• 沒有找到結果。

A VIKOR technique based on DEMATEL and ANP for information security risk control assessment

N/A
N/A
Protected

Academic year: 2021

Share "A VIKOR technique based on DEMATEL and ANP for information security risk control assessment"

Copied!
19
0
0

加載中.... (立即查看全文)

全文

Loading

數據

Fig. 1. Risk management process model (Source: [1]).
Fig. 2. The relation between the research framework and risk-management process model.
Fig. 4. The structure of subgoals for the empirical case.
Table 11 shows that the risk of operational/technical subgoals is higher than the risk of the subgoal organizational/man- organizational/man-agement
+4

參考文獻

相關文件

The indicators for assessment of child learning experiences evaluate children’s learning performance from the curriculum perspective, while the indicators for the Domain of

Based on “The Performance Indicators for Hong Kong Schools – Evidence of Performance” published in 2002, a suggested list of expected evidence of performance is drawn up for

The ECA Co-ordinator should design an evaluation and appraisal system for the proper assessment of various activities, school clubs, staff and student performance.. This

Creating and assessing performance-based curriculum project: A teacher's guide to project-based learning and performance assessment.. Edmonds, WA:

• The Tolerable Upper Intake level (UL) is the highest nutrient intake value that is likely to pose no risk of adverse health effects for individuals in a given age and gender

Microphone and 600 ohm line conduits shall be mechanically and electrically connected to receptacle boxes and electrically grounded to the audio system ground point.. Lines in

It is based on the goals of senior secondary education and on other official documents related to the curriculum and assessment reform since 2000, including

• To achieve small expected risk, that is good generalization performance ⇒ both the empirical risk and the ratio between VC dimension and the number of data points have to be small..