• 沒有找到結果。

2014年歐洲盃十項全能能源屋競賽(Solar Decathlon Europe 2014)—交大蘭花屋(Orchid House)計畫 D#5 Project Drawing 設計施工圖

N/A
N/A
Protected

Academic year: 2022

Share "2014年歐洲盃十項全能能源屋競賽(Solar Decathlon Europe 2014)—交大蘭花屋(Orchid House)計畫 D#5 Project Drawing 設計施工圖"

Copied!
301
0
0

加載中.... (立即查看全文)

全文

(1)

National Chiao Tung University

1001 TA HSUEH ROAD, HSINCHU, TAIWAN 30010

Phone: +886-3-5718083

www.sde.tw

facebook.com/twsde

twitter.com/NCTU_UNICODE

(2)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-101

ST 2014/04/30 CD Submission

ST -

-

SHEET LIST 1

GE-101 Sheet List 1 2

GE-102 Sheet List 2 3

GE-103 Sheet List 3 4

GE-201 General Symbols 5

GE-211 General Abbreviations 6

GE-301 Urban Project Location 7

GE-310 Urban Proposal Explanation 1 8

GE-311 Urban Proposal Explanation 2 9

GE-320 Existing Building Drawings and Analysis 10

GE-330 Competition Dwelling 11

GE-401 Pavilion East Side Rendering 12

GE-402 Pavilion West Side Rendering 13

2. ARCHITECTURAL

AR-001 La Cité du Soleil® Plan 14

AR-002 Site Plan 15

AR-011 Solar Envelope 16

AR-014 Architecture Footprint 17

AR-017 Measurable Area 18

AR-021 Ground Level Plan 19

AR-022 Mezzanine Level Plan 20

AR-031 Roof Level Plan 21

AR-041 Reconfigurable Feature 1 22

AR-042 Reconfigurable Feature 2 23

AR-043 Reconfigurable Feature 3 24

AR-044 Reconfigurable Feature 4 25

AR-051 Site Entrance and Exit 26

AR-101 Site Elevation 27

AR-111 East Elevation 28

AR-112 North Elevation 29

AR-113 South Elevation 30

AR-114 West Elevation 31

AR-201 Longitudinal Section 1 32

AR-202 Longitudinal Section 2 33

AR-203 Longitudinal Section 3 34

AR-211 Transversal Section 1 35

AR-212 Transversal Section 2 36

AR-213 Transversal Section 3 37

AR-301 Window Schedule and Details 1 38

AR-302 Window Schedule and Details 2 39

AR-303 Window Schedule and Details 3 40

AR-304 Window Schedule and Details 4 41

AR-305 Window Schedule and Details 5 42

AR-306 Window Schedule and Details 6 43

AR-307 Window Schedule and Details 7 44

AR-308 Window Schedule and Details 8 45

AR-309 Window Schedule and Details 9 46

AR-311 Door Schedule and Details 1 47

AR-312 Door Schedule and Details 2 48

AR-321 Floor Construction Ground Level 49

AR-322 Floor Construction Mezzanine Level 50 AR-323 Floor Construction Details Ground Level 1 51 AR-324 Floor Construction Details Ground Level 2 52 AR-325 Floor Construction Details Ground Level 3 53 AR-326 Floor Construction Details Ground Level 4 54 AR-327 Floor Construction Details Ground Level 5 55 AR-328 Floor Construction Details Mezzanine Level 1 56 AR-329 Floor Construction Details Mezzanine Level 2 57 AR-330 Floor Construction Details Mezzanine Level 3 58 AR-331 Floor Construction Details Mezzanine Level 4 59 AR-332 Ceiling Construction Details Mezzanine Level 1 60 AR-333 Ceiling Construction Details Mezzanine Level 2 61 AR-334 Ceiling Construction Details Mezzanine Level 3 62

AR-336 Roof Construction Details 63

AR-363 Joints Details 3 68

AR-364 Joints Details 4 69

AR-371 Stair Details 1 70

AR-372 Stair Details 2 71

AR-401 Green Core Details 1 72

AR-402 Green Core Details 2 73

AR-403 Green Core Details 3 74

AR-404 Green Core Details 4 75

AR-411 Blue Wall Details 76

AR-421 Smart Skin Details 77

AR-431 Thermal Wall Details 1 78

AR-432 Thermal Wall Details 2 79

AR-433 Thermal Wall Details 3 80

AR-434 Thermal Wall Details 4 81

AR-435 Thermal Wall Details 5 82

AR-436 Thermal Wall Details 6 83

AR-437 Thermal Wall Details 7 84

AR-438 Thermal Wall Details 8 85

AR-439 Thermal Wall Details 9 86

AR-440 Thermal Wall Details 10 87

AR-441 Thermal Wall Details 11 88

AR-442 Thermal Wall Details 12 89

AR-443 Thermal Wall Details 13 90

3. BIOCLIMATIC ANALYSIS (BA)

BA-001 Taipei Climate Analysis 91

BA-002 Taipei Shading Analysis 92

BA-003 Taipei Wind Rose Analysis 93

BA-004 Versailles Climate Analysis 94

BA-005 Versailles Shading Analysis 95

BA-006 Versailles Wind Rose Analysis 96

BA-011 Bioclimatic Strategies 97

BA-012 Natural Ventilation 98

BA-013 Solar Chemny 99

BA-014 Earth/Vegetation cooling 100

BA-015 Evaporative Cooling 101

BA-016 Direct Solar Heating 102

BA-017 Bioclimatic Drawings Heating 103

BA-018 Thermal Wall in Versailles 104

BA-019 Thermal Wall in Taipei 105

BA-020 Heat Exchanger Preheated by Solar Hot Water 106

BA-021 Heat Pump 107

4. INTERIORS (IN)

IN-001 Ground Level Floor 108

IN-002 Mezzanine Level Floor 109

IN-101 Reflected Ceiling 110

IN-201 Interior Elevation 1 111

IN-202 Interior Elevation 2 112

IN-203 Interior Elevation 3 113

IN-204 Interior Elevation 4 114

IN-205 Interior Elevation 5 115

IN-211 Interior Elevation 6 116

IN-212 Interior Elevation 7 117

IN-301 Ground Level Furnishings 118

IN-302 Mezzanine Level Furnishings 119

IN-401 Kitchen Plan 1 120

IN-402 Kitchen Plan 2 121

IN-411 Kitchen Elevations 122

IN-421 Kitchen Section 1 123

IN-422 Kitchen Section 2 124

IN-423 Kitchen Section 3 125

IN-501 Bathroom Plan 126

IN-511 Bathroom Elevations 127

-

2

(3)

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-102

ST 2014/04/30 CD Submission

ST -

-

SHEET LIST 2 IN-604 Interior Rendering View From Terrace 131

IN-701 Workstation Plan 132

IN-711 Workstation Elevations 133

IN-721 Workstation Sections 134

5. STRUCTURAL (ST)

ST-001 Foundation Plan and Details 135

ST-002 Structural Floor Unit 136

ST-011 Structural Ground Level Plan 137

ST-012 Structural Mezzanine Level Plan 138

ST-013 Structural Elements Marking Ground Level Plan 139 ST-014 Structural Elements Marking Mezzanine Level Plan 140

ST-021 Structural Roof Plan 141

ST-022 Structural Roof Units 142

ST-023 Structural Elements Marking Roof Plan 143 ST-101 Structural Longitudinal Sections Frame 1 144 ST-102 Structural Longitudinal Sections Frame 2 145 ST-103 Structural Longitudinal Sections Frame 3 146 ST-104 Structural Longitudinal Sections Frame 4 147 ST-111 Structural Transversal Sections Frame A 148 ST-112 Structural Transversal Sections Frame A-3 149 ST-113 Structural Transversal Sections Frame A-4 150 ST-114 Structural Transversal Sections Frame B 151 ST-115 Structural Transversal Sections Frame B-1 152 ST-116 Structural Transversal Sections Frame C 153 ST-117 Structural Transversal Sections Frame C-1 154 ST-118 Structural Transversal Sections Frame D 155

ST-201 Structural Blow ups 156

ST-301 Structural Details 157

ST-302 Structural Details Axon 158

ST-401 Structural Axon 159

6. FIRE PROTECTION (FP)

FP-001 Fire Protection Details 160

FP-002 Fire Protection : Ground Level 161

FP-003 Fire Protection : Mezzanine Level 162

FP-004 Fire Protection Evacuation Path : Ground Level 163 FP-005 Fire Protection Evacuation Path : Mezzanine Level 164 7. PLUMBING (PL)

PL-001 Plumbing Supply and Removal Ground Level Plan. 165 PL-002 Plumbing Supply and Removal Ground Mezzanine Plan. 166

PL-011 Gray Water Ground Level 167

PL-012 Gray Water Mezzanine Level 168

PL-021 Drain / Waste / Vent 169

PL-031 Containers and Fill Locations 170

PL-101 Schematic diagram in Taiwan 171

PL-102 Schematic diagram in Competition 172

PL-201 Supply and removal Clean Water Isometric 173 PL-202 Supply and removal Hot Water Isometric 174

PL-211 Grey water Isometric 175

PL-221 Drain/Waste/Vent Isometric 176

PL-301 Green Core Irrigation Plan 177

PL-302 Green Core Irrigation Elevation 1 178

PL-303 Green Core Irrigation Elevation 2 179

8. SOLAR WATER HEATING (SW)

SW-001 Solar Water Plan 180

SW-101 Solar Water Isometric 181

SW-201 Solar Water Schematic 182

9. MECHANICAL (ME)

ME-001 HVAC Distribution Plan Ground Level 183 ME-002 HVAC Distribution Plan Mezzanine Level 184

ME-041 Ventilation 1 189

ME-042 Ventilation 2 190

ME-101 Mechanical room elevations 191

ME-201 HVAC System Schematic drawings 192

ME-211 Heating mode Schematic drawings 1 193

ME-212 Heating mode Schematic drawings 2 194

ME-221 Cooling mode Schematic drawings 1 195

ME-222 Cooling mode Schematic drawings 2 196

ME-231 Controls 1 197

ME-232 Controls 2 198

ME-301 Isometric Distribution 1 199

ME-302 Isometric Distribution 2 200

10. ELECTRICAL (EL)

EL-001 Grid interconnection 201

EL-201 DC wiring diagram 202

EL-301 Power Plan Ground Level 203

EL-302 Power Plan Mezzanine Level 204

EL-401 Lighting Plan Site 205

EL-402 Lighting Plan Ground Level 206

EL-403 Lighting Plan Mezzanine Level 207

EL-501 One-line Diagram 1 208

EL-502 One-line Diagram 2 209

EL-503 One-line Diagram 3 210

EL-601 AC Circuit layout 211

EL-602 AC Circuit layout 212

EL-603 AC Circuit layout 213

11. PHOTOVOLTAIC SYSTEM (PV)

PV-001 Photovoltaic System: General 1 214

PV-002 Photovoltaic System: General 2 215

PV-003 Photovoltaic System: General 3 216

PV-011 Photovoltaic System: DC circuits 217

PV-021 Photovoltaic System: AC citcuits 218

PV-031 Photovoltaic System: grounding system 219 PV-041 Photovoltaic System: Module Layout 220 PV-042 Photovoltaic System: Module String Layout 221 12. TELECOMMUNICATIONS AND BUILDING AUTOMATIZATION SYSTEM (BAS)

BAS-001 Wiring Plan Ground Level 222

BAS-002 Wiring Plan Mezzanine Level 223

BAS-101 Schematic diagram 1 224

BAS-102 Schematic diagram 2 225

BAS-201 Equipment 1 226

BAS-202 Equipment 2 227

13. SDE INSTRUMENTATION DRAWINGS (ID)

ID-001 General Monitoring Ground Level 228

ID-002 General Monitoring Mezzanine Level 229

ID-003 Electricity Meter Connection 230

ID-011 Monitoring Panel Room 231

ID-021 Electricity Meters Topology 232

ID-031 Electricity Meters Connection 232

ID-041 House Appliances Ground Level 234

ID-042 House Appliances Mezzanine Level 235

-

3

(4)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-103

ST 2014/04/30 CD Submission

ST -

-

SHEET LIST 3 SO-011 Trucks Shipment During Assembly Phase 1 237

SO-012 Trucks Shipment During Assembly Phase 2 238 SO-013 Trucks Shipment During Assembly Phase 3 239 SO-014 Trucks Shipment During Assembly Phase 4 240 SO-015 Trucks Shipment During Assembly Phase 5 241 SO-021 Trucks Shipment During Disassembly Phase 1 242 SO-022 Trucks Shipment During Disassembly Phase 2 243 SO-023 Trucks Shipment During Disassembly Phase 3 244 SO-024 Trucks Shipment During Disassembly Phase 4 245 SO-025 Trucks Shipment During Disassembly Phase 5 246

SO-101 La Cité du Soleil® Plan 247

SO-102 Assembly Lot Plan 248

SO-103 Disassembly Lot Plan 249

SO-201 Assembly Phase 1 250

SO-202 Assembly Phase 2 251

SO-203 Assembly Phase 3 252

SO-204 Assembly Phase 4 253

SO-205 Assembly Phase 5 254

SO-206 Assembly Phase 6 255

SO-207 Assembly Phase 7 256

SO-208 Assembly Phase 8 257

SO-209 Assembly Phase 9 258

SO-210 Assembly Phase 10 259

SO-301 Disassembly Phase 1 260

SO-302 Disassembly Phase 2 261

SO-303 Disassembly Phase 3 262

SO-304 Disassembly Phase 4 263

SO-305 Disassembly Phase 5 264

SO-306 Disassembly Phase 6 265

SO-307 Disassembly Phase 7 266

SO-308 Disassembly Phase 8 267

SO-309 Disassembly Phase 9 268

SO-310 Disassembly Phase 10 269

15. HEALTH AND SAFETY (HS)

HS-001 Health and Safety in the lot and surroundings 1 270 HS-002 Health and Safety in the lot and surroundings 2 271 HS-101 Health and Safety during the Outside Logistic 272 HS-201 Health and Safety during the Inside Logistic 273 HS-301 Health and Safety during load / unload 274

HS-302 Health and Safety Signposting 275

HS-303 Health and safety PPE 276

HS-401 Health and Safety during Assembly Phase 1 277 HS-402 Health and Safety during Assembly Phase 2 278 HS-403 Health and Safety during Assembly Phase 3 279 HS-404 Health and Safety during Assembly Phase 4 280 HS-405 Health and Safety during Assembly Phase 5 281 HS-406 Health and Safety during Assembly Phase 6 282 HS-407 Health and Safety during Assembly Phase 7 283 HS-408 Health and Safety during Assembly Phase 8 284 HS-409 Health and Safety during Assembly Phase 9 285 HS-410 Health and Safety during Assembly Phase 10 286 HS-501 Health and Safety during Maintenance 287 HS-601 Health and Safety during Disassembly Phase 1 288 HS-602 Health and Safety during Disassembly Phase 2 289 HS-603 Health and Safety during Disassembly Phase 3 290 HS-604 Health and Safety during Disassembly Phase 4 291 HS-605 Health and Safety during Disassembly Phase 5 292 HS-606 Health and Safety during Disassembly Phase 6 293 HS-607 Health and Safety during Disassembly Phase 7 294 HS-608 Health and Safety during Disassembly Phase 8 295 HS-609 Health and Safety during Disassembly Phase 9 296 HS-610 Health and Safety during Disassembly Phase 10 297

PT-002 Site accessibility Elevation 299

PT-101 House Tour Plan 300

PT-201 House Tour General Information 301

-

4

(5)

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-201

ST 2014/04/30 CD Submission

SS DN -

GENERAL SYMBOLS

SHEET DWG

SHEET DWG

SHEET DWG

SHEET DWG

No.

EL ±0xx xx NAME GWG.

SHEET DWG

ELEVATION MARK

SECTION MARK

ROOM TAG

GRID NUMBER

ELEVATION MARKER

1 2 4 XX 3

DWG INTERIOR ELEVATION

MARKER

DOOR TAG

WINDOW TAG DOOR #

WIN#

WATERPROOF RECESSED DN LIGHT RECESSED DN LIGHT

S D A

FE EXIST

SPRINKLER

SMOKE DETECTOR SMOKE ALARM

FIRE EXTINGUISHER

EXIST SIGN

EXIST DIRECTION

GENERAL SYMBOLS

-

5

(6)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-211

ST 2014/04/30 CD Submission

DN DN -

# Pound: OR Number

&: And

@: At

ACT: Acoustic Ceiling Tile AD: Area Drain

AFF: Above Finished Floor ALUM: Aluminum ANOD: Anodized BSMT: Basement BYND: Beyond BOT: Bottom CIP: Cast In Place CHNL: Channel CJ: Control Joint CLG: Ceiling CLR: Clear

CMU: Concrete Masonry Unit COL: Column

COMPR: Compressible CONC: Concrete CONT: Continuous CPT: Carpet CT: Ceramic Tile CTYD: Courtyard DBL: Double

DEMO: Demolish or Demolition DIA: Diameter

DIM: Dimension DIMS: Dimensions DN: Down DR: Door DWG: Drawing EA: Each

EJ: Expansion Joint EL: Elevation ELEC: Electrical

ELEV: Elevator or Elevation

EPDM: Ethylene Propylene Diene M-Class (Roofing) EQ: Equal

EXIST: Existing EXP JT: Expansion Joint EXT: Exterior

FD: Floor Drain or Fire Department FEC: Fire Extinguisher Cabinet FIXT: Fixture

FLR: Floor FM: Filled Metal FO: Face Of FND: Foundation GA: Gauge GALV: Galvanized GWB: Gypsum Wall Board HC: Hollow Core

HI: High

HM: Hollow Metal HP: High Point HR: Hour

HVAC: Heating, Ventilating, And Air Conditioning IRGWB: Impact Resistant Gypsum Wall Board ILO: In Lieu Of

INSUL: Insulated or Insulation INT: Interior

LO: Low

MAX: Maximum MO: Masonry Opening MECH: Mechanical MEMBR: Membrane MIN: Minimum

MRGWB: Moisture-Resistant Gypsum Wall Board MTL: Metal

NIC: Not In Contract NO: Number NOM: Nominal OC: On Center OH: Opposite Hand OZ: Ounce

PCC: Pre-Cast Concrete PLUMB: Plumbing PLYD: Plywood PT: Pressure Treated PNT: Paint or Painted PVC: Polyvinyl Chloride RBR: Rubber

RCP: Reflected Ceiling Plan RD: Roof Drain

REQD: Required RM: Room SIM: Similar

SPEC: Specified OR Specification SPK: Sprinkler or Speaker SSTL: Stainless Steel

STC: Sound Transmission Coefficient STL: Steel

STRUCT: Structure or Structural T&G: Tongue And Groove TELE: Telephone TLT: Toilet TO: Top Of

TOC: Top Of Concrete TOS: Top Of Steel

TPD: Toilet Paper Dispenser T/D: Telephone/Data TYP: Typical

UNO: Unless Noted Otherwise U/S: Underside

VIF: Verify In Field VP: Vision Panel W/: With WD: Wood

-

GENERAL ABBREVIATIONS

6

(7)

ST DN - -

Urban Project Location (compare with France’s 674,834 km2 and 65.7

million people). The population density is especially high because two-thirds of the island is composed of mountains, and as a result most people live along the coastal areas.

It is especially crowded in urban areas, such as the capitol city, Taipei, which is one of the top ten densest cities in the world. In addition to the high population density, Taipei also developed rapidly over the years, both of which contribute to a random assortment of architecture in the city that expands

horizontally instead of vertically to conserve space.

However, also as a result of the rapid development, many of the residential buildings were not built to last and have infrastructure that is now rundown or outdated. In recent years, new residential buildings are sky scraper apartments, which are usually only affordable by the wealthy upper class because of the luxury design and locations in the city center.

This population growth results in the lack of living space and sufficient public amenity, and cause middle classes moving toward the periphery, even outside of city. The majority of these people are young professionals who just graduated from collage whom have worked a few years, and they are not able to afford a house yet. However, most of them works in the city center and commute, and caused major traffic congestions with millions of cars and motorcycle. Consequently, the city is left with a high carbon dioxide pollution, and the decrease living quality.

7

Taipei, Taiwan

Population: 2,650,900 Area: 271.8 km² Density: 9,753 Person/km²

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-301

ST 2014/04/30 CD Submission

(8)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-310

ST 2014/04/30 CD Submission

RL DN -

URBAN PROPOSAL EXPLANATION 1

-

8

Taipei city population reached its 20-year peak and residential building has been constructed in various types.

The majorities are a duplex apartment, which is relatively wide and 4 to 5 story building, and a row house that is extremely narrow and deep single family owned. These two types were constructed during the modern democracy period. Most of flat-roof duplex apartment and row house are facing problems: leakage, heat absorption and no public facilities. Therefore, the illegal make-shift metal roofed shelters have been introduced widely in most of the residential buildings and create unregulated cityscape of Taipei.

For Orchid House urban design strategy, NCTU UNICODE focus districts where the most of duplex apartment and row house are located as the most needed area for urban regeneration to vitalize not only the residential building, but also these districts.

As main focal point of Ximending Zero Energy District plan, NCTU UNICODE proposes not only PV panel implementation to buildings, but also larger scale of renewable energy sources such as CSP (Concentrated Solar Power), Biomass, Wind power and Geothermal. In order for all renewable energy sources to be distributed efficiently, advanced applications of Wide-area-Measurement System (WAMS) is installed one of larger footprint building rooftops, and Data Centre (MDMS) serve all the energy with automation system.

Furthermore, AMI (Advanced Metering Infrastructure) is installed to Orchid House Clusters to manage power supply within houses. Please refer Architecture Design Narrative for farther details of AMI integration to housing appliances.

The Orchid House Cluster acts as a pilot project for further development of smart building energy

management technology. Eventually, AMI system will be installed to most of buildings in the district to

increase 20% energy usage efficiency from conventional grid system.

(9)

SC DN -

URBAN PROPOSAL EXPLANATION 2

-

9

district urban planning, but also to apply new concept of urban regeneration. Almost 50% of residential building in Taipei city are over 30 years old and typically demolished during the renewal planning. However, NCTU UNICODE points out the problem of city re-development organized by government and executed by private developers. The developer tends to acquire larger number of properties to combine the land FAR (Floor Area Ratio) to build up high-rise residential condominium, which is not affordable for average income level and treated as investment target by investors.

Orchid House will proved unique opportunity for not only the building owner, but also the targeted tenants, who needs housing support to pursue their young profession to promote new creative industry in Taipei.

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-311

ST 2014/04/30 CD Submission

(10)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-320

ST 2014/04/30 CD Submission

ST DN -

EXISTING BUILDING DRAWING AND ANALYSIS

-

Taipei Residential Type Analysis

Duplex Apartment 30%

Row House 20%

Super Luxury Housing 6%

Single House 7%

Community Housing 18%

Super Tiny Housing 18%

Comdominium 12%

Stack Villa 1%

DESCRIPTION

Row House and Duplex Apartment are the most number of Taipei residential building Type. These two types are usually 4 to 5 floor high and the oldest building in Taipei, which are about 20 to 30 years old and facing some following problems:

1. Top floor Leaking 2. Top floor is too hot 3. No Public Facility

Presently, most households live in flat-roofed row houses and duplex apartments, but due to a lack of space, people try to expand their living area by building on their roofs.

The illegal make-shift metal-roofed shelters that result are unregulated and

displeasing to the eye. Lastly, social housing projects have fallen to the wayside and do not adequately consider the needs of disadvantaged groups, social justice, and the problems of housing for those with low-income.

10

(11)

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-330

ST 2014/04/30 CD Submission

CC DN -

COMPETITION DWELLING

-

Extension Canopy Rooftop Garden

Steel Bar Window Extended Signboard

Small-Scale Street

11

(12)

CC DN

-

PAVILION EAST SIDE RENDERING

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-401

ST 2014/04/30 CD Submission

-

N

12

(13)

CC DN

-

PAVILION WEST SIDE RENDERING

- Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-402

ST 2014/04/30 CD Submission

N

13

(14)

DTU ROF CUJ

SHU REC KMU

PLT FNX ATC BAR OTP DEL LUC BUC ROM PAR

S1 S2

S3 UNI

ST DN 1:1000

La Cité du Soleil® PLAN

mm Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-001

ST 2014/04/30 CD Submission

14

(15)

LOT "S"

LOT "Q"

LOT "P"

EL ±0

EL +710

EL +430

EL +710

EL +398 EL ±0

8600 (5% SLOPE)1875

1650 200 1600 6075

10370 (<5% SLOPE) 6480

16006240 (5% SLOPE)8850

60151600

3900 2300 1600

1825

425

Makino bamboos

Makino bamboos EL ±0 Makino bamboos

425

Vanilla garden

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-002

ST 2014/04/30 CD Submission

CF - 1:100

SITE PLAN

mm

0 1 2 5 METER

15

(16)

Solar Envelope 20000

20000

5000 10000 5000

5000100005000

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-011

ST 2014/04/30 CD Submission

CF DN 1:100

SOLAR ENVELOPE

mm NORTH

SOUTH

EAST

0 1 2 5 METER

10000

7000

20000

10000

7000

20000

10000

7000

20000

10000

7000

20000

16

(17)

PhotovoltaicBESS Inverter&Battery Delta H=2000

Couch Piping Shaft Indoor

unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

ARCHITECTURE FOOTPRINT

146.6 m²

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-014

ST 2014/04/30 CD Submission

CF DN 1:100

ARCHITECTURE FOOTPRINT

mm

0 1 2 5 METER

17

(18)

MAXIMUM MEASURABLE AREA

56.92 m²

PhotovoltaicBESS Inverter&Battery Delta H=2000

Couch Piping Shaft Indoor

unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-017

ST 2014/04/30 CD Submission

CF DN 1:100

MEASURABLE AREA

mm

0 1 2 5 METER

18

(19)

MECH. RM.

BATHROOM

BEDROOM WORKSTATION

KITCHEN

TEA TERRACE

LIVING RM.

ENTRANCE

BESS Photovoltaic Inverter&Battery Delta H=2000

Couch Piping Shaft

Indoor unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

SEE AR-213

SEE AR-212

SEE AR-211

3600 1800 3600

A

A-3

A-4

B

C

D B-1

C-1

800169017102100210021002100

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-021

ST 2014/04/30 CD Submission

CF DN 1:100

GROUND LEVEL PLAN

mm

0 1 2 5 METER

19

(20)

OPEN TO BELOW LAUNDRY HANGING AREA

Evaporation Cooling Wall Exhaust Area Mezzanine

SEE AR-213

SEE AR-212

SEE AR-211 Rain Water Collection Surface

Kitchen Exhaust

OPEN TO BELOW

Air Hose / Refrigerant Pipe H=200

Cold Water Pipe / Hot Water Pipe / Electric Tube

3600 1800 3600

A

A-3

A-4

B

C

D B-1

C-1

800169017102100210021002100

Washing Machine Miele W 6641 H=900

Clothes Dryer BOSCH WTC82101TC H=842

Heat Pump ���� MK-150 H=540 HVAC ��� DAIKIN RXYMQPVET H=1345

Air Hose

Air Hose hot water tank (300L) Wind Pipe

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Wind Pipe

DN

CO2 Heat Pump Tank Panasonic HE-WU37CQ H=1843

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-022

ST 2014/04/30 CD Submission

CF DN 1:60

MEZZANINE LEVEL PLAN

mm

0 1 2 5 METER

20

(21)

SEE AR-213

SEE AR-212

SEE AR-211 Bayer Makrolon® Solid Sheet Bayer Makrolon® Polypropylene Hollow Sheet

Aluminum Louvers

Delta PV Panel

Aluminum Louvers Clear Glass

Solar Water Heater

3600 1800 3600

A

A-3

A-4

B

C

D B-1

C-1

800169017102100210021002100

Fan Exhaust

CF DN 1:60

ROOF LEVEL PLAN

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-031

ST 2014/04/30 CD Submission

mm

0 1 2 5 METER

21

(22)

Swing Door

Awning Window

Solar Envelope

335 3765 5975

10075

335 408

10075

89756082 15057

410639063751882

15057

Architecture Footprint

9332

410127351912

Sliding Door

Louvers

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-041

ST 2014/04/30 CD Submission

CF DN 1:100

RECONFIGURABLE FEATURES 1

mm Canopy 8.7 M2

Louvers:17.8 M2 Total:146.9 M2

0 1 2 5 METER

House

9.332x12.735+0.6375x0.7854x3.14=120.4 (M2) Canopy

5.975x0.41+(8.975-0.41)x0.408+6.375x0.335=8.0 (M2) Louvers

9.332x1.912=17.8 (M2) Total

120.41+8.05+17.84=146.3 (M2)

22

(23)

BESSPhotovoltaic Inverter&Battery Delta H=2000

Couch Piping Shaft

Indoor unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

Swing Door

Sliding Door

Louvers Awning Window

Washing Machine Miele W 6641 H=900

Clothes Dryer BOSCH WTC82101TC H=842

Heat Pump ���� MK-150 H=540 HVAC ��� DAIKIN RXYMQPVET H=1345

Air Hose

Air Hose hot water tank (300L) Wind Pipe

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Wind Pipe

DN

CO2 Heat Pump Tank Panasonic HE-WU37CQ H=1843

Louvers

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-042

ST 2014/04/30 CD Submission

CF DN 1:100

RECONFIGURABLE FEATURES 2

mm

0 1 2 5 METER

23

(24)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-043

ST 2014/04/30 CD Submission

CF DN N/A

RECONFIGURABLE FEATURES 3

Louvers N/A Sliding Door Swing Door Awning Window

24

(25)

Solar Envelope Solar Envelope

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-044

ST 2014/04/30 CD Submission

CH DN 1:40

RECONFIGURABLE FEATURES 4

mm

0 0.5 1 2 METER

25

(26)

PhotovoltaicBESS Inverter&Battery Delta H=2000

Couch Piping Shaft Indoor

unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

Entrance

Exit

Solar Envelope

LOT "S"

LOT "Q"

LOT "P"

EL ±0

EL +710

EL +430

EL +710

EL +398 EL ±0

8600 (5% SLOPE)1875

1650 200 1600 6075

10370 (<5% SLOPE) 6480

16006240 (5% SLOPE)8850

60151600

3900 2300 1600

1825

425

Makino bamboos

Makino bamboos EL ±0 Makino bamboos

425

Vanilla garden

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-051

ST 2014/04/30 CD Submission

CF DN 1:100

SITE ENTRANCE AND EXIT

mm

0 1 2 5 METER

26

(27)

EL ±0GL EL +7101st FL EL +1810Handrail

398312 710

398312 710

430

10370 6480

430280 710

EL ±0GL EL +7101st FL EL +1810Handrail

398312710

EL ±0GL EL +7101st FL EL +1810Handrail

710

8600 1875

EL ±0GL EL +7101st FL EL +1810Handrail

710398

1600 6240 8850

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-101

ST 2014/04/30 CD Submission

CF ST 1:60

SITE ELEVATION

North

mm South

East

0 1 2 5 METER

27

<5% Slope

5% Slope

5% Slope

(28)

2100 2100 2100 2100 1710 1690 800 12600

18°

72°

72° 53°

37°

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Bayer

Makrolon®

Polycarbonate Inter-Locking Hollow Sheet t=40mm

Canopy

Bayer

Makrolon®

Polycarbonate Hollow Sheet

t=10mm Exhaust Louver

Handrail

Footing

A A-3

A-4 B

B-1 C

C-1 D

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-111

ST 2014/04/30 CD Submission

CF DN 1:60

EAST ELEVATION

mm

0 1 2 5 METER

28

(29)

1 2

3 4

3600 1800 3600

9000

ENTRANCE

Louvers

Bayer

Makrolon® Polycarbonate Hollow Sheet

t= 16 mm

Bayer

Makrolon® Solid Sheet t= 10 mm

Bayer

Makrolon® Polycarbonat

e

Hollow Sheet

t= 16 mm

Swing Door

Bayer

Makrolon® Polycarbonat

e

Hollow Sheet

t= 10 mm

Canopy Canopy

Handrail

Footing

Sand Box

EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-112

ST 2014/04/30 CD Submission

CF DN 1:60

NORTH ELEVATION

mm

0 1 2 5 METER

29

(30)

1 2 3 4

3600 1800 3600

9000

PV Module Clear Glass

Solar Water Heater

Aluminum Louvers

Glass Louvers Canopy Canopy

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-113

ST 2014/04/30 CD Submission

CF DN 1:60

SOUTH ELEVATION

mm

0 1 2 5 METER

30

(31)

A A-3 A-4 B B-1 C C-1 D

800 1690 1710 2100 2100 2100 2100

12600

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Bayer

Makrolon®

Polycarbonate Inter-Locking Hollow Sheet t=40mm

Canopy

POLLI-Brick

™ (

Thermal Wall)

Bayer

Makrolon®

Polycarbonate Hollow Sheet

t=10mm

53° 72°

18°

72°

37°

Canopy

Handrail

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-114

ST 2014/04/30 CD Submission

CF DN 1:60

WEST ELEVATION

mm

0 1 2 5 METER

31

(32)

Fix

2100 2100 2100 2100 1710 1690 800

12600 SEE AR-212

SEE AR-211 SEE AR-213

A A-3

A-4 B

B-1 C

C-1 D

Louvers Water pan

PV Module Steel Beam Box 150x150 t=4.5

Wood floor Duct

Bayer Makrolon® Polycarbonate Hollow Sheet

t=10mm

Seat

Vacuum Insulation panel E-foam

Delta DC Fan VFB25AEHT

Bayer Makrolon® Polycarbonate Hollow Sheet

t=16mm Gutter Gutter

POLLI-Bricks™

( Thermal mass )

Footing

Glass Louvers

Bayer

Makrolon® Polycarbonate

Inter-Locking Hollow Sheet t=40mm

Wood Plastic Composites Steel Beam H 150x150

Aluminum Louvers

Evaporation Cooling Wall

Steel Beam C 150x75

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-201

ST 2014/04/30 CD Submission

CF DN 1:60

LONGITUDINAL SECTION 1

mm

0 1 2 5 METER

AR-3433 AR-3223

AR-3213

32

(33)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

2100 2100 2100 2100 1710 1690 800

12600

SEE AR-212

SEE AR-211 SEE AR-213

A A-3

A-4 B

B-1 C

C-1 D

Water pan

Evaporation Cooling Wall

PV Module Steel Beam Box 150x150x4.5

Plant Pots

Green core

Gutter Gutter

Canopy

Bayer Makrolon® Polycarbonate Solid Sheet

t=6mm

Wood Plastic Composites

Delta DC Fan VFB25AEHT

Bayer Makrolon® Polycarbonate Hollow Sheet

t=16mm

Glass Louvers

Steel Beam I 150x150 t=4.5

Aluminum Louvers

Glass Louvers

Steel Beam Box 150x150 t=4.5 Aluminum Louvers

Wood floor Vacuum Insulation panel E foam

Duct

Footing

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-202

ST 2014/04/30 CD Submission

CF DN 1:60

LONGITUDINAL SECTION 2

mm

0 1 2 5 METER

33

(34)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

2100 2100 2100 2100

12600 1710

1690 800

SEE AR-212 SEE AR-211

SEE AR-213

A A-3 A-4 B B-1 C C-1 D

Glass Louvers Water pan

PV Module

Steel Beam Box 150x150 t=4.5

Wood Plastic Composites

Steel Beam C 150x75

Bayer Makrolon® Polycarbonate

Wood floor

Hollow Sheet

t=10mm

Vacuum Insulation panel

E-foam Delta DC Fan VFB25AEHT

Bayer Makrolon® Polycarbonate Hollow Sheet

t=16mm

Gutter

Gutter

Canopy

Footing

Bayer Makrolon

®Polycarbonate

Inter-Locking Hollow Sheet t=40mm

Aluminum Louvers Evaporation Cooling Wall Duct

Steel Beam C 150x75

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-203

ST 2014/04/30 CD Submission

CF DN 1:60

LONGITUDINAL SECTION 3

mm

0 1 2 5 METER

AR-3213

34

(35)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

3600 1800 3600

9000

SEE AR-202 SEE AR-203

SEE AR-201

1 2 3 4

Water pan

Footing

PV Module

Canopy

Bayer Makrolon

®Polycarbonate

Inter-Locking Hollow Sheet t=40mm

Clear Glass

Solar Water Heater

Bed Work Station

Living Room

AC

Bedroom POLLI-Bricks

(Thermal mass)

Gutter

Gutter

Kitchen

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-211

ST 2014/04/30 CD Submission

CF DN 1:60

TRANSVERSAL SECTIONS 1

mm

0 1 2 5 METER

AR-3423

AR-3512

35

(36)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

3600 1800 3600

9000

SEE AR-202 SEE AR-203

SEE AR-201

Green core

Kitchen Tea Terrace

Bayer Makrolon® Polycarbonate Solid Sheet

t=6mm

Bayer Makrolon

®Polycarbonate

Inter-Locking Hollow Sheet t=40mm

Gutter PV Module

Canopy

Footing

Bayer Makrolon

®Polycarbonate

Hollow Sheet

t=10mm

Bayer Makrolon

®Polycarbonate

Hollow Sheet

t=10mm

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-212

ST 2014/04/30 CD Submission

CF DN 1:60

TRANSVERSAL SECTIONS 2

mm

0 1 2 5 METER

AR-3522

AR-3512

36

(37)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

SEE AR-202 SEE AR-203

SEE AR-201

1 2 3 4

1410

3600 1800 3600

9000

Canopy

Bayer Makrolon® Polycarbonate Hollow Sheet

t=10mm

Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm

Gutter PV Module

Greencore

Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm

Gutter

Bayer Makrolon

® Polycarbonate Solid Sheet

t=6mm

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-213

ST 2014/04/30 CD Submission

CF DN 1:60

TRANSVERSAL SECTIONS 3

mm

0 1 2 5 METER

AR-3413

AR-3512 AR-3522

37

(38)

BESSPhotovoltaic Inverter&Battery Delta H=2000

Couch Piping Shaft

Indoor unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

WIN 2

WIN 3

WIN 5

WIN 6 WIN 4

WIN 7 WIN 8

WIN 10

WIN11

WIN12 WIN13

WIN 9

40504050

3450 1650

3450

1950500 19501950

1650 2300

6001170

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-301

ST 2014/04/30 CD Submission

CF DN 1:60

WINDOW SCHEDULE AND DETAILS 1

mm

0 1 2 5 METER

38

(39)

MO=12000

8400

25 25

40 25 40

H=2400

MO=2470 45 a=1100

10mm

40

25

40 40 40 25 40 40

W=4000 W=4000

150

40 25 40

10mm

40

10mm 10mm 10mm

W=3400

150 150

40

10mm 25

150

W=4000

150 25

25 150

MO=8400 W=4000

150

25

90°

MO=4050 25

MO=4025 25

25 MO=3450

25

MO=4050 MO=4050

3600

25

MO=3450150 25

150MO=3600 W=3400

150

55

INTERIOR EXTERIOR

SEMI-EXTERIOR EXTERIOR

1F Beam

WIN 1

WIN 2 WIN 3

WIN 1 WIN 2 WIN 3

AR-307 14

10mm 10mm 10mm 10mm 10mm 10mm 10mm

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-302

ST 2014/04/30 CD Submission

CF DN 1:40

WINDOW SCHEDULE AND DETAILS 2

mm

0 0.5 1 2 METER

39

參考文獻

相關文件

Valor acrescentado bruto : Receitas do jogo e dos serviços relacionados menos compras de bens e serviços para venda, menos comissões pagas menos despesas de ofertas a clientes

• Extension risk is due to the slowdown of prepayments when interest rates climb, making the investor earn the security’s lower coupon rate rather than the market’s higher rate..

了⼀一個方案,用以尋找滿足 Calabi 方程的空 間,這些空間現在通稱為 Calabi-Yau 空間。.

substance) is matter that has distinct properties and a composition that does not vary from sample

• When a system undergoes any chemical or physical change, the accompanying change in internal energy, ΔE, is the sum of the heat added to or liberated from the system, q, and the

Courtesy: Ned Wright’s Cosmology Page Burles, Nolette &amp; Turner, 1999?. Total Mass Density

專案執 行團隊

Pursuant to the service agreement made between the Permanent Secretary for Education Incorporated (“Grantor”) and the Grantee in respect of each approved programme funded by the