• 沒有找到結果。

6. Conclusion and Future Research

6.3 Future Research

There are still many important applications of nD modeling special for construction management. In the future, nD modelling will be considered for practical use and research on a jobsite. Over the past few years, there has been a great deal of studies on the application of nD modelling. However, most of these ideas have not actually been put to use on a jobsite. Usually, there are extra consideration and approaches when the application of nD modeling at the jobsite. Future research of the ConBIM-SKM prototype will explore interface design and develop extra system functions if ConBIM-SKM prototype is to be utilized on a jobsite. These advances aim to ultimately lead to the system’s more comprehensive practical use in A/E/C applications. Accordingly, the development and implementation of ConBIM-SKM prototype for the whole project in schedule and knowledge management will come to next development in the ConBIM-SKM prototype if it is customized for the characteristics of different construction activities.

72

REFERENCES

Arayici, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K., (2011).

Technology adoption in the BIM implementation for lean architectural practice.

Automation in Construction, 20(2), 189-195.

Azhar, S. (2011). Building Information Modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241-252.

Azimi, R., Lee, S.H., AbouRizk, S.M., Alvanchi, A. (2011). A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Automation in Construction, 20(1), 88-97.

Barlish, K., & Sullivan, K. (2012). How to measure the benefits of BIM - A case study approach. Automation in Construction, 24, 149-159.

Becerik-Gerber, B., & Rice, S. (2010). The perceived value of building information modeling in the US building industry, Journal of Information Technology in Construction (ITcon), 15, 185-201.

Bergmann, R. (2002). Experience management: Foundations, Development Methodology, and Internet-Based Applications. Berlin, Germany: Springer.

BIMForum. (2013). Level of Development Specification. (Last accessed October 2013).

Retrieved from http://bimforum.org/wp-content/uploads/2013/08/2013-LOD-Specification.pdf.

Bosche, F., Haas, C.T., & Murray, P. (2008). Performance of automated project progress tracking with 3D data fusion. Proc. of CSCE Annual Conference, 10-13 June, 2008, Quebec, QC, Canada. 10p.

73

Bosche, F., Teizer, J., Haas, C.T., & Caldas, C.H. (2006). Integrating data from 3D CAD and 3D cameras for real-time modeling. Joint International Conference on Computing and Decision Making in Civil and Building Engineering, June, 2006, Montreal, QC, Canada. 9 p.

Bryde, D., Broquetas, M., & Volm, J.M. (2013). The project benefits of Building Information Modelling (BIM). International Journal of Project Management, 31(7), 971-980.

Buildipedia Company. (2013). The Daily Life of Building Information Modeling (BIM) (Last accessed May 2013). Retrieved from http://buildipedia.com/aec-pros/design-news/the-daily-life-of-building-information-modeling-bim.

Bynum, P., Issa, R., & Olbina, S. (2012). Building Information Modeling in Support of Sustainable Design and Construction. Journal of Construction Engineering and Management, 139(1), 24-34.

Chau, K., Anson, M., & Zhang, J. (2004). Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), 598-606.

Chavada, R., Dawood, N., & Kassem, M. (2012). Construction workspace management:

the development and application of a novel nD planning approach and tool.

Construction Innovation, 17, 213-236.

Chen, S.M., Griffis, F.H., Chen, P.H., & Chang, L.M. (2013). A framework for an automated and integrated project scheduling and management system. Automation in Construction, 35, 89-110.

74

Chen, J.H., Hsu, S.C., Luo, Y.H., & Skibniewski, M.J. (2012). Knowledge Management for Risk Hedging by Construction Material Suppliers. Journal of Management in Engineering, 28(3), 8-26.

Chen, L., & Mohamed, S. (2010). The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(2), 138-163.

Chen, Y.H., Tsai, M.H., Kang, S.C., & Liu, C.W. (2013). Selection and evaluation of color sheme for 4D construction models. Journal of Information Technology in Construction (ITcon), 18, 1-19.

Davenport, T.H., & Probst, G.J.B. (2002). Knowledge management case book: Siemens best practices. New York, USA: John Wiley & Sons.

Davenport, T.H., & Prusak, L. (1998). Working Knowledge. New York, NY, USA:

Harvard Business School Press.

Davidson, I., & Skibniewski, M. (1995). Simulation of Automated Data Collection in Buildings. Journal of Computing in Civil Engineering, 9(1), 9-20.

Davies, R., & Harty, C. (2013). Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project. Automation in Construction, 30, 15-24.

Dossick, C. S., & Neff, G. (2010). Organizational Divisions in BIM-Enabled Commercial Construction. Journal of Construction Engineering and Management, 136(4), 459-467.

Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: a guide to building information modeling for owners, managers, designers, engineers and contractors. 2nd ed. New Jersey: John Wiley and Sons, Inc.

Elbeltagi, E., & Dawood, M. (2011). Integrated visualized time control system for repetitive construction projects. Automation in Construction, 20(7), 940-953.

75

El-Diraby, T.E., & Kashif, K.F. (2005). Distribute Ontology Architecture for Knowledge Management in Highway Construction. Journal of Construction Engineering and Management, 131(5), 591-603.

El-Omari, S., & Moselhi, O. (2008). Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. Automation in Construction, 18(1), 1-9.

El-Omari, S., & Moselhi, O. (2009). Data acquisition from construction sites for tracking purposes. Engineering, Construction and Architectural Management, 16(5), 490-503.

Epstein, E. (2012). Implementing Successful Building Information Modeling. Norwood, MA, USA: Artech House.

Forcada, N., Fuertes, A., Gangolells, M., Casals, M., & Macarulla, M. (2013). Knowledge management perceptions in construction and design companies. Automation in Construction, 29, 83-91.

Fu, C., Aouad, G., Lee, A., Mashall-Ponting, A., & Wu, S. (2006). IFC model viewer to support nD model application. Automation in Construction, 15, 178-185.

Goedert, J.D., & Meadati, A.G.F. (2008). Integrating Construction Process Documentation into Building Information Modeling. Journal of Construction Engineering and Management, 134(7), 509-516.

Gu, N., & London, K. (2010). Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction, 19(8), 988-999.

Gurevich, U., & Sacks, R. (2014). Examination of the effects of a KanBIM production control system on subcontractors' task selections in interior works. Automation in Construction, 37, 81-87.

76

Hardin, B. (2009). BIM and construction management: proven tools, methods, and workflows. NJ: John Wiley and Sons, Inc.

Hart, A. (1992). Knowledge Acquisition for Expert Systems. 2nd ed. New York: McGraw-Hill.

Hartmann, T., & Fischer, M. (2007). Supporting the constructability review with 3D/4D models. Building Research & Information, 35(1), 70-80.

Hartmann, T., Meerveld, H.V., Vossebeld, N., & Adriaanse, A. (2012). Aligning building information model tools and construction management methods. Automation in Construction, 22, 605-613.

Hassanain, M.A., Froese, T.M., & Vanier, D.J. (2001). Development of a maintenance management model based on IAI standards. Artificial Intelligence in Engineering, 15, 177-193.

Heesom, D., & Mahdjoubi, L. (2004). Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), 171-182.

Hegazy, T., & Abdel-Monem, M. (2012). Email-based system for documenting construction as-built details. Automation in Construction, 24, 130-137.

Hu, Z., & Zhang, J. (2011). BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2.

Development and site trials. Automation in Construction, 20(2), 167-180.

Irizarry, J., Karan, E.P., & Jalaei, F. (2013). Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Automation in Construction, 31, 241-254.

Jung, Y., & Joo, M. (2011). Building information modelling (BIM) framework for practical implementation. Automation in Construction, 20(2), 126-133.

77

Kang, L.S., Kim, S.K., Moon, H.S., & Kim, H.S. (2013). Development of a 4D object-based system for visualizing the risk information of construction projects.

Automation in Construction, 31, 186-203.

Kim, H., Anderson, K., Lee, S.H., & Hildreth, J. (2013). Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology. Automation in Construction, 35, 285-295.

Kim, C., Kim, B., & Kim, H. (2013). 4D CAD model updating using image processing-based construction progress monitoring. Automation in Construction, 35, 44-52.

Kim, C., Kim, H., Park, T., & Kim, M. (2011). Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project. Journal of Computing in Civil Engineering, 25(1), 98-107.

Kim, C., Son, H., & Kim, C. (2013). Automated construction progress measurement using a 4D building information model and 3D data. Automation in Construction, 31, 75-82.

Kim, K., & Teizer, J. (2014). Automatic design and planning of scaffolding systems using building information modeling. Advanced Engineering Informatics, 28(1), 66-80.

Kivrak, S., Arslan, G., Dikmen, I., & Birgonul, M. (2008). Capturing Knowledge in Construction Projects: Knowledge Platform for Contractors. Journal of Management in Engineering, 24(2), 87-95.

Leite, F., Akcamete, A., Akinci, B, & Atasoy, G. (2011). Analysis of modeling effort and impact of different levels of detail in building information models. Automation in Construction, 34, 25-36.

78

Li, H., Chan, K. Y., & Skitmore, M. (2012). The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), 429-446.

Liston, K.M., Fischer, M., & Kunz, J. (1998). 4D annotator: a visual decision support tool for construction planners, computing in civil engineering. Proc. of International Computing Congress, 18-21 October, 1998, Boston, USA, 330-341.

Lu, W., Huang, G.Q., & Li, H. (2011). Scenarios for applying RFID technology in construction project management. Automation in Construction, 20(2), 136-143.

Ma, Z., Shen, Q., & Zhang, J. (2005). Application of 4D for dynamic site layout and management of construction projects. Automation in Construction, 14(3), 369-381.

Manning, R., & Messner, J. (2008). Case studies in BIM implementation for programming of healthcare facilities. Journal of Information Technology in Construction (ITcon), 13, 446–457.

Martins, J.P., & Monteiro, A. (2013). LicA: A BIM based automated code-checking application for water distribution systems. Automation in Construction, 29, 12-23.

Matta, C., & Kam, C. (2010). The GSA'sBIM Pilot Program, presentation by GSA PBS Office of the Chief Architect (Last accessed 21 March, 2010). Retrieved from http://bim.arch.gatech.edu/data/reference/gsaBIM.pdf 20058.

Moon, H.S., Dawood, N., & Kang, L.S. (2014). Development of workspace conflict visualization system using 4D object of work schedule. Advanced Engineering Informatics, 28(1), 50-65.

Moon, H.S., Kim, H.S., Kim, C.H., & Kang, L.S. (2014). Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces. Automation in Construction, 39, 93-105.

79

Motawa, I., & Almarshad, A. (2013). A knowledge-based BIM system for building maintenance. Automation in Construction, 29, 173-182.

Navon, R. (2007). Research in automated measurement of project performance indicators.

Automation in Construction, 16(2), 176-188.

Park, C.S., Lee, D.Y., Kwon, O.S., & Wang, X. (2013). A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Automation in Construction, 33, 61-71.

Porwal, A., & Hewage, K.N. (2013). Building Information Modeling (BIM) partnering framework for public construction projects. Automation in Construction, 31, 204-214.

Redmond, A., Hore, A., Alshawi, M., & West, R. (2012). Exploring how information exchanges can be enhanced through Cloud BIM. Automation in Construction, 24, 175-183.

Ren, Y., Skibniewski, M.J., & Jiang, S. (2012). Building information modeling integrated with electronic commerce material procurement and supplier performance management system. Journal of Civil Engineering and Management, 18(5), 642-654.

Reuss, M.C., & Tatum, C.B. (1993). Requirements and Tools for Transferring Construction Experience between Projects. Tech. Rep. no.78, Stanford, CA, USA:

Center for Integrated Facility Engineering, Stanford University.

Ribeiro, F.L. (2009). Enhancing knowledge management in construction firms.

Construction Innovation, 9(3), 268-284.

Russell, A., Staub-French, S., Tran, N., & Wong, W. (2009). Visualizing high-rise building construction strategies using linear scheduling and 4D CAD. Automation in Construction, 18(2), 219-236.

80

Shahi, A., West, J.S., & Haas, C.T. (2013). Onsite 3D marking for construction activity tracking. Automation in Construction, 30, 136-143.

Shen, W., Shen, Q.W., & Sun, Q. (2012). Building Information Modeling-based user activity simulation and evaluation method for improving designer–user communications. Automation in Construction, 21, 148-160.

Shen, W., Zhang, X., Shen, G.Q. & Fernando, T. (2013). The User Pre-Occupancy Evaluation Method in designer–client communication in early design stage: A case study. Automation in Construction, 32, 112-124.

Shen, Z., & Issa, R. (2010). Quantitative evaluation of the BIM assisted construction detailed cost estimates. Journal of Information Technology in Construction (ITcon), 15, 234-257.

Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18(3), 357–375.

Succar, B. (2013). An integrated approach to BIM competency assessment, acquisition and application. Automation in Construction, 35, 174-189.

Tang, P., Huber, D., Akinci, B., Lipman, R., & Lytle, A. (2010). Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques. Automation in Construction, 19(7), 829-843.

Taylor, J.E., & Bernstein, P.G. (2009). Paradigm Trajectories of Building Information Modeling Practice in Project Networks. Journal of Management in Engineering, 25(2), 69-76.

Teicholz, P. (2013). BIM for Facility Managers. New York, NY, USA: John Wiley &

Sons, Inc.

81

Tiwana, A. (2000). The knowledge Management Toolkit – practical techniques for building a knowledge management system. Upper Saddle River, NJ, USA: Prentice-Hall.

Trupp, T., Soibelman, L., Hashash, T.M.A., & Liu, L.Y. (2004). Novel technologies for construction field data collection. Proc. of the 10th International Conference on Computing in Civil and Building Engineering (ICCCBE), 2004, Weimar, Germany.

9 p.

Tsai, M.H., Kang, S.C., & Hsieh, S.H. (2010). A three-stage framework for introducing a 4D tool in large consulting firms. Advanced Engineering Informatics, 24, 476-489.

Tse, T.K., Wong, K.A., & Wong, K.F. (2005). The utilisation of building information models in nD modelling: A study of data interfacing and adoption barriers. Journal of Information Technology in Construction (ITcon), 10, 85-110.

Turkan, Y., Bosche, F., Haas, C.T., & Haas, R. (2012). Automated progress tracking using 4D schedule and 3D sensing technologies. Automation in Construction, 22, 414-421.

Underwood, J., & Isikdag, U. (2010). Handbook of research on building information modeling and construction informatics: concepts and technologies. IGI Global.

Vanlande, R., Nicolle, C., & Cruz, C. (2008). IFC and building lifecycle management.

Automation in Construction, 18(1), 70-78.

Wang, Y., Wang, X., Wang, J., Yung, P., & Jun, G. (2013). Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study. Advances in Civil Engineering, 2013, Article ID 189105, 8 pages.

82

Wang, W.C., Weng, S.W., Wang, S.H., & Chen, C.Y. (2014). Integrating building information models with construction process simulations for project scheduling support. Automation in Construction, 37, 68-80.

Wang, H.J., Zhang, J.P., Chau, K.W., & Anson, M. (2004). 4D dynamic management for construction planning and resource utilization. Automation in Construction, 13(5), 575-589.

Wix, J., & Liebich, T. (1998). Industry foundation classes: some business question examined. Proc. of 2nd ECPPM conference, 19-21 October, 1998, Watford, UK.

Wong, A.D., Wong, F.W., & Nadeem, A. (2010). Attributes of Building Information Modelling Implementations in Various Countries. Architectural Engineering and Design Management, 6(4), 288-302.

Xiong, X., Adan, A., Akinci, B., & Huber, D. (2013). Automatic creation of semantically rich 3D building models from laser scanner data. Automation in Construction, 31, 325-337.

Zhang, J.P., Hu, Z.Z. (2011). BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1.

Principles and methodologies. Automation in Construction, 20(2), 155-166.

Zhang, S., Teizer, J., Lee, J.K., Eastman, C.M., & Venugopal, M. (2013). Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules. Automation in Construction, 29, 183-195.

Zhang, J., Yu, F., Li, D. & Hu, Z. (2014). Development and Implementation of an Industry Foundation Classes-Based Graphic Information Model for Virtual Construction. Computer-Aided Civil and Infrastructure Engineering, 29, 60-74.

83

Zhou, Y., Ding, L.Y., & Chen, L.J. (2013). Application of 4D visualization technology for safety management in metro construction. Automation in Construction, 34, 25-36.

相關文件