Route planning for two wafer fabs with
capacity-sharing mechanisms
Muh-Cherng Wu a , Chen-Fu Chen a & Chang-Fu Shih a a
Department of Industrial Engineering and Management , National Chiao Tung University , Hsin-Chu, Taiwan, ROC
Published online: 24 Jul 2009.
To cite this article: Muh-Cherng Wu , Chen-Fu Chen & Chang-Fu Shih (2009) Route planning for two
wafer fabs with capacity-sharing mechanisms, International Journal of Production Research, 47:20, 5843-5856, DOI: 10.1080/00207540802172029
To link to this article: http://dx.doi.org/10.1080/00207540802172029
PLEASE SCROLL DOWN FOR ARTICLE
Taylor & Francis makes every effort to ensure the accuracy of all the information (the “Content”) contained in the publications on our platform. However, Taylor & Francis, our agents, and our licensors make no representations or warranties whatsoever as to the accuracy, completeness, or suitability for any purpose of the Content. Any opinions and views expressed in this publication are the opinions and views of the authors, and are not the views of or endorsed by Taylor & Francis. The accuracy of the Content should not be relied upon and should be independently verified with primary sources of information. Taylor and Francis shall not be liable for any losses, actions, claims, proceedings, demands, costs, expenses, damages, and other liabilities whatsoever or howsoever caused arising directly or indirectly in connection with, in relation to or arising out of the use of the Content.
This article may be used for research, teaching, and private study purposes. Any substantial or systematic reproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in any form to anyone is expressly forbidden. Terms & Conditions of access and use can be found at http://www.tandfonline.com/page/terms-and-conditions
Vol. 47, No. 20, 15 October 2009, 5843–5856
Route planning for two wafer fabs with capacity-sharing mechanisms
Muh-Cherng Wu*, Chen-Fu Chen and Chang-Fu ShihDepartment of Industrial Engineering and Management, National Chiao Tung University, Hsin-Chu, Taiwan, ROC
(Received 20 July 2007; final version received 18 December 2007)
This paper formulates and solves a route planning problem for semiconductor manufacturing. In order to quickly respond to rising demand, a semiconductor company usually adopts a dual-fab strategy to expand capacity. That is, two fab sites are built as neighbours and can easily share capacity. Through the capacity-sharing design, a product may be produced by a cross-fab route. That is, some operations of a product are carried out in one fab and the other operations in the other fab. This leads to a routing planning problem, which involves two decisions – determining the cut-off point of the cross-fab route and the route ratio for each product – in order to maximise the throughput subject to a cycle time constraint. An LP-GA method is proposed to solve the route planning problem. We first use the LP module to make the cut-off point decisions, and proceed to use the GA module for making the decision on the route ratio. Experimental results show that the LP-GA method significantly outperforms other methods. Keywords: operations management; operations strategy; operations planning
1. Introduction
The semiconductor manufacturing industry has to consider the following three factors when expanding capacity. The equipment costs are very expensive, perhaps costing over one billion dollars for a 12 inch wafer fab. The lead time for equipment acquisition is quite long, ranging from 3 to 9 months. However, building the factory space is relatively inexpensive, but with a much longer lead time – taking about one to two years.
In order to respond quickly to rising demand, a semiconductor company usually adopts a dual-fab strategy to expand capacity. That is, a large-scale factory space that can accommodate two fabs is established in advance. Then, the equipment for the two fabs is gradually moved into the space over time according to market demand. The two fabs, close to each other in location, support each other and should be managed in an integrated manner.
In such a dual-fab configuration, a relatively easy way to manage is to manufacture each wafer job in one fab. That is, each fab is run separately, without any mutual support in capacity. Such a separated-operation paradigm usually leads to an underutilisation of equipment. To remedy the underutilisation issue, a cross-fab production paradigm is proposed. This means that a wafer job is partly manufactured in one fab and partly manufactured in the other fab.
*Corresponding author. Email: [email protected]
ISSN 0020–7543 print/ISSN 1366–588X online ß 2009 Taylor & Francis
DOI: 10.1080/00207540802172029 http://www.informaworld.com
Such a cross-fab production paradigm yields a route planning problem – how to appropriately assign the operations of a wafer job to each of the two fabs. Only a few studies on the route planning problem have been published. Toba et al. (2005) addressed the route planning problem in a real-time manner. That is, whenever an operation of a job is completed, a decision – which fab to use to manufacture the next operation – must be made immediately. Wu and Chang (2007) investigated the route planning problem in a short-term or weekly manner, in which the two fabs exchange capacity weekly to maximise the total throughput.
Although having established significant milestones, these two studies have some limitations due to their implicit assumption. They both assume that the transportation times within a fab or among fabs are constant. This implies that the transportation capacity is infinite, and the route planning algorithm may yield a solution with too much transportation. This may lead to traffic jams and, as a result, may lower the throughput and lengthen the cycle time.
In semiconductor manufacturing, the wafer size has steadily increased over time. In a modern fab (12 inch wafer fab), wafer jobs must be transported by automatic vehicles because a wafer job weighs about 30 kg and cannot be handled manually. This may yield a traffic jam problem because the transportation capacity is limited. Our interview with practitioners indicates that the traffic jam symptom occurs particularly with a dual-fab layout. Therefore, the transportation capacity has to be considered in the route planning problem for a modern fab.
This research investigates the route planning problem for a dual-fab layout and is unique in two ways. First, we assume that the transportation capacity is finite and the transportation times vary. Second, the route planning decision is made based on a relatively longer time horizon, for example one or several months. This research, focusing on a relatively long-term decision, complements prior studies which focused on either short-term or mid-term decisions on route planning.
The remainder of the paper is organized as follows. Section 2 reviews the literature relevant to this research. Section 3 presents the route planning problem in detail. Section 4 describes the solution framework, including a linear programming (LP) model, a binary search algorithm, a queuing network model, and a genetic algorithm (GA). Section 5 describes the LP model and the binary search algorithm. Section 6 describes the queueing model and the GA. Numerical experiments are presented in Section 7 and the concluding remarks are in the final section.
2. Relevant literature
Given customer demand, more than one manufacturing site may exist to fulfill that demand. The decision problem is how to allocate the demand to each manufacturing site. This capacity allocation problem can be addressed either at the product level or the operation level.
For the problem at the product level, each site is designated to manufacture a set of products. This implies that a product should be completely manufactured within a single site – cross-site production is prohibited. At the operation level, each site is designated to carry out a group of operations. Then, the operations for manufacturing a product can be distributed among different sites – cross-site production is allowed. This leads to the need to study the route-planning problem.
For the capacity allocation problem – without any cross-site routes, Wu et al. (2005) have given a comprehensive survey. Some recent studies are listed (Rupp and Ristic 2000, Frederix 2001, Karabuk and Wu 2003, Manmohan 2005, Lee et al. 2006, Chiang et al. 2007). Linear programming models are commonly used to solve the problems. To address the interactions among manufacturing sites, game theory was proposed to enhance the LP model (Mieghem 1999).
For the capacity allocation problem – with some cross-site routes, most studies have addressed the problem in the context of group technology (GT). That is, each site is a manufacturing cell and multiple cells form a factory. Cross-cell production for manufacturing a product is permitted. However, each product is preferably manufactured within a particular cell and cross-cell production should be minimised.
Most prior studies allocated the capacity demand to cells by solving a cell formation problem (Avonts and Wassenhove 1988, Kim et al. 2005, Vin et al. 2005, Dimopoulos 2006, Mahdavi et al. 2006, Nsakanda et al. 2006, Spiliopoulos and Sofianopoulou 2007). That is, in order to minimise the number of cross-cell transportations, researchers have to answer the question: how many cells should be formed and how should each cell be equipped? After the cell formation problem has been solved, each product is assigned to a particular cell for handling most of its operations. The remaining operations, much fewer in number, are handled by other cells. A GT cell is designed for manufacturing a particular group of products, and by nature is limited in its functional capacity. Therefore, cross-cell routes are unavoidably demanded in GT in order to enhance its functional spectrum.
However, in the route-planning problem addressed here, each of the two fabs is assumed to be functionally comprehensive. That is, a product can be completely manufactured in either one of the two fabs. The purpose of cross-fab production is to increase the total throughput of the two fabs, with the rationale explained below.
In practice, a semiconductor fab is equipped to fulfill the demand of a particular product mix, which is generally obtained from the demand forecast at the time of purchasing the equipment. However, the market demand in terms of product mix may change over time. Therefore, a fab may be underutilised due to a change of product mix. In addition, the two fabs, even if both functionally comprehensive, may differ in the number of each type of machine. This implies that their originally designed product mixes may also differ. Cross-fab production is therefore needed to increase the total throughput of the two fabs.
3. Problem statement
This section describes the dual-fab route planning problem more precisely. We first present the assumptions that confine the context of the route planning problem, and then proceed to introduce the decision variables, objective function and constraints of the problem. In explaining the assumptions, the two fabs are respectively called Fab_A and Fab_B. Assumption 1: Each fab is functionally comprehensive. Each of the two fabs is so comprehensively equipped that it can handle the manufacture of each product by itself – not requiring the functional support of the other fab.
Assumption 2: A product has four possible routes. To implement cross-fab production, the manufacturing route of a product is split into two parts, where the route’s break point is called the cut-off point. The two parts can be manufactured in different fabs, and yield
two possible routes for cross-fab production. One, represented by ! , denotes that the first part of the route is manufactured at Fab_A and the second part at Fab_B. The other part, represented by ! , denotes that the first part of the route is at Fab_B and the second part at Fab_A. Since each fab is functionally comprehensive, a product thus has four possible manufacturing routes, , , ! , and ! , where denotes the route at Fab_Aonly and denotes the route at Fab_B only.
Assumption 3: The transportation path between any two workstations/buffers is unique, rather than multiple. In each fab, a transportation system for moving wafer jobs has been established. Theoretically, there may exist multiple paths to transport a wafer job from one workstation to another; however, to reduce the complexity of traffic control, we predefine a fixed path for such transport.
The route planning problem has two decision variables for each product: its cut-off pointand the ratios of its four possible routes (simply called route ratios). Let the cut-off point and route ratios of product i be represented by ð i, riÞ. Here, i denotes the identification code (an integer) of the operation for separating a route into two parts, and ri¼ ½ai, bi, ci, diis a four-element vector where each element denotes the percentage of a
particular route – of the four routes , , ! , and ! . Define ¼ [1, . . . , n] as a set of cut-off points and R ¼ r½ 1, . . . , rnas a set of route ratios for n products to be produced.
The route planning problem is to determine a (*, R*) in order to maximise the total throughput of the two fabs, subject to the constraint of meeting a target cycle time.
4. Solution framework
The framework proposed for solving the dual-fab route planning problem is shown in Figure 1, and involves two modules. In Module 1, each transportation path is assumed to be equipped with infinite capacity, and the transportation time between any two workstations/buffers is zero. With the routing problem so simplified, we attempt to find an optimum , in terms of minimising the total number of inter-fab transportations. The problem is solved by an iterative use of a linear program (LP) model. For a particular , the LP model computes the minimum number of inter-fab transportations, which is regarded as the performance of . We then use a binary search algorithm to identify an optimum * as the ultimate decision for the cut-off point.
In Module 2, with the obtained * taken as parameters, we deal only with the decision variables R ¼ r½ 1, . . . , rn. In this module, each transportation path is taken as a tool with
limited capacity. The transportation time required to pass along a path can be varied,
Module 1
Module 2
Linear program (LP)
Genetic algorithm (GA)
Queueing network Cutoff Point (Π)
Route Ratio (R)
Figure 1. Solution framework.
depending upon the traffic flow intensity. The higher the traffic intensity, the longer the cycle time.
Module 2 involves two sub-modules. The first develops a performance evaluator for a particular (, R). To do so, we first construct a queueing network model (Connors et al. 1996) in order to compute the resulting mean cycle time, subject to a target throughput and a particular (, R). The queueing model is further enhanced as follows. Subject to a target mean cycle time and a particular (, R), the enhanced model can compute the resulting throughput – the performance of (, R).
With * having been obtained in Module 1, the second sub-module of Module 2 searches for an R* so that the performance (*, R*) is the best. A genetic algorithm is proposed to solve the search problem – finding the ultimate decision for R.
In summary, the solution space of the dual-fab route planning problem can be described by S ¼ {(, R*) j 2 _ Set, R 2 R_ Set}. The objective is to find an optimum (*, R*) from S, in terms of maximising the throughput subject to a target cycle time. Since the number of elements in S can be very large, the problem is decomposed into two sub-problems. The first is to find an optimum *, and the second proceeds to find an optimum R* by taking * as predefined parameters.
The essence of these two modules is compared below. Module 1 essentially deals with a static capacity allocation problem that does not consider the job flow time. In contrast, Module 2 deals with a time-phased capacity allocation problem, in which the job flow time is addressed and computed by a queueing network model.
Without addressing the job flow time, Module 1 need not consider the transportation times of the jobs. This leads to the underlying assumption of Module 1 – the transportation time between any two workstations/buffers is zero. When the underlying assumption is released, we have to consider the job flow time in Module 1. Solving such a problem is very computationally expensive because it may need an iterative evaluation of a linear program embodied within a discrete event simulation program, as proposed by Hung and Leachman (1996).
5. Module 1: LP model and search algorithm
The solution for Module 1 is obtained by an iterative use of an LP program. We first describe the LP model and then present the iterative method – a bi-section search algorithm.
Indices
i product index
g workstation index in Fab_A h workstation index in Fab_B Parameters
n total number of products
i cut-off point for defining the cross-fab routes of product i
¼ [i], 1 i n, a vector for describing the cut-off points of all products
Q estimated total throughput of the two fabs when in high utilization (in lots), which is used as the target throughput in the LP model Pi percentage of product i in the product mix,
Pn
i¼1Pi¼1, 0 Pi1
Cg available machine hours of workstation g in Fab_A Ch available machine hours of workstation h in Fab_B ma total number of workstations in Fab_A
mb total number of workstations in Fab_B Wa
ig total processing time per lot required on workstation g in Fab_A, when
product i is manufactured by route Wc
ig total processing time per lot required on workstation g in Fab_A, when
product i is manufactured by route ! Wd
ig total processing time per lot required on workstation g in Fab_A, when
product i is manufactured by route ! Wb
ih total processing time per lot required on workstation h in Fab_B, when
product i is manufactured by route
Wcih total processing time per lot required on workstation h in Fab_B, when product i is manufactured by route !
Wd
ih total processing time per lot required on workstation h in Fab_B, when
product i is manufactured by route ! Decision variables
ai percentage use of route in producing product i bi percentage use of route in producing product i ci percentage use of route ! in producing product i di percentage use of route ! in producing product i
5.1 The LP model
The LP program computes a minimum number of cross-fab transportations for a particular – a decision for the route cut-off points, which is known before solving the LP problem. The objective function of the LP program is denoted by Z():
Min ZðÞ ¼X n i¼1 Q Pi ðciþdiÞ, s. t. aiþbiþciþdi¼1, 1 i n, ð1Þ Xn i¼1 Q Pi ðaiWaigþdiWdigþciWcigÞ Cg, 1 g ma, ð2Þ Xn i¼1 Q Pi ðbiWbihþdiWdihþciWcihÞ Ch, 1 h mb: ð3Þ
The objective function is to minimise the number of cross-fab production lots. The rationale for defining this objective is that cross-fab production requires a longer transportation time than within-fab production. Subject to a target cycle time, an attempt to minimise cross-fab production lots tends to increase the total throughput. Constraint (1) describes the dependent relationship among the route ratios. Constraints (2) and (3)
ensure that the capacity used in each workstation, for Fab_A and Fab_B, is less than its available supply.
5.2 Bi-section search algorithm
The bi-section search algorithm finds an optimum solution * from a space, denoted by {}, which is the possible combinations of cut-off points for all products. The algorithm is an iterative process. In an iteration, each product has only two possible cut-off points to select. Taking a product route as a line, the two cut-off points are, respectively, in the first and the third quartiles (Figure 2). By evenly cutting the route into two segments, each cut-off point is in the middle of a particular segment. Of the two evenly divided segments, the one where a cut-off point remains is called the housing-segment of the point.
In each iteration i, the size of the space {} is 2nif there are n products. By solving the LP program in an exhaustive manner (i.e. 2ntimes), we can obtain the best solution in this iteration – denoted
i, which defines the optimum set of cut-off points. For each product,
the housing-segment of the cut-off point obtained is called the -segment (i.e. the remaining segment) of the product, which is the output of iteration i and will be the input of iteration i þ1. The bi-section search algorithm is summarised below.
Algorithm: Search_Cut-off_Points Initialisation
. For each product, take the whole route as its -segment. For i ¼ 1 to N
. Create the two cut-off points on the -segment for each product . Solve LP programs in an exhaustive manner to find
i
. Compute the -segment for each product based on i
End for
Output the cut-off points for each product.
6. Module 2 – queueing and GA
The problem to be solved in Module 2 can be stated as follows. Given a target cycle time (CT0) and a cut-off point decision (*) obtained from Module 1, we attempt to find an
Iteration 1 Iteration 2 Iteration 3
Iteration n
Figure 2. Process for obtaining the cut-off point.
optimal route ratio decision R ¼ r½ 1, . . . , rnin order to maximise the total throughput of
the two fabs subject to the fact that the corresponding average cycle time is less than CT0. This problem is essentially a space search problem, with solution space H ¼ fRg ¼ f r½ 1, . . . , rnjri¼ ðai, bi, ci, diÞg. A genetic algorithm is proposed to solve the
problem. In the algorithm, the fitness (performance) of a solution R is evaluated by a queueing network model. We first introduce the queueing network model and proceed to the genetic algorithm.
6.1 Queueing network
The queueing network model is an extension of the model developed by Connors et al. (1996), the I/O function of which can be briefly formulated as follows: CT ¼ f(TH, R, ). That is, given a target total throughput (TH), a route ratio decision (R), and a cut-off point decision (), the queueing model (f) can be used to compute the two fabs’ mean cycle time (CT). However, Connors et al. (1996) did not consider the effect of transportation among workstations.
We extend the application of their model based on two assumptions. First, we assume that the transportation path between any two stations is unique, where a station is either a workstation or a WIP storage buffer. Secondly, each transportation path between any two stations is modeled as a ‘conveyor machine’ with only one unit of capacity. Such an extension makes the developed queueing model closer to a semiconductor fab in the real world. Likewise, the I/O function of the extended queuing model can also be described as CT ¼ f(TH, R, ).
The objective function in Module 2 is to maximise the throughput (TH) subject to a target cycle time (CT0). To evaluate the objective function, we used a bi-section search technique to find the total throughput (TH) for a particular route ratio (R); that is, TH ¼ f(R, *, CT0)TH ¼ f(R, *,CT0), where * denotes the cut-off point decision obtained in Module 1 and CT0is the target cycle time. Note that, for the function CT ¼ f(TH, R, *), the larger the TH value, then the larger the CT value. The bi-section search technique, based on CT ¼ f(TH, R, *), searches for a value for TH so that CT ¼ CT0. The bi-section search algorithm is just like that for the binary search for a particular point on a line segment.
6.2 Genetic algorithm
The genetic algorithm (GA) identifies an optimal solution R* from the space {R}. As stated, the performance of R is obtained from the enhanced queueing model. A possible solution R (called a chromosome) is represented by a vector R ¼ r½ 1, . . . , rn, where
ri¼ ðai, bi, ci, diÞ. We call ria gene-segment and each of its elements a gene, and the gene
values are by the constraints aiþbiþciþdi¼1 and 0 ai, bi, ci, di1. The GA is an iterative algorithm and can be briefly described as follows. Procedure GA
Step 1: Initialisation
. t ¼ 0, Status ¼ ‘Not-terminate’
. Randomly generate Npvalid chromosomes to form a population P0.
Step 2: Genetic Search
While (Status ¼ ‘Not-Terminate’) do
. Use cross-over operator to create Ncnew chromosomes . Use mutation operator to create Nm new chromosomes
. Form a pool by taking the union of Ptand the set of newly created chromosomes . t ¼ t þ 1, and select the best Npchromosomes from the pool to form Pt
. Check if termination condition is met; if yes, set Status ¼ ‘Terminate’ Endwhile
Step 3: Step 3: Output the best chromosome R* in Pt
The crossover operation creates two new chromosomes (say R3 and R4) from two existing ones (say R1 and R2). Let each gene-segment i in R1 and R2 be represented, respectively, by ri1 and ri2. We propose a one-point crossover operation (Binh and
Lan 2007) on gene-segments ri1 and ri2 to create two new ones ri3 and ri4, which in turn
could yield two new chromosomes R3¼½ri3and R4¼½ri4, 1 i n.
The one-point crossover operation on a gene-segment is briefly introduced. For two gene-segments (i.e. ri1 and ri2), we randomly choose a gene, swap their gene values,
and modify the other gene value in order to ensure constraint compliance. Consider an example where the second gene is chosen as the cross-over point for mixing ri1¼ ðai1, bi1, ci1, di1Þ and ri2 ¼ ðai2, bi2, ci2, di2Þ. By the swap and modification
operations, we would obtain ri3¼ ðai1, bi2, ci1, 1 ai1bi2ci1Þ and ri4¼ ðai2, bi1, ci2,
1 ai2bi1ci2Þ.
In the mutation operation, a new chromosome (say R2) is created by an existing chromosome (say R1). The mutation algorithm creates R2 by modifying a particular gene-segment of R1. The modified gene-segment is chosen randomly. While being selected, two of its genes are randomly chosen and their gene values are swapped. For example, if gene-segment i* is chosen for modification, and the second and fourth genes are chosen to swap for ri1 ¼ ðai1, bi1, ci1, di1Þ, then ri2¼ ðai1, di1, ci1, bi1Þ, which in turn yields a new
chromosome R2¼½r11, . . . , ri2, . . . , rn1from R1¼½r11, . . . , ri1, . . . , rn1.
Two termination conditions are defined for the GA. First, the best solution in Ptis no change for a certain period (say Tbiterations). Second, population Pthas evolved over a certain number of iterations, that is t has reached its predefined upper bound (Tu).
7. Experiments
7.1 Benchmarks and data
Using numeric experiments, we attempt to evaluate the effectiveness of the proposed method. Two other methods are used as benchmarks for comparison. The proposed method is designated LP-GA, where LP denotes the linear program and GA denotes the genetic algorithm. The two benchmark methods are special cases of LP-GA. The first is called M-GA, which denotes that the cut-off point of each route has been predetermined – in the middle of the route. The second is called N-GA, which denotes that cross-fab production is not allowed. Such a comparison tells us how much benefit a dual-fab would obtain if the LP-GA method was used.
In the dual-fab experiments, the data for machines and product routes are adapted from an HP-fab from the literature (Wein 1988). Of the two fabs, one involves 93 machines
and the other 72 machines. Being functionally identical, each fab involves four batch workstations and 21 series workstations. The MTBF (mean time between failure) and MTTR (mean time to repair) of each machine is available, exponentially distributed. Three types of products are produced. One product involves 150 operations and the other two both involve 172 operations, but are different in processing times. In implementing the GA, we set Tb¼1000, Tu¼30, P0¼100, Pcr¼0.8, and Pm¼0.1.
7.2 Performance comparison
The three methods are compared in two scenarios, with product mixes RA¼(3 : 2 : 5) and RB¼(5 : 4 : 1). For each product mix, from the queueing model we obtain a throughput level that will keep the two fabs in high utilisation: QA¼128 lots and QB¼169 lots.
We compare the three methods from two perspectives. First, given a target throughput level, the mean cycle time of each method is compared. In the comparison, QAand QBare used as the target throughput levels. Second, given a target cycle time, we compare the throughput of each method. In the comparison, we set CT0¼11,081 min for RA and CT0¼11,445 min for RB.
The cut-off points of each route obtained by the LP-GA method are shown in Table 1, which indicates that the cut-off points suggested by the LP-GA are different from that of M-GA.
Table 2 shows a comparison of the mean cycle times, subject to a target throughput. The LP-GA outperforms the two benchmark methods. Using the result of LP-GA as a baseline, the cycle time of the LP-GA method is about 10% better than that of M-GA, and about 12–20% better than that of N-GA. This implies that managing a dual-fab by adopting an optimum cross-fab production policy tends to shorten the cycle time – significantly better than managing each fab independently (i.e. no cross-fab production). Table 3 shows a comparison of the throughput, subject to a target cycle time. The LP-GA method also outperforms the two benchmark methods. Using the results for
Table 2. A comparison of the mean cycle times of different algorithms.
RA(QA¼128 lots) RB(QB¼169 lots)
Algorithm CT (min) Gap (%) CT (min) Gap (%)
LP-GA 11,080 0 11,639 0
M-GA 12,175 9.88 12,811 10.06
N-GA 12,463 12.48 14,075 20.9
Table 1. Cut-off points obtained by the LP-GA program.
Product 1 Product 2 Product 3
Total number of steps: 172 172 150
RA 85th step 85th step 129th step
RB 84th step 84th step 78th step
the LP-GA as a baseline, the throughput of the LP-GA method is about 2.3% higher than that of M-GA, and about 3.1–4.7% higher than that of N-GA. This implies that optimal planning of cross-fab production produces an increasing throughput.
Figures 3 and 4 reveal the relationship between cycle time and throughput for product mixes RA and RB, respectively. The higher the throughput, the longer the cycle time. The two figures also show that the higher the throughput, the larger the performance gap. That is, the contribution of the LP-GA method becomes greater when it is applied in a high-market-demand scenario. 7500 80 100 120 140 160 162 166 8500 9500 10,500 11,500 12,500 13,500 14,500 Throughput (RB) Cycle time LP-GA M-GA N-GA
Figure 4. Relationship between throughput and cycle time for product mix RB.
8000 8500 9000 9500 10,000 10,500 11,000 11,500 12,000 12,500 70 80 90 100 110 120 123 124 125 128 Throughput (RA) Cycle time LP-GA M-GA N-GA
Figure 3. Relationship between throughput and cycle time for product mix RA.
Table 3. A comparison of the computing times for the throughput of different algorithms.
RA(CT0¼11,081 min) RB(CT0¼11,445 min)
Algorithm Throughput (lots) Gap (%) Throughput (lots) Gap (%)
LP-GA 128 0 169 0
M-GA 125 2.34 165 2.37
N-GA 124 3.12 161 4.73
7.3 Complexity analysis
The computation times required by each module in the LP-GA method are shown in Table 4. The table indicates that the computation requirement of Module 2 is much greater than that of Module 1. Each of the two modules essentially deals with a space-search problem – attempting to find an optimal solution from a solution space. Module 1 adopts an analytic approach (a linear program), whereas Module 2 adopts a meta-heuristic approach (GA). A complexity analysis for Module 1 is therefore carried out below.
In Module 1, the iterative use of the linear program is based on a binary-search method. For a scenario with n products and each product involving 2x15 m 2x operations, the number of linear programs we have to perform is N ¼ x 2n. For scenarios with n ¼ 3 and m ¼ 172, we need to perform the linear program about 8 23¼64 times, which computationally takes only about 4 s. The computation time will increase significantly if n is greatly increased.
To deal with scenarios with large n, future work in this direction is required. We need to develop a product clustering module. Of the n products, only a limited number (say c) are considered for cross-fab production, the remaining n–c products only being eligible for single-fab production.
8. Conclusion
This paper presents an approach to solving the route planning problem for a semiconductor dual-fab. In the problem, each product can be manufactured in either fab. Each product has four possible production routes, which are defined by a cut-off point. The route planning problem involves two decisions – determining the cut-off point and the route ratio for each product – in order to maximise the throughput subject to a cycle time constraint.
An LP-GA method is proposed to solve the route planning problem. We first use the LP module to make the cut-off point decisions, and proceed to use the GA module for making the decision concerning the route ratio. The LP-GA method is compared with two benchmark methods by numerical experiments. Results show that the LP-GA method significantly outperforms the other methods.
Extensions of this research are being considered. The first is the extension of this approach to a multiple-fab production system – for example, three or more fabs sharing production capacity. The second is the extension to a scenario with greater flexibility in production routes – for example, each product could have two or more cut-off points and in turn have more than four routes. The third extension as stated above is the examination of scenarios with a large number of products.
Table 4. Computation times required by each module in the LP-GA method.
Route ratio Module 1 (s) Module 2 (s)
RA 3.5 95.578
RB 4.2 103.265
Acknowledgement
This research was supported financially by the National Science Council, Taiwan, under contract NSC-96-2628-E-009-026-MY3.
References
Avonts, L.H. and Wassenhove, L.N.V., 1988. The part mix and routing mix problem in FMS: a coupling between an LP model and a closed queueing network. International Journal of Production Research, 26 (12), 1891–1902.
Binh, Q.D. and Lan, P.N., 2007. Application of a genetic algorithm to the fuel reload optimization for a research reactor. Applied Mathematics and Computation, 187, 977–988.
Chiang, D., et al., 2007. Optimal supply chain configurations in semiconductor manufacturing. International Journal of Production Research, 45 (3), 631–651.
Connors, D.P., Feigin, G.E., and Yao, D.D., 1996. A queueing network model for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 9 (3), 412–427. Defersha, F.M. and Chen, M., 2006. Machine cell formation using a mathematical model and a
genetic-algorithm-based heuristic. International Journal of Production Research, 44 (12), 2421–2444.
Dimopoulos, C., 2006. Multi-objective optimization of manufacturing cell design. International Journal of Production Research, 44 (22), 4855–4875.
Frederix, F., 2001. An extended enterprise planning methodology for the discrete manufacturing industry. European Journal of Operational Research, 129, 317–325.
Hung, Y.F. and Leachman, R.C., 1996. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transaction on Semiconductor Manufacturing, 9 (2), 257–269.
Karabuk, S. and Wu, S.D., 2003. Coordinating strategic capacity planning in the semiconductor industry. Operations Research, 51, 839–849.
Kim, C.O., Beak, J.G., and Jun, J., 2005. A machine cell formation algorithm for simultaneously minimizing machine workload imbalances and inter-cell part movements. International Journal of Advanced Manufacture Technology, 26, 268–275.
Lee, Y.H., et al., 2006. Supply chain model for the semiconductor industry in consideration of manufacturing characteristics. Production Planning and Control, 17 (5), 518–533.
Mahdavi, I., et al., 2006. A set partitioning based heuristic procedure for incremental cell formation with routing flexibility. International Journal of Production Research, 44 (24), 5343–5361.
ManMohan, S.S., 2005. Managing demand risk in tactical supply chain planning for a global consumer electronics company. Production and Operations Management, 14 (1), 69–79. Mieghem, J.A., 1999. Coordinating investment, production, and subcontracting. Management
Science, 45 (7), 954–971.
Nsakanda, A.L., Diaby, M., and Price, W.L., 2006. Hybrid genetic approach for solving large-scale capacitated cell formation problems with multiple routings. European Journal of Operational Research, 171, 1051–1070.
Rupp, T.M. and Ristic, M., 2000. Fine planning for supply chains in semiconductor manufacture. Journal of Materials Processing Technology, 107, 390–397.
Spiliopoulos, K. and Sofianopoulou, S., 2007. Manufacturing cell design with alternative routings in generalized group technology: reducing the complexity of the solution space. International Journal of Production Research, 45 (6), 1355–1367.
Toba, H., et al., 2005. Dynamic load balancing among multiple fabrication lines through estimation of minimum inter-operation time. IEEE Transactions on Semiconductor Manufacturing, 18 (1), 202–213.
Vin, E., Lit, P.D., and Delchambre, A., 2005. A multiple-objective grouping genetic algorithm for the cell formation problem with alternative routings. Journal of Intelligent Manufacturing, 16, 189–209.
Wein, L.M., 1988. Scheduling semiconductor wafer fabrication. IEEE Transactions on Semiconductor Manufacturing, 1 (3), 115–130.
Wu, M.C. and Chang, W.J., 2007. A short-term capacity trading method for semiconductor fabs with partnership. Expert Systems with Application, 33 (2), 476–483.
Wu, S.D., Erkoc, M., and Karabuk, S., 2005. Managing capacity in the high-tech industry: a review of literature. The Engineering Economist, 50, 125–158.