• 沒有找到結果。

Carbonaceous composition changes of heavy-duty diesel engine particles in relation to biodiesels, aftertreatments and engine loads

N/A
N/A
Protected

Academic year: 2021

Share "Carbonaceous composition changes of heavy-duty diesel engine particles in relation to biodiesels, aftertreatments and engine loads"

Copied!
32
0
0

加載中.... (立即查看全文)

全文

Loading

數據

Table 2. The weighted emission factor (EF w , mg/bhp-hr) of OC and EC in TPM under transient cycle.
Table  3.  The average emission factor (EF a , mg/hr) of OC and EC in TPM under steady cycle.
Fig. 1. The experimental setup consists of a constant volume sampling dilution tunnel, an engine dynamometer, a heavy duty diesel engine (HDDE) and PM/gas sampling systems, with bold arrows indicating flow directions.
Fig. 2. The reduction efficiencies of gaseous and particulate emissions under (a) transient cycle with B1S50 as the baseline and (b) steady cycle with idle as the baseline
+5

參考文獻

相關文件

 Promote project learning, mathematical modeling, and problem-based learning to strengthen the ability to integrate and apply knowledge and skills, and make. calculated

Wang, Solving pseudomonotone variational inequalities and pseudocon- vex optimization problems using the projection neural network, IEEE Transactions on Neural Networks 17

Define instead the imaginary.. potential, magnetic field, lattice…) Dirac-BdG Hamiltonian:. with small, and matrix

Owing to rising prices in fresh vegetables in the wake of typhoon and heavy rains in September, upward adjustments of school tuition fees in new academic year and increasing salaries

* School Survey 2017.. 1) Separate examination papers for the compulsory part of the two strands, with common questions set in Papers 1A & 1B for the common topics in

Microphone and 600 ohm line conduits shall be mechanically and electrically connected to receptacle boxes and electrically grounded to the audio system ground point.. Lines in

2 I understand that the Education Bureau (EDB) will take such measures as they consider necessary and appropriate to verify the information provided in and/or in relation to this

Biases in Pricing Continuously Monitored Options with Monte Carlo (continued).. • If all of the sampled prices are below the barrier, this sample path pays max(S(t n ) −