
10mm
40
10mm 10mm 10mm
W=3400
150 150
40
10mm 25
150
W=4000
150 25
25 150
MO=8400 W=4000
150
25
90°
MO=4050 25
MO=4025 25
25 MO=3450
25
MO=4050 MO=4050
3600
25
MO=3450150 25
150MO=3600 W=3400
150
55
INTERIOR EXTERIOR
SEMI-EXTERIOR EXTERIOR
1F Beam
WIN 1
WIN 2 WIN 3
WIN 1 WIN 2 WIN 3
AR-307 14
10mm 10mm 10mm 10mm 10mm 10mm 10mm
Institution:
Team Name:
Checked by Scale
DWG. Title
DWG. No.
Address:
Contact:
NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw
Consultants:
Drawn by
Mark Date Description
Note:
DN 2013/04/01 SD Submission
A B C D E
A B C D E
DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission
Unit
ST 2014/03/03 CD Submission
PAGE
AR-302
ST 2014/04/30 CD Submission
CF DN 1:40
WINDOW SCHEDULE AND DETAILS 2
mm
0 0.5 1 2 METER