• 沒有找到結果。

三、學術著作表列 

N/A
N/A
Protected

Academic year: 2022

Share "三、學術著作表列 "

Copied!
27
0
0

加載中.... (立即查看全文)

全文

(1)

三、學術著作表列

 SCI/EI 等級期刊論文

 國內中文期刊論文

 國際英文研討會論文

 學術研討會論文

 專書

 申請專利

 技術報告

LIST OF PUBLICATIONS 【已發表之學術文章目錄】

International Journal Papers【SCI/EI 等級期刊論文】:

1. 余文德、邱垂德、鄭紹材、張欽智、吳誌銘、林楨中,「應用建築資訊模型 於鋼筋混凝土建築工地施工開口自動防墜安全檢查之研究」,中國土木水利 工程學刊,第二十八卷,第一期,第 331-343 頁,2016。(EI)

2. Chang, P. L and Yu, W. D., “Developing a General Model for Construction Problem Solving for an Engineering Consulting Firm,” KSCE Journal of Civil Engineering, 30 pp., 2016. (SCI/EI) (Online 2016/02, IF=0.484, Rank=82%) 3. 林鼎鈞、余文德、吳誌銘,「台灣營建產業智慧資本要素與經營績效關聯之

研究」,中國土木水利工程學刊,第二十七卷,第一期,第 23-36 頁,2015。

(EI)

4. Cheng, Y. S., Yu, W. D., and Li, C. M. “GA-based multi-level association rule mining approach for defect analysis in construction industry,” Automation in Construction, 51(3), pp.78-91, 2015. (SCI/EI, IF=1.82, Rank=15.3%)

5. Yang, J.B., Yu, W.D., Tseng, J.C.R., Chang, C.S., Chang, P.L., and Wu, J.W.

“Benefit Analysis of Knowledge Management System for Engineering Consulting Firms.” Journal of Management in Engineering, ASCE, Vol. 30, No.

4, pp. 05014005-1~8, 2014. (SCI, IF=0.720, Rank=38.7%)

6. 王國武、余文德、王明德,「收益/成本分析模式於廠商競標策略分析之應 用」,中國土木水利工程學刊,第二十六卷,第一期,第 81~94 頁,2014。

(EI)

7. 王國武、余文德,「異質採購圖形分析模式之研究」,技術學刊,第二十九卷,

第一期,第 1~15 頁,2014。(EI)

8. Yu, W. D., Lin, T. C., Liu, S. J. and Chang, P. L. “Is the Knowledge Management System Truly Cost Effective? Case Study of KM-Enabled Engineering Problem Solving.” Journal of Construction Engineering and Management, ASCE, Vol.

(2)

139, No. 2, pp. 216-224, 2013. (SCI/EI, IF=0.876, Rank=45.5%)

9. 温兆寶、蕭汎儀、王世旭、王維志、余文德,「半導體裝機配管工程之成本 估價模式」,中國土木水利工程學刊,第二十五卷,第四期,第 241~249 頁,

2013。(EI)

10. Yu, W.D., Wu, C. M., Cheng, S. T., and Chen, T. S., “Enhanced Function Modeling for Early Assessment of Conceptual Innovative Construction Technologies.” Automation in Construction, Vol. 36, pp. 180-190, 2013. (SCI/EI, IF=1.82, Rank=15.3%) (NSC 101-2221-E-216 -031 -MY2)

11. 吳誌銘、余文德、鄭紹材,「營建技術創新方案產生模式之研究」中國土木 水利工程學刊,第 25 卷,第 2 期,第 123-136 頁,2013。(EI)

12. 吳誌銘,余文德,鄭紹材,賴以軒,林楨中,「以專利為基礎之墜落防制技 術定位與研發策略分析」,中國土木水利工程學刊,第 25 卷,第 1 期,第 89-99 頁,2013。(EI)

13. Yu, W. D., Wang, K. W., and Wang, M. T. “Pricing Strategy for Best Value Tender.” Journal of Construction Engineering and Management, ASCE, Vol. 139, No. 6, pp. 675–684, 2013. (SCI/EI, IF=0.876, Rank=45.5%)

14. Yu, W.D. and Hsu, J.Y., “Content-based Text Mining Technique for Retrieval of CAD Documents.” Automation in Construction, Vol. 31, Jan. 2013, pp. 65-74, 2013. (SCI/EI, IF=1.82, Rank=15.3%)

15. 張佩倫,余文德,李順敏,「基於經驗學習之營建問題解決模式」,中國土木 水利工程學刊,第 24 卷,第 4 期,pp. 415-428,2012。(EI)

16. 鄭紹材、吳誌銘、田慶誠、余文德、陳建忠、雷明遠,「智慧型探測技術於 建築防火之應用與發展」,建築學報,第 82 期,第 43-57 頁,2012。(TSSCI) 17. Hsiao, F. Y., Wang, S. S., Wang, W. C., Wen, C. P., and Yu, W. D., “Neuro-Fuzzy

Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction,” Computer-Aided Civil and Infrastructure Engineering, Vol. 21, No. 10, pp. 764–781, 2012. (SCI, IF=4.46, Rank=0.08%) 18. Wang, W. C., Yu, W. D., Yang, I. T., and Lin, C. C., “Applying AHP to support

the best-value contractor selection– lessons learned from two case studies in Taiwan,” Journal of Civil Engineering and Management, Vol. 19, No. 1, pp.

24-36, 2012. (SCI, IF=2.016, Rank=9.8%)

19. 吳誌銘、鄭紹材、余文德、林楨中,「建築工程電梯直井內材料運送作業防 墜護欄之改良」,技術學刊,第 27 卷,第 3 期,第 109-119 頁,2012。(EI) 20. Yu, W.D., Cheng, S.T., Wu, C.M. and Lou, H.R., “A Self-Evolutionary Model

for Automated Innovation of Construction Technologies.” Automation in Construction, Vol. 27, Nov. 2012, pp. 78-88, 2012. (SCI/EI, IF=1.82, Rank=13.9%) (NSC 99-2221-E-216-041-MY2)

(3)

21. Wu, J.W., Tseng, Judy C. R., Yu, W.D., Yang, J. B., Lee, S. M., and Tsai, W. N.,

“An Integrated Proactive Knowledge Management Model for Enhancing Engineering Services.” Automation in Construction, Vol. 24, No. 1, pp. 81-88, 2012. (SCI/EI, IF=1.82, Rank=13.9%)

22. Yu, W. D. and, Wang, K. W. “Best Value or Lowest Bid? A Quantitative Elasticity Perspective.” Journal of Construction Engineering and Management, Vol. 138, No. 1, pp. 128-134, 2011. (SCI/EI, IF=0.676, Rank 33.9%)

23. Wang, K. W. and Yu, W. D., “Model for Analysis of Heterogeneity in Product Acquisition Procurement,” Journal of the Chinese Institute of Engineers, Chinese Institute of Engineers, Vol. 34, No. 7, pp. 877-887, 2011. (SCI, IF=0.225, Rank 81.1%)

24. 王國武、余文德,「工程異質採購分析模式」,中國土木水利工程學刊,第二 十三卷,第一期,pp. 77-91,2011 年。(EI)

25. Yu, W. D., Yang, J. B., Tseng, J. C. R., Liu, S. J., and Wu, J. W. “Proactive Problem Solver for Construction,” Automation in Construction, Vol. 19, No. 6, pp. 808-816, 2010. (SCI/EI, IF=1.454, Rank 15.1%) (NSC 97-2221-E-216 -039) 26. Yu, W. D. and Skibniewski, M. J., “Integrating Neuro-Fuzzy System with

Conceptual Cost Estimation to Discover Cost-Related Knowledge from Residential Construction Projects,” Journal of Computing in Civil Engineering, ASCE, Vol. 24, No. 1, pp. 35-44, 2010. (SC/EI, IF=0.900, Rank 35.6%) (NSC 94-2211-E-216 -024)

27. 姚宣合、余文德、楊智斌、曾秋蓉、劉沈榮、張佩倫,「營建知識社群知識 加值績效量化評估模式之研究」,中國土木水利工程學刊,第 22 卷,第 1 期,pp.365-379,2010。(EI) (NSC 96-2221-E-216 -054)

28. Yu, W. D., Chang, P.L., Yao, H. H., and Liu, S.J. “KVAM: Model for Measuring Knowledge Management Performance of Engineering Community of Practice,”

Construction Management and Economics, Vol. 27, No. 8, pp. 733-747, 2009.

(EI) (NSC 96-2221-E-216 -054)

29. Yu, W. D. and Lo, S. S., “Patent Analysis-based Fuzzy Inference System for Technological Strategy Planning,” Automation in Construction, Vol. 18, No. 5, pp. 770-776, 2009. (SCI/EI, IF= 1.372, Rank 16.3%)

30. Yu, W. D., “Closure to ‘Hybrid Soft Computing approach for knowledge discovery in construction’ by Wen-der Yu,” Journal of Computing in Civil Engineering, ASCE, Vol. 23, No. 2, pp. 137-138, 2009. (SCI/EI, IF=1.102, Rank 33.0%) (NSC 94-2211-E-216 -024)

31. Lin, C. C., Wang, W. C., and Yu, W. D., “Improving Multiple Criteria Decision-Making in Construction via an Adaptive AHP Approach (A3),”

Automation in Construction, Vol. 17, No. 2, pp. 180-187, 2008. (SCI, EI,

(4)

IF=1.664, Rank 7.6%)

32. Yu, W. D., “Hybrid Soft Computing approach for knowledge discovery in construction,” Journal of Computing in Civil Engineering, ASCE, v21, n5 pp.

343-352, 2007. (SCI, EI, IF=1.351) (NSC 93-2211-E-216 -012)

33. Yu, W. D., “PIREM: a new model for conceptual cost estimation,” Construction Management and Economics, v24, n3, pp. 259-270, 2006. (EI)

34. Yu, W. D., and Liu, Y. C., “Hybridization of CBR and numeric soft computing techniques for mining of scarce construction databases,” Automation in Construction, Vol. 15, No. 1, pp. 20-32, 2006. (SCI, EI, IF=1.454) (NSC 93-2211-E-216 -012)

35. Yu, W. D., and Lin, H. W., “A VaFALCON neuro fuzzy system for mining of incomplete construction databases,” Automation in Construction, Vol. 15, No. 1, pp. 33-46, 2006. (SCI, EI, IF=1.454) (NSC 93-2211-E-216 -012)

36. Yu, W. D., Lai, C. C., and Lee, W. L., “A WICE Approach to Real-time Construction Cost Estimation,” Automation in Construction, Vol. 15, No. 1, pp.

12-19, 2006. (SCI, EI, IF=1.454)

37. Yu, W. D., and Lo, S. S., “Time-dependent construction social costs model,”

Construction Management and Economics, Vol. 23, No. 3, pp. 327-337, 2005.

(EI) (NSC 89-2211-E-216 -009)

38. 余文德、楊智斌,「公路工程工期與成本關係之探討」,中國土木水利工程學 刊,第十七卷,第三期,pp. 559-566,2005。(EI)

39. 余文德、楊智斌,「E 化課程對營建工程教育之效益分析」,技術學刊,第十 八卷,第四期,pp. 451~459,2003。

40. Yu, W. D., and Skibniewski, M. J., “A neuro-fuzzy computational approach to constructability knowledge acquisition for construction technology evaluation,”

Automation in Construction, Vol. 8, No. 5, pp. 539-552, 1999. (SCI, EI, IF=1.454)

41. Yu, W. D., and Skibniewski, M. J., “Quantitative constructability analysis with a neuro-fuzzy knowledge-based multi-criterion decision support system,”

Automation in Construction, Vol. 8, No. 5, pp. 553-565, 1999. (SCI, EI, IF=1.454)

42. Lin, D. J., Yu, W. D., and Wu, C. M. “Correlation between Intellectual Capital and Business Performance of Construction Industry—an Empirical Study in Taiwan,” Journal of Management in Engineering, ASCE, 22 pp., 2015. (SCI) (已 投稿,審查中)

43. 薛振興、余文德,「中小型建築投資專案初步獲利性評估指標之研究」,中國

(5)

土木水利工程學刊,2015。(EI) (已投稿,審查中)

44. 余文德、鄭紹材、莊憶、張育晧,「營建專案永續性評估指標之研究」,已投 稿 中 國 土 木 水 利 工 程 學 刊 , 2015/08 。 (EI) ( 已 投 稿 , 審 查 中 )( MOST 103-2621-M-216 -004)

45.

Chinese Journal Papers【國內中文期刊論文】:

1. 劉福勳、余文德、鄭景鴻、姜克維,「國內營建業推行 ISO 國際標準認證之 現況」,八十七年三月,營建管理季刊,第 34 期,7~13 頁,1998。

2. 余文德,「如何實施『施工性改善計畫』」,營造天下,第 34 期,第 29~36 頁,1998。

3. 劉福勳、余文德,「品保認證是條必走之路」,八十八年三月,現代營建,第 231 期,第 26~29 頁,1999。

4. 劉福勳、許玉明、余文德,「建築設計管理之鑰」,八十八年三月,營建知訊,

第 194 期,第 45~49 頁,1999。

5. 丁永聖、余文德,「價值工程分析於營建工程上之應用─以高層辦公大樓空 調系統為例」,八十八年十月,中國冷凍空調雜誌,第 46 期,第 120~127 頁,1999。

6. 余文德,「施工性改善之研究」,營建管理季刊,第 41 期,八十八年十二月,

第 43~58 頁,1999。

7. 余文德、劉福勳、李文義、葉珮娟,「營造廠空氣污染防治措施自主檢查之 探討(上)」,八十九年十月,營造天下,第 56 期,第 23~28 頁,2000。

8. 余文德、劉福勳、李文義、葉珮娟,「營造廠空氣污染防治措施自主檢查之 探討(下)」,八十九年十一月,營造天下,第 57 期,第 34~38 頁,2000。

9. 余文德、范振成,「公共工程業主最有利排程之探討」,九十年三月,營建管 理季刊,第 46 期,第 50~59 頁,2001。

10. 余文德、紀明伸,「台灣營造業運用 ISO 系統實施施工性改善之探討—以台 塑麥寮六輕專案工程為例」,九十年三月,土木水利,第 27 卷,第 4 期,第 70~80 頁,2001。

11. 郭慎賢、李文義、余文德,「自主檢查改善建築工程空氣污染防治措施之實 證研究」,九十年十一月,環境工程會刊,第 12 卷,第 4 期,第 62~71 頁,

2001。

12. 余文德、羅紹松,「道路工程民眾抗爭造成社會成本損失之初步探討」,九十 年十二月,營建管理季刊,第 49 期,第 9~14 頁,2001。

13. 余文德、陳盛隆,「公共工程採最有利標決標作業流程之探討」,九十年十二 月,營建管理季刊,第 49 期,第 66~70 頁,2001。

14. 余文德,「營建工程與管理研究趨勢分析—1997~2001」,九十一年三月,營

(6)

建管理季刊,第 50 期,第 1~7 頁,2002。

15. 余文德、邱威仁,「公共工程統包最有利標專案管理案例探討—南投縣政中 心統包工程之經驗」,九十二年八月,營建管理季刊,第 55 期,第 15~26 頁,2003。

16. 余文德、楊智斌、賴建中、鄭正光,「類神經模糊系統於工程成本概估及分 析之應用— 以鋼筋混凝土公路橋梁為例」,土木水利,第 31 卷,第 1 期,

pp. 74~77,2004。

17. 王菊楚、余文德、辛銀松,「PCM 執行統包公共工程績效評估指標之建構」,

中華技術期刊,第 61 期,pp. 1-30,2004。

18. 余文德、楊智斌,「鋼筋混凝土公路橋梁工程成本概估系統」,亞太工程學報,

第二卷,第二期,pp. 85-102,2004。

19. 王菊楚、何純平、余文德,「公共建築工程專案設計進度管理模式之比較」,

中華技術期刊,第 62 期,pp. 1-13,2004。

20. 余文德、宋玲,「專案整合管理之探討」,現代營建,第 24 卷,第 300 期,

pp. 53-65,2004。

21. 余文德、張正瑩、羅紹松,「施工社會成本量化分析模式(COSCO)於道路鋪 面工程之實證分析」,建築與規劃學報,第五卷,第二期,pp. 104~131,2004。

22. 余文德、羅紹松,「營建社會成本量化分析模式」,中華建築學刊,第一卷,

第一期,pp. 37~48,2005。

23. 余文德、陳盛隆、吳繼熊,「公共工程採最有利標評選營造廠商作業之探討」, 營建管理季刊,第 62 期,第 7~17 頁,2005。(該論文獲得營建管理學會 95 年度最佳研究論文獎)

24. 黃沛璿、鄭紹材、余文德,「國內不動產證券化商品投資風險之研究」,中華 建築學刊,第二卷,第一期,pp. 35~43,2005。

25. 余文德、蔡宜靜,「資料包絡分析法應用於評估知識管理效率之初步探討」,

中華技術期刊,第 70 期,pp. 80-85,2006。

26. 余文德,「國際專案管理認證對國內土木工程管理之衝擊與因應」,九十五年 八月,土木水利,第 33 卷,第 4 期,第 8~10 頁,2006。

27. 余文德,「台灣營建專案管理之現況與展望」,九十六年三月,台灣專案管理,

創刊號,pp. 24~33,2007。

28. 余文德、許玉明、張圳銘,「系統施工性模式」,九十六年三月,營建管理季 刊,第 70 期,pp. 8~24,2007。

29. 余文德、楊智斌、鄭紹材,「2007 IPMA 營建專案管理最佳實務案例介紹」,

九十六年十二月,台灣專案管理,第二期,pp. 52~57,2007。

30. 余文德,「營建企業智能之研究與應用」,九十七年一月,土木水利,第 35 卷,第 1 期,第 1~6 頁,2008。

31. 余文德、劉彥慶,「混合數值式與案例式推理方法於營建工程知識發掘之比 較」,九十七年三月,營建管理季刊,第 74 期,第 1~11 頁,2008。

(7)

32. 楊智斌、余文德、曾秋蓉、黃祥宇、劉沈榮、吳誠魁、陳冠霖、張佩倫,「工 程顧問業知識文件知識地圖之建立」,九十七年六月,營建管理季刊,第 75 期,第 51~58 頁,2008。

33. 李力威、余文德,「專案財務可行性評估系統之研發」,九十七年九月,營建 管理季刊,第 76 期,第 31~40 頁,2008。

34. Yu, W. D., Hsin, Y. Y., and Cheng, S. T., “Project Performance Evaluation for Professional Construction Management (PCM),” 專案管理學刊,第一卷,第二 期,第 18-44 頁,2008。

35. 傅文萍、余文德,「建築工程損鄰事件處理程序之經驗分享」,八十九年十月,

營造天下,第 142 期,第 15~16 頁,2008。

36. 王國武、余文德,「異質性專案採購分析之研究」,專案管理學刊,第二卷,

第二期,pp.26~42,2009。

37. Yu, W. D., and Wu, C.M., “Integration of Research & Development Project Management with Computer Aided Tools for Fast Innovation of Construction Technologies,” 專案管理學刊,第二卷,第四期,第 1-25 頁,2009。(中華 大學重點研究計畫,計畫編號:CHU-98-TR-03)

38. 余文德、鄭紹材、吳誌銘、陳文欽,「系統化技術創新流程(STIP) 應用於道 路人手孔工法之創新」,九十八年九月,營建管理季刊,第 80 期, pp. 55-65,

2009。(中華大學重點研究計畫,計畫編號:CHU-98-TR-03)

39. 楊智斌、余文德、邱垂德、鄭紹材,「國內道路養護導入成效式合約分析」,

九十八年九月,營建管理季刊,第 80 期,pp. 38-46, 2009。

40. 程立民、余文德,「專案構型管理系統導入營建工程變更設計管理之探討」,

九十九年三月,營建管理季刊,第 82 期,pp. 38-47, 2010。

41. 余文德、吳誌銘、江庭芳,「營建工程專利技術功能模型自動化分析之研究」, 一百年九月,營建管理季刊,第 88 期, pp. 1-11,2011。(NSC 99-2221-E-216 -041 -MY2)

42. 余文德、吳誌銘、羅浩榕,「營建技術自動化創新構想產生模式之研究」,一 百年九月,營建管理季刊,第 88 期, pp. 23-33,2011。(NSC 99-2221-E-216 -041 -MY2)(該論文獲得營建管理學會 101 年度最佳研究論文獎)

43. 林明村、鄭紹材、余文德,「運用銀行融資方法分析太陽光電發電系統建置 之財務可行性」,101 年 12 月,營建管理季刊,第 92 期, pp.37-49,2012。

44. 王明德、邱垂德、余文德、楊智斌,「國內 BIM 產業與大學教育現況分析」,

102 年 9 月,營建管理季刊,第 96 期, pp.41-48,2013。

45. 邱垂德、劉得廣、余文德、劉沈榮,「台灣地區現行 BIM 專案之交付成果探 討」,103 年 9 月,營建管理季刊,第 99 期, pp.35-53,2014。(該論文獲 得營建管理學會 104 年度最佳研究論文獎)

46. 余文德、劉得廣、賴建宏,「以知識管理為基礎之工程設計輔助系統研究—

以道路工程設計為例」,101 年 12 月,營建管理季刊,第 100 期, pp. 33-44,

(8)

2015。

47. 余文德、張琬媃,「工程顧問公司知識管理成效影響因子與改善策略」,工程,

第八十八卷,第二期,第 16-32 頁,2015。

48. 樂雲、鄭威、余文德,「基於 Cloud-BIM 的工程項目數據管理研究」,工程 管理學報,第二十九卷,第一期,第 91-96 頁,2015。(工程管理學報收錄 於 中 國 大 陸 「 中 國 科 技 核 心 期 刊 」 名 錄 中 , DOI: 10.13991/

j.cnki.jem.2015.01.018)

49. 柯弘玟、余文德,「建築資訊模型對提升消防救災效率可行性之調查」,104 年 6 月,營建管理季刊,104 年 6 月,第 101 期, pp. 24-37,2015。

50. 黃贊文、余文德,「以 Wiki 技術改進營建管理教育知識蒐集與學習方法之探 討—以專案管理維基百科為例」,104 年 9 月,營建管理季刊,第 102 期, pp.

16-32,2015。

51.

International Conference Papers【國際英文研討會論文】:

1. Yu, W.D., and Skibniewski, M. J., "Analyzing construction technology effectiveness with Automated Constructability Review System (ACoRS),"

Proceedings of the 1st CSCE Construction Specialty Conference, June 1995, Ottawa, Canada, pp. 873-882, 1995.

2. Yu, W. D., "An adaptive analytic hierarchy process for determining the fuzzy membership values in multi-criterion decision problems." Proceedings of the 1995 International Conference of CFSA/IFIS/SOFT'95 on Fuzzy Theory and Applications, Dec. 1995 in Taipei, R.O.C., pp. 308-313, 1995.

3. Yu, W. D., and Skibniewski, M. J., "Construction modeling and analysis—the COMMON approach," Proceedings of the Joint Conference of the Fifth International Conference on Automation Technology and 1998 International Conference of Production Research (Asia Meeting), Session D6-1, July 20~22, Taipei, Taiwan, R.O.C., 14 pp., 1998.

4. Yu, W. D., and Skibniewski, M. J., "Continuous constructability knowledge acquisition with fuzzy knowledge-based failure mode and effects analysis,"

Proceedings of ISARC 2000, Session IT-TE2, Sep. 18~20, Taipei, Taiwan, R.O.C., pp. 847~854, 2000.

5. Yu, W. D., Cheng, Y. M., Wu, C. F., and Wang, S. S., "Facility risk management of common conduits," Proceedings of ISARC 2000, Session Hazard-MC3, Sep.

18~20, Taipei, Taiwan, R.O.C., pp. 159~164, 2000.

6. Yu, W. D., and Lai, C. C., “WICE: A Web-based Intelligent Cost Estimator for Real-time Decision Support,” Proceedings of IEEE/WIC International Conference on Web Intelligence (WI'03), Oct. 13~16, Session 10B, October 13-16, 2003, Lord Nelson Hotel, Halifax, Canada, pp. 646~649, 2003.

(9)

7. Yu, W. D., and Lee, Y. R., “Mining of Conceptual Cost Estimation Knowledge with a Neuro Fuzzy System,” Proceedings of ISARC 2004, Session SA 03-05, Sep. 21~25, Jeju, Korea, pp. 118-124, 2004.

8. Yu, W. D., and Lin, H. W., “A neuro fuzzy system for knowledge discovery of incomplete construction data,” Proceedings of ISARC 2004, Session SA 05-02, Sep. 21~25, Jeju, Korea, pp. 183-185, 2004.

9. Yu, W. D., and Fu, J. W., “A Web Agent for Conceptual Cost Estimation of Highway Construction Projects,” Proceedings of ISARC 2004, Session S19-05, Sep. 21~25, Jeju, Korea, pp. 658-663, 2004.

10. Yu, W. D., and Fan, G. W., “Hybrid Soft Computing Approach for Knowledge Discovery in Construction Engineering,” Proceedings of CC 2005, Session II, Aug. 29~Sept. 2, Rome, Italy, 17 pp., 2005.

11. Yu, W. D., Lo, S. S., and Fan, G. W., “Real-Time Decision-Making with Partial Information for Construction Management,” Proceedings of ISARC 2005, Session MN&P-2-5, Sept. 11~14, 2005, Ferrara, Italy, 7 pp., 2005.

12. Yu, W. D., Fan, G. W., and Lo, S. S., “Integrating Site Conditions in Web-Based Intelligent Cost Estimator (WICE) System for Highway Construction Projects,”

Proceedings of ISARC 2005, Session MN&P-2-6, Sept. 11~14, 2005, Ferrara, Italy, 7 pp., 2005.

13. Yu, W. D., and Hsin, Y. S., “A PCM performance evaluation system for design/build projects,” Proceedings of ICCEM 2005, Session 1-B, Oct. 16~19, 2005, Seoul, Korea, pp. 397-402, 2005.

14. Yu, W. D., and Hsu, Y. P., “Comparison of three PCM performance evaluation systems in Taiwan,” Proceedings of ICCEM 2005, Session 3-A, Oct. 16~19, 2005, Seoul, Korea, pp. 719-724, 2005.

15. Yu, W. D., and Chang, P. L., “Performance evaluation of the construction knowledge management system—a case study of an A/E consulting firm,”

Proceedings of ICCEM 2005, Session 4-D, Oct. 16~19, 2005, Seoul, Korea, 6 pp.

1058-1063, 2005.

16. Yu, W. D., Chang, P.L. and Liu, S.J., “A Model of Performance Improvement Strategy Planning for a Construction Knowledge Management System,”

Proceedings of The Fifth International Conference on Engineering Computational Technology (ECT 2006), Edited by Topping, B. H. V., Montero, G., and Montenegro, Sept. 12~15, Las Palmas de Gran Canaria, Spain, Civil-Comp Press, Stirlingshire, Scotland, Session VII—Modeling of Decision Making and Risk Analysis in Construction Management, pp.70-1~70-18, 2006.

17. Cheng, T. M., Yu, W. D., and Pan, N. F., “A Construction Simulation Using Fuzzy Durations,” Proceedings of The Fifth International Conference on

(10)

Engineering Computational Technology (ECT 2006), Edited by Topping, B. H.

V., Montero, G., and Montenegro, Session VII—Modeling of Decision Making and Risk Analysis in Construction Management, Sept. 12~15, Las Palmas de Gran Canaria, Spain, 15 pp., 2006.

18. Yu, W. D., Cheng, S. T., Shie, Y. L., and Lo, S. S., “Benchmarking Technological Competitiveness of Precast Construction through Patent Map Analysis,”

Proceedings of International Symposium on Automation and Robotics in Construction 2006 (ISARC 2006), Edited by Kano, N. and Arai, T., Session B2—Design, Planning and Management System, Oct. 3~5, 2006, Tokyo, Japan, pp. 119~123, 2006.

19. Yu, W. D., Chang, P.L. and Liu, S.J., “Quantifying Benefits of Knowledge Management System: A Case Study of an Engineering Consulting Firm,”

Proceedings of International Symposium on Automation and Robotics in Construction 2006 (ISARC 2006), Edited by Kano, N. and Arai, T., Session A4—Planning and Management (1), Oct. 3~5, 2006, Tokyo, Japan, pp. 124~129, 2006.

20. Cheng, S. T., Yu, W. D., Wu, C. M., Chiu, R. S., “Analysis of Construction Inventive Patents Based on TRIZ,” Proceedings of International Symposium on Automation and Robotics in Construction 2006 (ISARC 2006), Edited by Kano, N. and Arai, T., Session B3—Construction Planning and Management Methods, Oct. 3~5, 2006, Tokyo, Japan, pp. 134~139, 2006.

21. Yu, W. D., Lin, C. T., Yu, C. T., Liu, S. J., Luo, H. C., and Chang, P. L.

“Integrating emergent problem-solving with construction knowledge management system,” Proceedings of the CME 25 Conference, July 16~18, 2007, University of Reading, Reading, UK, 10 pp., 2007.

22. Wang, K. W. and Yu, W. D. “Analyzing Tender Selection Using a Geometric Graph Analysis (GGA) Approach,” Proceedings of the CME 25 Conference, July 16~18, 2007, University of Reading, Reading, UK, 10 pp., 2007.

23. Yu, W. D., Lin, C. T., Yu, C. T., Liu, S. J., Luo, H. C., and Chang, P. L. “Mining Knowledge in KMS Performance Data—a Case Study of an A/E Consulting Firm,” Proceedings of the Fourth International Conference on Construction in the 21st Century (CITC-IV), Edited by Ahmed, S. M., Azhar, S., and Mohamed, S., T., Session of Knowledge Management in Construction, July 11~13, 2007, Gold Coast, Australia, pp. 574~582, 2007.

24. Yu, W. D., Yang, J. B., Tseng, J. C. R., and Yu, C. T., “Model of Proactive Problem-Solving for Construction Knowledge Management,” Proceedings of International Symposium on Automation and Robotics in Construction 2007 (ISARC 2007), Session 1-C—Management and Production Aspects (1), Sept.

(11)

19~21, 2007, Kochin, India, pp. 493~500, 2007.

25. Yu, W. D., Wu, C. M., and Lien, W. C., “Fast innovation of construction technologies with computer aided innovation tools,” Proceedings of International Symposium on Automation and Robotics in Construction 2008 (ISARC 2008), June 27~29, 2008, Vilnius, Lithuania, pp. 521~527, 2008. (ISIP) 26. Yu, W. D., Wei, Y. T., Liu, S. J., and Chang, P. L., “Preliminary study on the

automatic lessons-learned file generator,” Proceedings of International Symposium on Automation and Robotics in Construction 2008 (ISARC 2008), June 27~29, 2008, Vilnius, Lithuania, 8 pp., 2008. (ISTP)

27. Yu, W. D., Yao, H. H., Liu, S.J., and Chang, P.L., “Knowledge Value Adding Model for Quantitative Performance Evaluation of the Community of Practice in a Consulting Firm,” Proceedings of The Sixth International Conference on Engineering Computational Technology (ECT 2008), Session VIII—Decision Making in Engineering Management, Sept. 2~5, Athens, Greece, 18 pp., 2008.

28. Yu, W. D., Lo, S. S., and Cheng, T. M., “Construction Technological Strategy Planning based on Patent Analysis,” Proceedings of The Sixth International Conference on Engineering Computational Technology (ECT 2008), Session VIII—Decision Making in Engineering Management, Sept. 2~5, Athens, Greece, 14 pp., 2008.

29. Yu, W. D., Lin, S., T.., Liu, S. J., and Chang, P. L., “Mining Knowledge Management Strategies from the Performance Data of CoP,” Proceedings of the International Symposium on Automation and Robotics in Construction 2009 (ISARC 2009), June 24~27, 2009, Austin, Texas, USA, 5 pp., 2009.

30. Yu, W. D., Wu, C. M., and Huang, T. W., “Development and Application of a Systematic Innovation Procedure for Construction Technology,” Proceedings of the International Symposium on Automation and Robotics in Construction 2009 (ISARC 2009), June 24~27, 2009, Austin, Texas, USA, 10 pp., 2009.

31. Yu, W. D., Wu, C. M., and Chen, W. C., “Innovating Road Manhole Technology with Systematic Technology Innovation Procedure (STIP),” Proceedings of The 2nd International Multi-Conference on Engineering and Technological Innovation (IMETI 2009), July 10~13, 2009, Orlando, Florida, USA, pp. 35~40, 2009.

32. Yu, W. D. and Cheng S. T., “Integrated Framework for Construction Innovation Education—a Lesson Learned in Chung Hua University,” Proceedings of the 14th International Symposium on Advancement of Construction Management and Real Estate (CRIOCM 2009), Oct. 29~31, 2009, Nanjing, PRC, pp. 2400-2408, 2009. (ISTP)

33. Yu, W. D., Yang, J. B., Tseng, Judy C. R., Liu, S. J., and Chang, P. L.,

(12)

“Enhancing Engineering Services with Integrated Proactive Knowledge Management Model,” Proceedings of the 14th International Symposium on Advancement of Construction Management and Real Estate (CRIOCM 2009), Oct. 29~31, 2009, Nanjing, PRC, pp. 2409-2416, 2009. (ISTP)

34. Yang, J. B., Yu, W. D., Chiu, C. T., Cheng, S. T., Lim, C. C., and Wu, C. M.,

“Lessons Learned from Implementing Performance-based Contract to Road Maintenance Works,” Proceedings of the 14th International Symposium on Advancement of Construction Management and Real Estate (CRIOCM 2009), Invited Keynote Speech, Oct. 29~31, 2009, Nanjing, PRC, pp. 2140-2145, 2009.

(ISTP)

35. Chang, P. L., Yu, W. D., Cheng, S. T., and Lee, S. M., “Exploring Underlying Patterns of Emergent Problem-Solving in Construction with TRIZ,” Proceedings of the 27th International Symposium on Automation and Robotics in Construction 2010 (ISARC 2010), June 25~27, 2010, Bratislava, Slovakia, pp. 607-616, 2010.

36. Yu, W. D., Wu, C. M., and Chen, W. C., “Preliminary Study on the Model for Automatic Generation of Innovative Alternatives,” Proceedings of The 3rd International Multi-Conference on Engineering and Technological Innovation (IMETI 2010), June 29~July 2, 2010, Orlando, Florida, USA, 6 pp., 2010.

37. Yeh, S. F., Chang, P. L., Yu, W. D., and Lee, S. M., “A Pilot Study on the Application of TRIZ to Problem-Solving of Engineering Consultants,”

Proceedings of the 1st International Conference on Value Engineering (ICVE 2010), Invited Lecture, IV4, Oct. 29, 2010, Taipei, Taiwan, 13 pp., 2010.

38. Chang, P. L., Yu, W. D., and Lee, S. M., “Identifying Construction Problem-Solving Patterns of Lessons Learned with Text Mining Method,”

Proceedings of the 28th International Symposium on Automation and Robotics in Construction 2011 (ISARC 2011), June 30th~July 1st, 2011, Seoul, Korea, 6 pp., 2011.

39. Fu, T. H. and Yu, W. D. “A Pilot Study of A+C Method for Reducing GHG Emissions in Construction Industry,” Proceedings of the 2nd International Conference on Artificial Intelligence, Management Science and Electronic Commerce (AIMSEC 2011), Sept. 23~25, 2011, Chongqing, PRC, pp. 6928~6931, 2011. (EI)

40. Yu, W. D., Cheng, S. T., Lai, Y. H., Lin, C. C., Wu, C. M. and Lou, S. S.

“Application of Fuzzy Inference System to Patent Strategy Analysis of Fall Protection Technology,” Proceedings of the Second International Conference on Soft Computing Technology in Civil, Structural and Environmental Engineering (CSC 2011), Sept. 6~9, 2011, Chania, Crete, Greece, Paper No. 33, 20 pp., 2011.

41. Wu, C. M., Yu, W. D., Cheng, S. T., and Lou, S. S. “Integration of Technology

(13)

Evolution Trends and Genetic Operation Trees for the Generation of Innovative Alternatives,” Proceedings of the Second International Conference on Soft Computing Technology in Civil, Structural and Environmental Engineering (CSC 2011), Sept. 6~9, 2011, Chania, Crete, Greece, Paper No. 44, 17 pp., 2011.

42. Yu, W. D., Cheng S. T., Wu, C. M., and Chiang, T. F. “An Automated Construction Innovation Model to Meet Future Construction Challenges,”

Proceedings of the 16th International Symposium on Advancement of Construction Management and Real Estate (CRIOCM 2011), Invited Keynote Speech, Sept. 23~25, 2011, Chongqing, PRC, pp. 457~462, 2011. (ISTP)

43. Yang, J. B., Chu, M. Y., and Yu, W. D., “Delay Causes Identified by Real Schedule Dispute Cases,” Proceedings of the 16th International Symposium on Advancement of Construction Management and Real Estate (CRIOCM 2011), Sept. 23~25, 2011, Chongqing, PRC, pp. 262~266, 2011. (ISTP)

44. Wu, C. M., Yu, W. D., Chen, T. S., “Enhanced function modeling for analysis of innovative construction technologies,” Proceedings of the Frist Creative Construction Conference 2012, Budapest, Hungary, 6/30~7/3, 2012. (Paper selected for the Special Issue on Creative Construction of Automation in Construction)

45. Yu, W. D., Chang, P. L., Lee, S. M., “A Lesson-learned based Universal Problem Solving Model for Construction Engineering,” Proceedings of the Second Creative Construction Conference 2013 Budapest, Hungary, 7/6~7/9, 2013, pp.

865-878

46. Yu, W. D., Wu, C. M., Wen, S. J., “Integrating Green Innovation and BIM for Sustainable Construction Design,” Proceedings of the Second Creative Construction Conference 2013, Budapest, Hungary, 7/6~7/9, 2013, pp. 879-895.

(NSC 101-2221-E-216-031-MY2)

47. Yu, W. D., Liu, D.G., Lai, C. H., “KMS-based Engineering Design Assistant for Highway Design Projects,” Proceedings of the Nineteenth International Symposium on Artificial Life and Robotics 2014 (AROB 2014), B-Con Plaza, Beppu, Japan, January 22-24, 2014, pp. 671-674. (NSC 101-2221-E-216-031-MY2)

48. Yu, W. D., Chang, Y. H., Liu, D.G., “A Generic Eco-Innovation Model to Improve Building Sustainability,” Proceedings of the Innovation for Sustainability 2014, Porto, Portugal, 7/10~7/11, 2014, pp. 165-1~165-12. (NSC 101-2221-E-216-031-MY2)

49.

Conference Papers【學術研討會論文】:

(14)

1. 余文德,「施工性理論與營建施工作業分析、設計初步架構」,八十七年六月 三十日,第二屆營建管理研究成果聯合發表會論文集,中壢市國立中央大 學,第 430~444 頁,1998。

2. 余文德、鄭景鴻,「營建業邁向上櫃上市之遠景及對營建產業的影響」,中華 民國第一屆營建管理學術研討會論文集,88 年 4 月 28 日至 4 月 30 日,台 灣科技大學,中華民國台北市,Vol. 1, pp. 187~194,1999。

3. Yu, W. D., and Fan, C. C., "Owner's most beneficial schedule," 中華民國第一 屆營建管理學術研討會論文集,88 年 4 月 28 日至 4 月 30 日,台灣科技大 學,中華民國台北市,Vol. 2, pp. 33~40,1999。

4. 丁永聖、余文德,「帷幕牆施工性之改善」,中華民國第一屆營建管理學術研 討會論文集,88 年 4 月 28 日至 4 月 30 日,台灣科技大學,中華民國台北 市,Vol. 2, pp. 233~240,1999。

5. 紀明伸、余文德,「『施工性改善計畫』與『ISO 國際標準認證系統』整合之 探討」,中華民國第一屆營建管理學術研討會論文集,88 年 4 月 28 日至 4 月 30 日,台灣科技大學,中華民國台北市,Vol. 3, pp. 299~306,1999。

6. 余文德、鄭景鴻,「營建業邁向上櫃上市對台灣營建產業之影響」,第三屆海 峽兩岸營建業交流活動營建學術研討會論文集,88 年 6 月 7 日至 6 月 9 日,

中國大陸北京市,第 89~105 頁,1999。

7. 紀明伸、余文德,「運用 ISO 體制建構『施工性改善計畫』」,八十八年六月 三十日,第三屆營建管理研究成果聯合發表會論文集,新竹市國立交通大 學,第 274~285 頁,1999。

8. 丁永聖、余文德,「施工性改善之效益─以大樓帷幕牆工程為例」,八十八年 六月三十日,第三屆營建管理研究成果聯合發表會論文集,新竹市國立交通 大學,第 309~319 頁,1999。

9. Yu, W. D., and Liou, F. S., "Application of Neuro-Fuzzy Networks on Financial Analysis of Construction Firms",八十八年度電子計算機在土木與水利工程上 之應用研討會論文集,八十九年二月十七、十八日,台中市國立中興大學,

第 1244~1252 頁,2000。

10. Yu, W. D., "Knowledge-Based FMEA for Automated Constructability Knowledge Acquisition",八十八年度電子計算機在土木與水利工程上之應用 研討會論文集,八十九年二月十七、十八日,台中市國立中興大學,第 1841~1850 頁,2000。

11. 丁永聖、余文德,「自動化帷幕牆施工性改善評估系統」,八十八年度電子計 算機在土木與水利工程上之應用研討會論文集,八十九年二月十七、十八 日,台中市國立中興大學,第 1995~2004 頁,2000。

12. 紀明伸、余文德、許玉明,「運用 ISO 文件建立自動化施工性知識蒐集雛型 系統」,八十八年度電子計算機在土木與水利工程上之應用研討會論文集,

(15)

八十九年二月十七、十八日,台中市國立中興大學,第 1283~1291 頁,2000。

13. 丁永聖、郭曉青、余文德,「單元式帷幕牆於設計階段施工性之改善」,中華 民國建築學會第十二屆建築研究成果發表會論文集,八十九年四月十六日,

台北市,第 865~868 頁,2000。

14. 紀明伸、余文德,「ISO 品保系統實施施工性改善架構之探討」,八十九年七 月七日,第四屆營建管理研究成果聯合發表會論文集,台中市國立中興大 學,第 177~188 頁,2000。

15. 余文德、鄭奕孟、吳卓夫、王世旭,「高科技工業園區之共同管道設施風險 管理系統」,八十九年十二月廿一日,第四屆營建建築生產及管理技術研討 會論文集,雲林縣斗六市國立雲林科技大學,第 125~132 頁,2000。

16. 鄭奕孟、余文德、吳卓夫、王世旭,「高科技工業園區之共同管道設施維護 管理系統」,八十九年十二月廿一日,第四屆營建建築生產及管理技術研討 會論文集,雲林縣斗六市國立雲林科技大學,第 133~142 頁,2000。

17. 余文德、紀明伸,「台灣營造業運用 ISO 系統實施施工性改善之探討」,第 四屆海峽兩岸營建業交流活動營建學術研討會論文集,90 年 3 月 26 日,台 北市,第 103~118 頁,2001。

18. 余文德、鄭紹材、林文欽,「生態工法之工程管理」,生態工法研討會,中華 大學水域生態環境研究中心,90 年 5 月 19 日,新竹市中華大學,10 pp., 2001。

19. 羅紹松、余文德,「道路工程遭遇抗爭解決模式之初步探討」,九十年六月卅 日,第五屆營建管理研究成果聯合發表會論文集,A1-5,雲林縣斗六市,國 立雲林科技大學,12 pp.,2001。

20. 鄭景鴻、余文德,「營建工程預算編列缺失及改善模式之探討」,九十年六月 卅日,第五屆營建管理研究成果聯合發表會論文集,C3-6,雲林縣斗六市,

國立雲林科技大學,12 pp.,2001。

21. 張圳銘、紀明伸、余文德,「施工性改善文件之實證研究」,九十年六月卅日,

第五屆營建管理研究成果聯合發表會論文集,B1-1,雲林縣斗六市,國立雲 林科技大學,12 pp.,2001。

22. 陳金裕、呂芳杰、余文德,「土石方資源堆置場經濟性之探討」,九十年六月 卅日,第五屆營建管理研究成果聯合發表會論文集,C3-4,雲林縣斗六市,

國立雲林科技大學,12 pp.,2001。

23. 楊自雄、林幸慧、余文德,「房屋仲介業應用電子商務之效益分析」,九十年 六月卅日,第五屆營建管理研究成果聯合發表會論文集,E2-2,雲林縣斗六 市,國立雲林科技大學,12 pp.,2001。

24. Wen-der Yu, and Jyh-Bin Yang, “Data Mining for the Cost Estimating of Highway Bridges Construction with a Neuro-Fuzzy System”, Proceedings of 2001 Ninth National Conference on Fuzzy Theory and Its Applications, Nov.

23~24, National Central University, Chung-li, Taiwan, pp. 437~442, 2001.

25. 余文德、張圳銘,「系統思考於施工性問題分析之初探」,九十年十二月廿八

(16)

日,二十一世紀土木工程技術與管理研討會論文集,B1-4,新竹縣新豐鄉,

明新技術學院,pp. B32~B41,2001。

26. 余文德、劉彥慶,「以系統模擬輔助水泥砂將噴漿工法之改進」,九十年十二 月廿八日,二十一世紀土木工程技術與管理研討會論文集,B2-2,新竹縣新 豐鄉,明新技術學院,pp. B61~68,2001。

27. 余文德、韓仕彥,「鋼結構廠房施工流程電腦模擬分析—以光電廠實際建廠 工程為例」,九十年十二月廿八日,二十一世紀土木工程技術與管理研討會 論文集,B2-3,新竹縣新豐鄉,明新技術學院,pp. B69~B76,2001。

28. 余文德、鄭景鴻,「類神經模糊系統於高速公路土石方工程成本估價之應 用」,九十年十二月廿八日,二十一世紀土木工程技術與管理研討會論文集,

B4-4,新竹縣新豐鄉,明新技術學院,pp. B209~B219,2001。

29. 余文德、張圳銘,「系統思考於快捷施工動態規劃之應用—以南投縣政中心 統包工程為例」,九十一年七月六日,第六屆營建管理研究成果聯合發表會 論文集,台南市,國立成功大學,10 pp.,2002。

30. 余文德、邱威仁,「統包工程專案執行策略之研究—以南投縣政中心統包工 程為例」,九十一年七月六日,第六屆營建管理研究成果聯合發表會論文集,

台南市,國立成功大學,10 pp.,2002。

31. 邱威仁、余文德、柯明宏,「台灣執行 Turnkey 策略之探討-以南投縣政中 心統包工程為例」,2002 海峽兩岸工程管理研討會論文集,2002 年 8 月 15~16 日,中國上海市,同濟大學,16 pp.,2002。

32. 余文德、楊智斌,「e 化課程於營建工程教育之應用與效益-中華大學營建 管理研究所之經驗」,工程運籌 e 化運用-資訊科技在營建產業運用之探討研 討會論文集,2002 年 10 月 18 日,台灣科技大學,台北市,15 pp.,2002。

33. Wen-der Yu, and Yann-ching Liu, “A Preliminary Study on the Neuro-Fuzzy Case-based Reasoning for Construction Knowledge Acquisition,” Proceedings of 2002 Tenth National Conference on Fuzzy Theory and Its Applications, Dec. 5~6, Session E1, National Chiao Tung University, Hsinchu, Taiwan, 4 pp., 2002.

34. 余文德、劉彥慶,「整合類神經模糊網路與案例式推理技術於營建工程知識 系統之應用」,九十二年度電子計算機在土木與水利工程上之應用研討會論 文集,九十二年六月廿六、廿七日,台北市國立台灣科技大學,7 pp.,2003。

35. 余文德、傅嘉偉、李萬利、賴建中,「WICE 網路化即時估價系統」,九十二 年度電子計算機在土木與水利工程上之應用研討會論文集,九十二年六月廿 六、廿七日,台北市國立台灣科技大學,7 pp.,2003。

36. 劉彥慶、余文德,「整合案例式學習與柔性運算方法於營建工程知識系統之 應用」,九十二年六月廿八日,第七屆營建管理研究成果聯合發表會論文集,

高雄縣燕巢鄉,國立高雄第一科技大學,pp. 543~550,2003。

37. 余文德、張正瑩,「道路鋪面工程施工期間社會成本量化分析之實證研究—

以北部地區道路鋪面工程為例」,九十二年六月廿八日,第七屆營建管理研

(17)

究成果聯合發表會論文集,高雄縣燕巢鄉,國立高雄第一科技大學,pp.

589~596,2003。

38. 余文德、張正瑩、羅紹松,「北台灣地區鋪面工程施工社會成本之實證分析」, 2003 海峽兩岸工程管理研討會論文集,Session B-03,2003 年 8 月 28~29 日,

新竹市,中華大學,pp. 11-1~9,2003。

39. 余文德、吳延杰,「污水下水道工程施工期間社會成本之分析」,2003 海峽 兩岸工程管理研討會論文集,Session B-05,2003 年 8 月 28~29 日,新竹市,

中華大學,pp. 13-1~12,2003。

40. 余文德、何純平,「公有建築物專案設計進度管理模式之比較」,2003 海峽 兩岸工程管理研討會論文集,Session B-07,2003 年 8 月 28~29 日,新竹市,

中華大學,pp. 15-1~10,2003。

41. 余文德、柯明宏,「公共工程縮短工期配套策略之探討」,2003 海峽兩岸工 程管理研討會論文集,Session B-09,2003 年 8 月 28~29 日,新竹市,中華 大學,pp. 17-1~11,2003。

42. 余文德、吳延杰,「污水下水道工程施工期間社會成本之分析」,九十二年九 月廿六日,2003 下水道工程實務研討會論文集,台中市,國立中興大學,

pp. 175~186,2003。(獲該研討會「優秀論文獎」)

43. 余文德、苗敬美,「整合系統思考與平衡計分卡於大學學務績效提升之研究

-以中華大學學務處為例」,2004 自強隧道論壇—學生事務與服務學習學術 研討會論文集,Session A1-3,2004 年 6 月 4 日,台北市,東吳大學, pp.

68-81,2004。

44. 何純平、余文德,「公共建築工程專案設計品質管理量化模式之探討」,九十 三年六月五日,第一屆營建產業永續發展研討會論文集,Session 1D-1,新 竹市,中華大學,pp. 1-199~208 ,2004。

45. 何純平、余文德,「公共建築工程專案設計進度管理量化模式之探討」,九十 三年六月五日,第一屆營建產業永續發展研討會論文集,Session 1D-2,新 竹市,中華大學,pp. 1-209~218,2004。

46. 辛銀松、余文德,「PCM 執行統包公共工程績效評估之研究」,九十三年六 月五日,第一屆營建產業永續發展研討會論文集,Session 2B-2,新竹市,

中華大學,pp. 2-67~77,2004。

47. 李昱儒、余文德,「類神經模糊網路於大陸地區住宅建築工程估價之應用」,

九十三年六月五日,第一屆營建產業永續發展研討會論文集,Session 3A-2,

新竹市,中華大學,3-11~20,2004。

48. 林涵文、余文德,「應用纇神經模糊網路在營建知識發掘資料缺漏問題之探 討」,九十三年六月五日,第一屆營建產業永續發展研討會論文集,Session 3A-3,新竹市,中華大學,pp. 3-21~30,2004。

49. 傅嘉偉、余文德,「營建道路工程成本概估網路代理人」,九十三年六月五日,

第一屆營建產業永續發展研討會論文集,Session 3A-5,新竹市,中華大學,

(18)

pp. 3-41~50,2004。

50. 何純平、余文德,「公共建築工程專案設計品質管理量化模式之探討」,九十 三年六月廿六日,第八屆營建工程與管理研究成果聯合發表會論文集,

Session A1-1,台北市,國立台灣大學,pp. A1-1~8,2004。

51. 傅嘉偉、余文德,「網路智慧型道路工程估價代理人」,九十三年六月廿六日,

第八屆營建工程與管理研究成果聯合發表會論文集,Session D1-2,台北市,

國立台灣大學,pp. D1-1~10,2004。

52. 林涵文、余文德,「類神經模糊系統在營建知識發掘中資料缺漏問題之研 究」,九十三年六月廿六日,第八屆營建工程與管理研究成果聯合發表會論 文集,Session E1-2,台北市,國立台灣大學,pp. E1-1~8,2004。

53. 李昱儒、余文德,「主項比例估價法於大陸地區住宅建築工程快速成本估價 系統之應用」,九十三年六月廿六日,第八屆營建管理研究成果聯合發表會 論文集,Session A2-6,台北市,國立台灣大學,pp. A2-1~9,2004。

54. 辛銀松、余文德,「PCM 執行統包公共工程績效之評估」,九十三年六月廿 六日,第八屆營建工程與管理研究成果聯合發表會論文集,Session D3-1,

台北市,國立台灣大學,pp. D3-1~8,2004。

55. 何純平、余文德,「公共建築工程專案設計進度管理模式之比較」,九十三年 七月卅一日,2004 營建技術暨管理研討會論文集,Session A1-5,斗六市,

雲林科技大學,14pp.,2004。

56. Wen-der Yu, and Lin, H. W, “A VaFALCON NEURO-FUZZY SYSTEM FOR MINING OF INCOMPLETE DATABASES,” Proceedings of 2004 The Twelfth National Conference on Fuzzy Theory and Its Applications, Nov. 12~13, Session XIII-c2211, National Ilan University, Ilan, Taiwan, 6 pp., 2004.

57. 宋玲、余文德,「BOT 與統包專案模式財務模型之分析—以某大學人宿舍為 例」,九十四年五月廿八~廿九日,第九屆營建工程與管理研究成果聯合發 表會論文集,Session B1-02,台北市,國立台北科技大學,10 pp.,2005。

58. 范綱緯、羅紹松、余文德,「工址分析與即時估價系統整合」,九十四年五月 廿八~廿九日,第九屆營建工程與管理研究成果聯合發表會論文集,Session D1-07,台北市,國立台北科技大學,10 pp.,2005。

59. 張佩倫、余文德,「知識管理績效評估之研究—以工程顧問公司為例」,九十 四年五月廿八~廿九日,第九屆營建工程與管理研究成果聯合發表會論文 集,Session E2-06,台北市,國立台北科技大學,13 pp.,2005。

60. 許燕萍、余文德,「PCM 績效指標之實例驗證-以統包建築工程為例」,九十 四年五月廿八~廿九日,第九屆營建工程與管理研究成果聯合發表會論文 集,Session E2-05,台北市,國立台北科技大學,10 pp.,2005。

61. 駱芙宜、余文德,「臺北都會區大眾捷運系統聯合開發基地最適規模研究」,

九十四年五月廿八~廿九日,第九屆營建工程與管理研究成果聯合發表會論 文集,Session A1-06,台北市,國立台北科技大學,10 pp.,2005。

(19)

62. 余文德、張佩倫、朱福來,「台灣工程顧問業知識管理系統效益之評估─以 中華顧問工程司 SOS 系統為例」,第七屆海峽兩岸營建業交流學術研討會論 文集,2006 年 4 月 3 日,中國雲南省昆明市,pp. 52~61,2006。

63. 謝侑霖、羅紹松、余文德,「營建產業專利地圖之工法技術分析─以預鑄工 法為例」,九十五年七月四日,第十屆營建工程與管理研究成果聯合發表會 論文集,Session B01,中壢市,國立中央大學,8 pp.,2006。

64. 范綱緯、余文德,「整合 XML 與資料探勘技術於施工日報分析之應用」,九 十五年七月四日,第十屆營建工程與管理研究成果聯合發表會論文集,

Session B03,中壢市,國立中央大學,8 pp.,2006。

65. 蔡宜靜、余文德,「DEA 方法應用於評估工程顧問公司知識管理績效之研 究」,九十五年七月四日,第十屆營建工程與管理研究成果聯合發表會論文 集,Session E01,中壢市,國立中央大學,8 pp.,2006。

66. 黃為民、張乃文、余文德,「工程專案管理專業認證產業分析」,九十五年七 月四日,第十屆營建工程與管理研究成果聯合發表會論文集,Session E07,

中壢市,國立中央大學,8 pp.,2006。

67. 楊文龍、余文德,「私立學校學生宿舍 BOT 執行模式財務投資指數之風險分 析—以某私立大學為例」,九十五年七月四日,第十屆營建工程與管理研究 成果聯合發表會論文集,Session F10,中壢市,國立中央大學,8 pp.,2006。

68. 羅紹松、謝侑霖、余文德,「以專利指標衡量營造業之創新能力與競爭力」,

九十五年七月四日,第十屆營建工程與管理研究成果聯合發表會論文集,

Session J02,中壢市,國立中央大學,8 pp.,2006。

69. 羅紹松、余文德,「營建業技術創新能力技術定位之研究—以預鑄工法為 例」,2007 年 7 月 4 日,第十一屆營建工程與管理學術研討會論文集,Poster Session,新竹市,中華大學,9 pp.,2007。

70. 黃為民、余文德,「營建專案管理流程架構之研究」,2007 年 7 月 4 日,第 十一屆營建工程與管理學術研討會論文集,Session SL-2,新竹市,中華大 學,9 pp.,2007。

71. 張佩倫、余文德、林振得、游正田、劉沈榮、羅懷慶、陳冠霖,「工程顧問 公司應用知識管理系統解決緊急問題之研究」,2007 年 7 月 4 日,第十一屆 營建工程與管理學術研討會論文集,Session IT-4,新竹市,中華大學,7 pp.,

2007。

72. 張佩倫、余文德、劉沈榮,「工程顧問導入知識管理系統個案探討—台灣世 曦工程顧問之經驗」,2008 年 7 月 3 日,第十二屆營建工程與管理學術研討 會論文集,Session 05 營建資訊科技,高雄市,蓮潭國際文教會館,10 pp.,

2008。

73. 連偉志、吳誌銘、余文德,「整合國際研發專案管理與電腦輔助創新應用於 建築漏水修繕工法創新之研究」,2008 年 7 月 3 日,第十二屆營建工程與管 理學術研討會論文集,Session 01 規劃設計管理與專案管理,高雄市,蓮潭

(20)

國際文教會館,10 pp.,2008。

74. 魏宇德、余文德,「文字探勘技術應用於自動建立經驗學習檔案之研究」,2008 年 7 月 3 日,第十二屆營建工程與管理學術研討會論文集,Session 05 營建 資訊科技,高雄市,蓮潭國際文教會館,10 pp.,2008。

75. 江端祥、余文德,「捷運管線遷移工程社會成本之探討」,2008 年 7 月 3 日,

第十二屆營建工程與管理學術研討會論文集,Session 02 營建財務與經濟,

高雄市,蓮潭國際文教會館,10 pp.,2008。

76. 吳仁舜、余文德,「IPMA C Level 知識體系導入專業營建管理服務(PCM)之 實務研究」,2008 年 7 月 31 日,2008 營建管理研討會論文集,斗六市,雲 林科技大學,10 pp.,2008。

77. 姚宣合、余文德,「工程顧問公司社群知識加值績效評估模式之研究」,2008 年 7 月 31 日,2008 營建管理研討會論文集,斗六市,雲林科技大學,10 pp.,

2008。

78. 李力威、余文德,「兩岸捷運站區聯合開發財務可行性評估之比較-以南京 市與台北市個案為例」,2008 年 7 月 31 日,2008 營建管理研討會論文集,

斗六市,雲林科技大學,10 pp.,2008。

79. 傅文萍、余文德,「實獲值管理於中小型營造廠工程成本控制之實證研究」,

2008 年 11 月 1 日,第六屆營建工程永續發展研討會論文集,全一冊,台中 市,逢甲大學,pp.51-1~51-10,2008。

80. 連偉志、吳誌銘、余文德,「整合國際研發專案管理與電腦輔助創新應用於 建築漏水修繕工法創新之研究」,2008 年 7 月 3 日,第十二屆營建工程與管 理學術研討會論文集,Session 01 規劃設計管理與專案管理,高雄市,蓮潭 國際文教會館,10 pp.,2008。

81. 鄭紹材、余文德、吳誌銘,「系統化技術創新流程(STIP)於營建工程防崩塌 豎井開挖工法之研發」,第二屆海峽兩岸創新方法(TRIZ)研討會論文集,中 國西南交通大學,中國成都,2009 年 10 月 24 日,Session A-5,pp. 1-7,2009。

(獲得該研討會最佳論文獎)

82. 余文德、吳誌銘,「整合系統化技術創新流程於研發專案管理課程教學—中 華大學之經驗」,第二屆海峽兩岸創新方法(TRIZ)研討會,中國成都,2009 年 10 月 24 日,Session C-1,pp. 1-6,2009。

83. 温兆寶、余文德、王世旭、蕭汎儀、王維志,「半導體裝機配管工程成本估 價模式之探討」,2010 年第 14 屆營建工程與管理學術研討會論文集,2010 年 7 月 2 日,台北市國立台灣大學,2010。(獲得該研討會佳作論文獎) 84. 羅浩榕、連偉志、吳誌銘、鄭紹材、余文德,「TRIZ 理論於簡易型住宅防盜

安全系統研究之應用」,第三屆海峽兩岸創新方法(TRIZ)研討會,台灣台 中市,2010 年 10 月 26 日,7 pp.,2010。

85. 鄭紹材、田慶誠、余文德、吳誌銘、吳炳勳,「建築防火智慧型技術之發展」,

2010 建築防火科技創新技術國際研討會,台灣台北市,2010 年 11 月 16~17

(21)

日,18pp.,2010。

86. 羅浩榕、吳誌銘、余文德,「營建技術自動化構想產生模式之探討-以建築隔 震層管線設計結構為例」,2011 年第 15 屆營建工程與管理學術研討會論文 集,2011 年 6 月 28 日,台北市國立台灣科技大學, 8pp. 2011。

87. 江庭芳、吳誌銘、余文德,「以文字探勘自動技術分析營建工程專利之探討」, 2011 年第 15 屆營建工程與管理學術研討會論文集,2011 年 6 月 28 日,台 北市國立台灣科技大學, 8pp. 2011。

88. 李建中、余文德、楊智斌、曾秋蓉、李順敏、周昌典、張佩倫,「台灣世曦 工程之主動式問題解決系統」,100 年電子計算機於土木水利工程應用研討 會 (CCACHE 2011)論文集,中國土木水利工程學會,2011 年九月 1~2 日,

高雄市,6 pp.,2011。

89. 余文德、吳誌銘、羅浩榕,「應用 TRIZ 於營建工程技術創新構想自動化產 生之探討」,第四屆海峽兩岸創新方法研討會,中國東北林業大學,哈爾濱,

黑龍江,2011 年 12 月 26 日。(獲主辦單位評選為最佳論文)

90. 林富仁、余文德、王明德,「都市更新案事業計畫階段風險辨認及其解決策 略之研究-以臺北市為例」,2012 (第 16 屆)營建工程與管理學術研討會,朝 陽科技大學,台中市,2012 年 7 月 2 日,7pp.。

91. 許家洋、張佩倫、余文德,「CAD 圖檔之知識探勘技術應用於營建工程」,

2012 (第 16 屆)營建工程與管理學術研討會,朝陽科技大學,台中市,2012 年 7 月 2 日,8pp.。

92. 陳泰旭、吳誌銘、余文德,「結合效用理論與實體模型於創新營建技術評估 之應用」,2012 (第 16 屆)營建工程與管理學術研討會,朝陽科技大學,台中 市,2012 年 7 月 2 日,10pp.。

93. 薛振興、余文德,「中小型建築投資專案早期獲利指標之建立」,2013 中華 民國營建工程學會第十一屆營建工程與永續能源研討會,A-5,元智大學,

中壢,2013 年 11 月 02 日,11pp.。(獲主辦單位評選為最佳論文獎第二名)

94. 劉得廣、余文德,「以 BIM 為基礎之建築物碳排放分析個案探討」,2013 中 華民國營建工程學會第十一屆營建工程與永續能源研討會,B-13,元智大 學,中壢,2013 年 11 月 02 日,11pp.。(獲主辦單位評選為最佳論文獎第三 名)

95. 張育皓、余文德,「以 BIM 為基礎之建築能源效率分析個案探討」,2013 中 華民國營建工程學會第十一屆營建工程與永續能源研討會,B-13,元智大 學,中壢,2013 年 11 月 02 日,14pp.。

96. 劉得廣、余文德、賴建宏,「以知識管理為基礎之道路工程設計輔助系統 (EDA-Road)研究」,第十八屆營建工程與管理研討會,A2,宜蘭大學,中壢,

2014 年 6 月 26 日,pp. 41-48。(獲主辦單位評選為論文佳作獎)

97. 張育皓、余文德、鄭紹材,「大數據方法於施工查核缺失態樣分析之探討」,

2014 中華民國營建工程學會第十二屆營建工程與永續能源研討會,B-13,

(22)

中華大學,新竹市,2014 年 11 月 13 日,11pp.。

98. 張琬媃、余文德、劉沈榮,「工程顧問公司知識管理成效影響因子之探討」,

2014 中華民國營建工程學會第十二屆營建工程與永續能源研討會,B-13,

中華大學,新竹市,2014 年 11 月 13 日,17pp.。

99. 柯弘玟、余文德,「建築資訊模型應用於消防救災接受度之探討」,第十九屆 營建工程與管理研討會,國立高雄應用科技大學,高雄市,2015 年 7 月 1 日,8 pp.,2015。

100. 黃贊文、余文德,「以 Wiki 技術改進傳統專案管理知識蒐集與學習方法之研 究」,第十九屆營建工程與管理研討會,國立高雄應用科技大學,高雄市,

2015 年 7 月 1 日,10 pp.,2015。

101. 張憲寬、余文德、邱垂德、鄭紹材、張欽智、林楨中,「應用四維建築資訊 模型之建築施工墜落防治安全檢查系統」,第 23 屆海峽兩岸及香港、澳門地 區職業安全健康學術研討會,台北國際會議中心,台北市,2015 年 11 月 04 日,Session A-6, 9pp.,2015。

102. 余文德、莊憶、鄭紹材、張育晧,「營建專案永續性評估指標之建立」,2015 中華民國營建工程學會第十三屆營建工程與永續能源研討會,B-12,中國科 技大學,台北市,2015 年 11 月 21 日,pp. 187-196.。(獲主辦單位評選為最 佳論文獎佳作,MOST-103-2621-M-216-004)

103.

Books【專書】:

1. Yu, W. D. (1996). "A Neuro-Fuzzy Knowledge-Based Multi-criterion Decision Model for Constructability Analysis and Improvement of Construction Technologies." Thesis prepared in Partial Fulfillment of the Requirements for the Degree of Ph.D., Area of Construction Engineering & Management, School of Civil Engineering, Purdue University, Indiana, USA.【Ph.D. Thesis】

2. 劉福勳、余文德,「實用工程英文」,詹氏書局,八十八年十月,新竹市,台 灣,1999。ISBN 957-97408-3-6。

3. 鄭紹材、余文德,「水域生態工程品質管制」,中華大學水域生態環境研究中 心,九十三年九月,新竹市,台灣,2004。

4. 余文德、楊智斌、鄭紹材主編,2007 IPMA 營建專案管理最佳實務案例集,

台灣專案管理學會,ISBN:978-986-84115-0-0,2008。

5. 楊智斌、余文德、鄭紹材主編,2008 IPMA 營建專案管理最佳實務案例集,

台灣專案管理學會,ISBN:978-986-84115-1-7,2008。

(23)

6. 余文德、楊智斌、鄭紹材主編,2009 IPMA 營建專案管理最佳實務案例集,

台灣專案管理學會,ISBN:978-986-84115-2-4,2009。

7. 邱垂德、余文德、楊智斌、鄭紹材主編,2010 IPMA 營建專案管理最佳實務 案例集,台灣專案管理學會,ISBN: 978-986-84115-3-1,2010。

8. 鄭紹材、余文德、邱垂德主編,2011 IPMA 營建專案管理最佳實務案例集,

台灣專案管理學會,ISBN: 978-986-84115-5-5,2011。

9. 余文德,實用專案管理,詹氏書局,ISBN 978-957-43-0811-8,2013 初版,

2015 二版。

Patent Applications【申請專利】:

1. 余文德、鄭紹材、蘇祺焜、劉雅芳、吳誌銘,中華民國新型專利名稱:「植 栽 裝 置 改 良 」, 專 利 權 人 : 中 華 大 學 , 公 告 號 : M401980 , 公 告 日 期 2011/04/21,專利權期間:2011/4/21~2020/09/20,2011。

2. 鄭紹材、余文德、吳誌銘、連偉志、羅浩榕,「營建樁孔安全防護裝置」,中 華民國新型專利,專利權人:中華大學,公告號:M461651 號,公告日期 2013/9/11,專利權期間:2013/9/11~2019/12/1,2013。

3. 余文德、楊智斌、曾秋蓉、吳智瑋、吳榮煌、周昌典,「用於問題解決之主 動式知識管理系統、方法及電腦程式產品」,中華民國發明專利,專利權人:

台灣世曦工程顧問公司。公告號:I419071,公告日期 2013/12/11,專利權期 間:2013/12/11~2030/3/4,2013。

Technical Reports【技術報告】:

1. Yu, W.D., "Application of fuzzy neural expert system in construction engineering

& management." Report of Independent Research in Partial Fulfillment of the Requirements for the Degree of Master of Science in Civil Engineering, Area of Construction Engineering & Management, School of Civil Engineering, Purdue University, Indiana, USA, 1993.

2. Skibniewski, M. J., and Yu, W.D., "Automated constructability review system (ACoRS)-TEAM" Internal report of Obayashi Corporation, Japan, 1994.

3. Skibniewski, M. J., and Yu, W.D.,"Automated constructability review system (ACoRS)-TEAM & AREM." Internal report of Obayashi Corporation, Japan, 1995.

4. Skibniewski, M. J.,Lueprasert, K., and Yu, W.D., ."Automated constructability review system (ACoRS)-final report." Internal report of Obayashi Corporation, Japan, 1996.

5. 余文德,「自動化設計施工性檢核系統雛型之研究」,行政院國家科學委員會 專題研究計畫成果報告,計畫編號:NSC 88-2211-E-216-001,1999。

(24)

6. 吳卓夫、余文德、鄭奕孟,「新竹科學工業園區四期基地共同管溝設施維護 及風險管理系統初步研究」,中華顧問公程司委託專案研究計畫成果報告,

八十九年十月,2000。

7. 余文德,「公共工程業主最有利排程之研究」,行政院國家科學委員會專題研 究計畫成果報告,計畫編號:NSC 89-2211-E-216 -009,2000。

8. 余文德、許玉明,「施工性改善之實證研究(第一年)—施工性改善文件系 統之建立」,行政院國家科學委員會專題研究計畫成果報告,計畫編號:NSC 89-2211-E-216-027,2001。

9. 吳卓夫、余文德、鄭奕孟,「新竹科學工業園區二期安遷戶社區防護牆工程 可行性評估」,國科會新竹科學工業園區管理局委託專案研究計畫成果報 告,九十年十二月,2001。

10. 吳卓夫、余文德,「台灣與大陸營建業相關法規差異性分析之研究」,美地建 設股份有限公司委託專案研究計畫成果報告,九十一年二月,2002。

11. 余文德、楊智斌、鄭景鴻,「工程概算專家系統類神經網路(Neuro-Fuzzy System)資料庫建置委託專案計畫」,中華顧問工程司委託專案研究計畫成果 報告,九十一年十月,2002。

12. 余文德、蕭炎泉,「電子網路營建管理系統之開發」,中華大學委託專案研究 計畫成果報告,九十一年十月,2002。

13. 余文德、鄭奕孟,「施工性改善之實證研究(第二年)—施工性問題之系統 辨識」,行政院國家科學委員會專題研究計畫成果報告,計畫編號: NSC 91-2211-E-216-016,2002。

14. 吳卓夫、余文德、楊智斌,「公共工程契約工期合理化及縮短工期配套措施 之研究」,行政院公共工程委員會委託專案研究計畫成果報告,九十一年十 一月,2002。

15. 吳卓夫、余文德、石進芳,「台灣營造業赴大陸投資發展之可行性研究」,大 鎮營造股份有限公司委託專案研究計畫成果報告,九十二年二月,2003。

16. 余文德、許玉明、鄭奕孟,「施工性改善之實證研究 (第三年)—系統施工性 之研究」,行政院國家科學委員會專題研究計畫成果報告,計畫編號: NSC 91-2211-E-216-016,2003。

17. 余文德,「營建工程鑽探選點與鑽探資料分析知識系統之建構」,行政院國家 科學委員會補助提升產業技術及人才培育研究計畫成果報告,計畫編號:

NSC 92-2622-E-216-010-CC3,11 pp., 2004。

18. 余文德,「混合式柔性計算系統於營建知識發掘之研究 (第一年)」,行政院 國 家 科 學 委 員 會 專 題 研 究 計 畫 成 果 報 告 , 計 畫 編 號 : NSC 92-2211-E-216-017,14 pp., 2004。

19. 余文德,「整合工址分析與即時估價系統於營造廠估價之實證應用」,行政院 國家科學委員會補助提升產業技術及人才培育研究計畫成果報告,計畫編 號: NSC 93-2622-E-216 -013 -CC3,11 pp., 2005。

參考文獻

相關文件

Hope theory: A member of the positive psychology family. Lopez (Eds.), Handbook of positive

Define instead the imaginary.. potential, magnetic field, lattice…) Dirac-BdG Hamiltonian:. with small, and matrix

To improve the convergence of difference methods, one way is selected difference-equations in such that their local truncation errors are O(h p ) for as large a value of p as

The Model-Driven Simulation (MDS) derives performance information based on the application model by analyzing the data flow, working set, cache utilization, work- load, degree

Microphone and 600 ohm line conduits shall be mechanically and electrically connected to receptacle boxes and electrically grounded to the audio system ground point.. Lines in

The continuity of learning that is produced by the second type of transfer, transfer of principles, is dependent upon mastery of the structure of the subject matter …in order for a

Experiment a little with the Hello program. It will say that it has no clue what you mean by ouch. The exact wording of the error message is dependent on the compiler, but it might

The Performance Evaluation for Horizontal, Vertical and Hybrid Schema in Database Systems.. -A Case Study of Wireless Broadband