針對本研究所提出之建議如下:

1. 本研究所彙整之進度管理技術多著重應用於營建工程領域之技術,後續研究若

能加入不同領域於營建工程亦可行之技術,則進度管理技術彙整上將更為完整。

2. 礙 於 資 料 庫 文 獻 數 量 龐 大 , 研 究 趨 勢 分 析 於 文 獻 搜 尋 上 所 使 用 之 關 鍵 字 scheduling 未能包括所有進度管理技術之文獻,於文獻之篩選上有所遺漏,後續 研究若能採用不同之搜尋關鍵字及文獻分類方法,則於文獻研究趨勢分析上將 更為準確。

參考文獻

1. Antill, J. M., and Woodhead, R. W.,“Critical Path Methods in Construction Practice", John Wiley & Sons, 4th ed, New York, 1990.

2. Antonio, A., Gonzalez-Quevedo, AbouRizk, S. M., Iseley, D. T., Halpin, D. W.,

“ Comparison of Two Simulation Methodologies in Construction " , Journal of Construction Engineering and Management, ASCE, 119(3), 573-589, 1993.

3. Ahuja, V., and Thiruvengadam, V.,“Project Scheduling and Monitoringcurrent research status", Construction Innovation, 4, 19-31, 2004.

4. Boctor, F. F.,“Some Efficient Multi-Heuristic Procedure for Resource-constrained Project Scheduling ", European Journal of Operational Research, 49, 3-13, 1990.

5. Callahan, M. T., Quackenbush, D. G., Rowings, J. E., “ Construction Project Scheduling", McGraw-Hill, New York, 1992.

6. Chehayeb, N. N., and AbouRizk, S. M.,“Simulation-Based Scheduling with Continuous Activity Relationships", Journal of Construction Engineering and Management, ASCE, 124(2), 107-115, 1998.

7. Feng, C. W., Liu, L., Burns, S. A.,“Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems", Journal of Computing in Civil Engineering, ASCE, 11

(3), 184-189, 1997.

8. Feng, C. W., Liu, L., Burns, S. A.,“Stochastic Construction Time-Cost Trade-Off Analysis", Journal of Computing in Civil Engineering, ASCE, 14(2), 117-126, 2000 9. Glover, F., Kelly, J. P., Laguna, M.,“Genetic Algorithms and Tabu Search Hybrids for

Optimization", Computers Ops Res., 22(1), 111-134, 1995.

10. Hajdu, M.,“Network Scheduling Techniques for Construction Project Management ",

Kluwer Academic Publisher, Netherlands, 1997.

11. Halpin, D. W., and Riggs, L. S., “Planning and Analysis of Construction Operations”, Wiley, Inc., 1992.

12. Harris, R. B.,“Precedence and Arrow Networking Techniques for Construction", Wiley, New York, 1978.

13. Harris, R. B., “ Packing Method for Resource LevelingPACK)" , Journal of Construction Engineering and Management, ASCE, 116(2), 331-350, 1990.

14. Harris, R. B., and Ioannou, P. G.,“Scheduling Projects with Repetitive Activities", Journal of Construction Engineering and Management, ASCE, 124(4), 269-278, 1998.

15. Hegazy, T., “ Optimization of Resource Allocation and Leveling Using Genetic Algorithms", Journal of Construction Engineering and Management, ASCE, 125(3), 167-175, 1999.

16. Hiyassat, M. A. S., “ Modification of Minimum Moment Approach in Resource Leveling", Journal of Construction Engineering and Management, ASCE, 126(4), 278-284, 2000.

17. Kurihara, K., Nishiuchi, N.,“Efficient Monte Carlo simulation method of GERT-type network for project management", Computer & Industrial Engineering, 42, 521-531, 2002.

18. Leu, S. S., and Yang, C. H., “GA-based Multicriteria optimal model for construction scheduling", Journal of Construction Engineering and Management, ASCE, 125(6), 420-427, 1999.

19. Li, H., and Love, P.,“Using Improved Genetic Algorithm to Facilitate Time-Cost optimization", Journal of Construction Engineering and Management, ASCE, 123(3),

20. Li, H., Cao, J. N., Love, P. E. D., “Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems", Journal of Construction Engineering and Management, ASCE, 125(5), 347-353, 1999.

21. Liu, L., Burns, S.A., Feng, C. W.,“Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method", Journal of Construction Engineering and Management, ASCE, 121(4), 446-454, 1995.

22. Martinez, J. C., and Ioannou, P. G., “ General-Purpose Systems for Effective Construction Simulation", Journal of Construction Engineering and Management, ASCE, 125(4), 265-276, 1999.

23. Moselhi, Osama and EI-Rayes,“Least Cost Scheduling for Repetitive Projects", Canadian Journal of Civil Engineering, 20(5), 834-843, 1993.

24. Moselhi, Osama and EI-Rayes, “ Scheduling of Repetitive Projects with Cost Optimization", Journal of Construction Engineering and Management, ASCE, 119(4), 681-688, 1993.

25. Osama Abudayyeh, P.E. et al, “Analysis of Trend in Construction Research19852002", Journal of Construction Engineering and Management, ASCE, 130(3), 433-439, 2004.

26. Pietroforte, R., and Stefani, T. P.,“ASCE Journal of Construction Engineering and ManagementReview of the year 19832000", Journal of Construction Engineering and Management, ASCE, 130(3), 440-448, 2004.

27. Reda, R. M., “ RPMRepetitive Project Modeling " , Journal of Construction Engineering and Management, ASCE, 116(2), 316-330,1990.

28. Shi, J. J.,“Activity-Based ConstructionABCModeling and Simulation Method", Journal of Construction Engineering and Management, ASCE, 125(5), 354-360,1999.

29. Son, J., and Skibniewski, M. J.,“Multiheuristic Approach for Resource Leveling problem in Construction EngineeringHybrid Approach", Journal of Construction Engineering and Management, ASCE, 125(1), 23-31,1999.

30. Tavas, L. M., and Weglarz, J., “Project Management and SchedulingA Permanent Challenge for OR.", European Journal of Operational Research, 49, 1-2, 1990.

31. Wiest, J. D., and Levy, F. K.,“A Management Guide to PERT/CPM", Prentice-Hall, Englewood Cliffs, N. J., 1977.

32. Zhong, D. H., and Zhang, J. S.,“New method for calculating path float in program evaluation and review techniquePERT)", Journal of Construction Engineering and Management, ASCE, 129(5), 501-506, 2003.

33. 劉福勳,「實用工程進度規劃與控制」,漢天下工程管理顧問有限公司,1996。

34. PMI 專案管理學會,「專案管理知識體系指南」,展頡知識管理顧問股份有限公司,

台北,2003。

35. 林耀煌,「營建工程施工規劃與管理控制」,四版,長松出版社,台北,1996。

36. 黃价成,「時程管理體系整合作法」,碩士論文,國立成功大學土木工程研究所,

台南,2000。

37. 張敬廉,「網圖模組於大型公共工程主辦機關進度管理之應用」,碩士論文,國立 交通大學土木工程研究所,新竹,2001。

38. 黃正忻,「營建工程管理」,九樺出版社,1997。

39. 李得璋,「營建經營管理-營建工程規劃與進度控制」,財團法人台灣營建研究院,

1987。

40. 高志魁,「關鍵鍊排程於營建工程排程之研究」,碩士論文,中華大學營建管理研 究所,新竹,2003。

41. 王炤琮,「動態網圖規劃數學模式之初步研究」,碩士論文,國立台灣工業技術學 院工程技術研究所,台北,1991。

42. 黃承傑,「專案進度風險分析模式-考慮不確定性作業之影響」,碩士論文,國立 高雄第一科技大學營建工程研究所,高雄,2002。

43. 傅正輝,「作業相關性對總工期不確定影響之評估模式」,碩士論文,朝陽科技大 學營建工程系,台中,2004。

44. 吳旻謙,「重複性工程排程規劃演算法之研究」,博士論文,國立台灣科技大學營 建工程系,台北,1999。

45. 張芷宜,「運用機率限制規劃求解資源及資金供給不確定條件下之重複性工程排程 問題」,碩士論文,朝陽科技大學營建工程系,台中,2004。

46. 李威憲,「工程專案資源拉平方法 PLA 之研究」,碩士論文,國立台灣科技大學 營建工程係,台北,2002。

47. 曾貽威,「考慮現金流量之專案多重資源排程最佳化之研究」,碩士論文,朝陽科 技大學營建工程系,台中,2001。

48. 楊崇揮,「多評準施工流程最適化計算模式之探討」,碩士論文,國立台灣工業技 術學院,營建工程技術研究所,台北,1997。

49. 黃榮村,「模擬退火法應用於多資源專案排程問題之研究」,碩士論文,國防管理 學院資源管理研究所,1995。

50. 蔡政峰,「求解有限資源專案排程問題最佳化之研究-以基因演算法求解」,碩士 論文,國立成功大學工業管理學系,台南,2001。

51. 羅友廷,「模糊多目標混合式遺傳演算法在零工式排程系統之應用」,碩士論文,

東海大學工業工程研究所,台中,1999。

52. 張嘉君,「應用模擬退火法求解營建工程專案多重資源排程最佳化之研究」,碩士

論文,朝陽科技大學營建工程系,台中,2003。

53. 王維志、劉正章、何春嫻,「新營建電腦模擬語言--STROBOSCOPE」,營建管理 季刊,第 45 期,第 58-第 60 頁,1990。

54. 蔡雅雯,「營建作業模擬系統邏輯控制元件之研究」,碩士論文,國立中央大學土 木工程學系,桃園,2002。

55. 黃榮堯,「大處著眼、小處著手-施工作業流程電腦模擬規劃分析」,營建管理季 刊,第 36 期,第 38 頁-第 48 頁,1998。

56. 吳獻堂,「應用模糊理論與電腦模擬分析營建操作生產力-COST 電腦模擬程式之 介紹」,碩士論文,朝陽科技大學營建工程系,台中,2000。

57. 洪轟嘉,「結合限制理論與 SmartLink 電腦模擬之開發以輔助預拌混凝土供應鏈之 規劃」,碩士論文,國立中興大學土木工程學系,台中,2001。

58. 吳坤鴻,「時程分析技術知識地圖之建置」,碩士論文,中華大學營建管理研究所,

新竹,2005。

附錄—文獻分類表

附表 1:文獻分類表分類符號代表主題說明

符號 符號代表之主題

A Automation B CPM

C Decision Making / Support D Evaluation Measurement E Float

F General Management G Linear Scheduling / Construction H Network Development

I Network Representation J Optimalization Time-Cost Trade-off K Repetitive Construction L Resource Leveling / Allocation M Schedule Development

N Simplicity O Simulation P Space Q Uncertainty R Other Subjects

附表 2:進度管理技術文獻分類

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

1

McBride, L. W., “Owner’s Return from CPM—Fact or Fiction”, Journal of the Construction Engineering Division, ASCE, 96(1), 1-7, 1970.

■ ˇ

2

Elvers, D. A., “Planning Monitoring Frequencies for CPM Projects”, Journal of the Construction Engineering Division, ASCE, 97(2), 211-226, 1971.

■ ˇ

3

Davies, E. M., “New Criterion for Resource Scheduling”, Journal of the Transportation Engineering Division, ASCE, 99(4), 741-755, 1973.

■ ˇ

4

Paulson, Jr., B. C., “Project Planning and Scheduling: Unified Approach”, Journal of the Construction Division, ASCE, 99(1), 45-58, 1973.

■ ˇ

5

Tsou, C. A., Mitten, L.G., Russell, S.

O., “Search Technique for Project Sequencing”, Journal of the Hydraulics Division, ASCE,99(5), 833-839, 1973.

■ ˇ

6

Dressler, J., “Stochastic Scheduling of Linear Construction Sites”, Journal of the Construction Division, ASCE, 100(4), 571-587, 1974.

■ ˇ

7

Miller, Jr., J. P., “Engineering Scheduling with Manpower Allocation”, Engineering Issues:

Journal of Professional Activities, ASCE, 101(2), 107-115, 1975.

■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

8

Popescu, C., Borcherding, J. D.,

“Developments in CPM, PERT, and Network Analysis”, Journal of the Construction Division, ASCE, 101(4), 769-784, 1975.

■ ˇ

9

Crandall, K. C., “Probabilistic Time Scheduling”, Journal of the Construction Division, ASCE, 102(3), 415-423, 1976.

■ ˇ

10

Kleinfeld, I. H., “Manpower Use in High-Rise Residential

Construction”, Journal of the Construction Division, 102(2), 379-383, 1976.

■ ˇ

11

Reinschmidt, K. F., Frank, W. E.,

“Construction Cash Flow Management System”, Journal of the Construction Division, ASCE, 102(4), 615-627, 1976

■ ˇ

12

Lung, S. T. L., Recker, W. W., “An Algorithm for Route Deviation Service”, Transportation

Engineering Journal, ASCE, 102(1), 161-176, 1976.

■ ˇ

13

Borcherding, J. D., “Cost Control Simulation and Decision Making”, Journal of the Construction Division, ASCE, 103,(4), 577-591, 1977.

■ ˇ

14

Crandall, K. C., “Scheduling Network Loop Detection”, Journal of the Construction Division, ASCE, 103(4), 555-565, 1977.

■ ˇ

15

Crandall, K. C., “Analysis of Schedule Simulations”, Journal of the Construction Division, ASCE, 103(3), 387-394, 1977.

■ Analysis

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case

Study Other

16

Kouskoulas, V., Grazioli, Jr., M.,

“Integrated Management System for Construction Projects”, Journal of the Construction Division, ASCE, 103(1), 101-112, 1977.

■ ˇ

17

Webber, D. W., “Providing In-House Computer Services”, Journal of the Technical Councils of ASCE, 103(1), 53-63, 1977.

■ ˇ

18

Popescu, C. M., “CPM -- Interactive Training Tool”, Journal of the Construction Division, ASCE, 104(2), 157-166, 1978.

■ ˇ

19

Carr, R. I., “Simulation of Construction Project Duration”, Journal of the Construction Division, ASCE, 105(2), 117-128, 1979.

■ ˇ

20

Popescu, C. M., Wilson, J. A.,

“Development Planning and Scheduling Model”, Journal of the Urban Planning and Development Division, ASCE, 105(1), 25-33, 1979.

■ ˇ

21

Ashley, D. B. “Simulation of Repetitive-Unit Construction”, Journal of the Construction Division, ASCE, 106(2), 185-194, 1980.

■ ˇ

22

Pinnell, S. S.,

“Construction/Engineering Management: A Comparison”, Issues in Engineering Journal of Professional Activities, ASCE, 106(4), 405-413, 1980.

■ ˇ Comparison

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case

Study Other

23

Galloway, P. D., Nielsen, K.,

“Schedule Control of PCM Projects”, Journal of the Construction Division, ASCE, 107(2), 323-335, 1981.

■ ˇ

24

Hancher, D. E., Rowings, J. E.,

“Setting Highway Construction Contract Duration”, Journal of the Construction Division, 107(2), 169-179, 1981.

■ Research

study

25

Johnston, D. W., “Linear Scheduling Method for Highway Construction”, Journal of the Construction Division, ASCE, 107(2), 247-261, 1981.

■ Review

26

Melin, J. W., Whiteaker, B.,

“Fencing a Bar Chart”, Journal of the Construction Division, 107(3), 497-507, 1981.

■ Improvement

27

Schlick, H., “Schedule and Resources of Fast Track Renovation Work”, Journal of the Construction Division, ASCE, 107(4), 559-574, 1981.

■ ˇ

28

Sears, G. A., “CPM/Cost: An Integrated Approach”, Journal of the Construction Division, ASCE, 107(2), 227-238, 1981.

■ ˇ

29

Crandall, K. C., Woolery, J. C.,

“Schedule Development under Stochastic Scheduling”, Journal of the Construction Division, ASCE, 108(2), 321-329, 1982.

■ ■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

30

Dabbas, M. A. A., Halpin, D.

W., “Integrated Project and Process Management”, Journal of the Construction Division, ASCE, 108(3), 361-374, 1982.

■ ˇ

31

McGough, E. H., “Scheduling:

Effective Methods and Techniques”, Journal of the Construction Division, ASCE, 108(1), 75-84, 1982.

■ ˇ

32

Stradal, O., Cacha, J., “Time Space Scheduling Method”, Journal of the Construction Division, ASCE, 108(3), 445-457, 1982.

■ ˇ

33

Woolery, J. C., Crandall, K.

C., “Stochastic Network Model for Planning Scheduling”, Journal of Construction Engineering and Management, ASCE, 109(3), 342-354, 1983.

■ □ ˇ

34

Ahuja, H. N., Arunachalam, V., “Risk Evaluation in Resource Allocation”, Journal of Construction Engineering and Management, ASCE, 110(3), 324-336, 1984.

■ ˇ

35

Daniels, D. E. S., Aquilano, N.

J., “Constrained resource project scheduling subject to material constraints”, Journal of Operations Management, 4(4), 369-387, 1984.

■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

36

Ahuja, H. N., Nandakumar, V.,

“Simulation Model to Forecast Project Completion Time”, Journal of Construction Engineering and Management, ASCE, 111(4), 325-342, 1985.

■ ˇ

37

Hribar, J. P., Asbury, G. E.,

“Elements of Cost and Schedule Management”, Journal of

Management in Engineering, ASCE, 1(3), 138-148, 1985.

■ ˇ

38

McConnell, D. R., “Earned Value Technique for Performance Measurements”, Journal of Management in Engineering, ASCE, 1(2), 79-94, 1985.

■ ˇ

39

O’Brien, J. J., Kreitzberg, F. C.,

“Network Scheduling Variations for Repetitive Work”, Journal of Construction Engineering and Management, ASCE, 111(2), 105-116, 1985.

■ ˇ

40

Shukla, J. H., R. L. Kudich, R. W.

Staffensen, “CPM Harnesses Mammoth Powerplant Job”, Civil Engineering—ASCE, 55(1), 50-53, 1985.

■ ˇ

41

Willis, R. J., “Critical path analysis and resource constrained project scheduling — Theory and practice”, European Journal of Operational Research, 21(2), 149-155, 1985.

■ ˇ

42

Arditi, D., Albulak, M. Z.,

“Line-of-Balance Scheduling in Pavement Construction”, Journal of Construction Engineering and Management, ASCE, 112(3), 411-424, 1986.

■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

43

Chrzanowski, Jr., E. N., Johnston, D.

W., “Application of Linear Scheduling”, Journal of Construction Engineering and Management, ASCE, 112(4), 476-491, 1986.

■ ˇ

44

Fellers, G., “Use of GPSS/PC to establish manning levels of a proposed just-in-time production facility”, Computers & Industrial Engineering, 11(1-4), 382-384, 1986.

■ ˇ

45

Handa, V. K., Barcia, R. M., “Linear Scheduling Using Optimal Control Theory”, Journal of Construction Engineering and Management, ASCE, 112(3), 387-393, 1986.

■ ˇ

46

Robison, R., “Building with Software”, Civil

Engineering—ASCE, 56(5), 78-80, 1986.

■ ˇ

47

Smallowitz, H., “Construction by Computer”, Civil

Engineering—ASCE, 56(6), 71-73, 1986.

■ ˇ

48

Boltz, D. H., Molinski, J., “Computer Scheduling: On-Line and On-Time”, Civil Engineering—ASCE, 57(6), 56-58, 1987.

■ ˇ

49

Davis, D. L., Davis, R. D., Shrode, W. S., “Decision support systems (DSS) design for operations managers: an empirical study of the impact of report design and decision style on effective choice”, Journal of Operations Management, 7(1-2), 47-62, 1987.

■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

50

Ebejer, T. M., “The design and construction management process”, Psychiatr Hosp, 18(1), 23-26, 1987.

■ ˇ

51

Hall, H. M., Evans, G.W., “A simple method for estimating the duration of a resource -constrained project”, Computers & Industrial Engineering , 12(1), 47-55, 1987.

■ ˇ

52

Hendrickson, C., Zozaya-Gorostiza, C., Rehak D., Baracco-Miller, E., Lim, P., “Expert System for Construction Planning”, Journal of Computing in Civil Engineering, ASCE, 1(4), 253-269, 1987.

■ ˇ

53

Hendrickson, C., Martinelli, D., Rehak, D., “Hierarchical Rule-Based Activity Duration Estimation”, Journal of Construction Engineering and Management, ASCE, 113(2), 288-301, 1987.

■ ˇ

54

East, E. W., “Knowledge-Based Approach to Project Scheduling System Selection”, Journal of Computing in Civil Engineering, 2(4), 307-328, 1988.

■ ˇ

55

Navinchandra, D., Sriram, D., Logcher, R. D., “GHOST: Project Network Generator”, Journal of Computing in Civil Engineering, ASCE, 2(3), 239-254, 1988.

■ ˇ

56

Russell, A. D., Caselton, W. F.,

“Extensions to Linear Scheduling Optimization”, Journal of Construction Engineering and Management, ASCE, 114(1), 36-52, 1988.

□ ■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

57

Whiteman, W. E., Irwig, H. G.,

“Disturbance Scheduling Technique for Managing Renovation Work”, Journal of Construction Engineering and Management, ASCE, 114(2), 191-213, 1988.

■ ˇ

58

Easa, S. M., “Resource Leveling in Construction by Optimization”, Journal of Construction Engineering and Management, ASCE, 115(2), 302-316, 1989

■ ˇ

59

Mohanty, R. P., Siddiq, M. K.,

“Multiple projects — Multiple resources constrained scheduling: A multi-objective analysis”,

Engineering Costs and Production Economics, 18(1), 83-92, 1989.

□ ■ ˇ

60

Reda, R., Carr, R. I., “Time-Cost Trade-off Among Related Activities”, Journal of Construction Engineering and Management, ASCE, 115(3), 475-486, 1989.

■ ˇ

61

Chang, T. C., Ibbs, C. W., Crandall, K. C., “Network Resource Allocation with Support of a Fuzzy Expert System”, Journal of Construction Engineering and Management, ASCE, 116(2), 239-260, 1990.

■ ˇ

62

Chang, T. C., William I. C., “Priority ranking—a fuzzy expert system for priority decision making in building construction resource scheduling”, Building and Environment, 25(3), 253-267, 1990.

■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

63

Jesus, M., Garza, D. L., Ibbs, C. W.,

“Knowledge-Elicitation Study in Construction Scheduling Domain”, Journal of Computing in Civil Engineering, ASCE, 4(2), 135-153, 1990.

■ ˇ

64

Harris, R. B., “Packing Method for Resource Leveling (PACK)”, Journal of Construction Engineering and Management, ASCE, 116(2), 331-350, 1990.

■ ˇ

65

Householder, J. L., Rutland, H. E.,

“Who Owns Float?”, Journal of Construction Engineering and Management, ASCE, 116(1), 130-133, 1990.

■ ˇ

66

Moselhi, O., Nicholas, M. J., “Hybrid Expert System for Construction Planning and Scheduling”, Journal of Construction Engineering and Management, ASCE, 116(2), 221-238, 1990.

■ □ ■ ˇ

67

Tavakoli, A., “Effective Progress Scheduling and Control for Construction Projects”, Journal of Management in Engineering, ASCE, 6(1), 87-98, 1990.

■ ˇ

68

Zohair M. Sarraj, A., “Formal Development of Line-of-Balance Technique”, Journal of Construction Engineering and Management, ASCE, 116(4), 689-704, 1990.

■ □ ˇ

69

Cherneff, J., Logcher, R., Sriram, D.,

“Integrating CAD with

Construction-Schedule Generation”, Journal of Computing in Civil Engineering, ASCE, 5(1), 64-84, 1991.

□ ■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case Study Other

70

Cole, L. J. R., “Construction Scheduling: Principles, Practices, and Six Case Studies”, Journal of Construction Engineering and Management, ASCE, 117(4), 579-588, 1991.

■ ˇ

71

Eldin, N. N., “Management of Engineering/Design Phase”, Journal of Construction Engineering and Management, ASCE, 117(1), 163-175, 1991.

■ ˇ ˇ

72

Garza, J. M. D. L., Vorster, M. C., Parvin, C. M., “Total Float Traded as Commodity”, Journal of Construction Engineering and Management, ASCE, 117(4), 716-727, 1991.

■ □ ˇ

73

Khattab, M., Choobineh, F., “A new heuristic for project scheduling with a single resource constraint”,

Computers and Industrial Engineering, 20(3), 381-387, 1991.

■ ˇ

74

Padilla, E. M., Carr, R. I., “Resource Strategies for Dynamic Project Management”, Journal of Construction Engineering and Management, ASCE, 117(2), 279-293, 1991.

□ ■ ˇ

75

Roth, S., Hendrickson, C.,

“Computer-Generated Explanations in Project Management Systems”, Journal of Computing in Civil Engineering, ASCE, 5(2), 231-244, 1991.

■ □ ˇ

76

Seibert, J. E., Evans, G. W.,

“Time-Constrained Resource Leveling”, Journal of Construction Engineering and Management, ASCE, 117(3), 503-520, 1991

■ ˇ

主題 性質

A B C D E F G H I J K L M N O P Q R DevelopmentAlgorithm Discussion Case

Study Other

77

Singh, A., “Developing and Implementing C-SCSC”, Journal of Professional Issues in Engineering Education and Practice, ASCE, 117(3), 295-308, 1991.

■ ˇ

78

Li, K. Y., Willis, R. J., “An iterative scheduling technique for resource- constrained project scheduling”, European Journal of Operational Research, 56(3), 370-379,1992.

■ ˇ

79

Shaked, O., Warszawski, A.,

“CONSCHED: Expert System for Scheduling of Modular Construction Projects”, Journal

“CONSCHED: Expert System for Scheduling of Modular Construction Projects”, Journal

在文檔中 進度管理技術彙整之研究 (頁 87-130)