Average daily wages of construction workers
MOP
Non- Quarter-to-
resident quarter
986 615 715 (%)-3.8
993 627 730 -4.6
1 216 649 901 9.6
1 214 631 842 -3.1
1 056 671 763 13.5
953 649 733 -2.8
885 685 732 -6.5
1 241 613 725 -11.4
1 194 634 705 -12.2
1 037 611 690 -9.0
454 448 448 -0.4
Average prices of construction materials
MOP Current Previous Quarter-to- quarter quarter quarter
5 112 5 078 (%)0.7
61.2 62.5 -2.1
112 114 -1.8
31.7 31.9 -0.6
32.8 32.8 -
972 936 3.8
277 267 3.7
660 660 -
878 878 -
Third quarter data of past years
2015 2016 2017 2018
771 768 832 763
101.5 99.6 107.5 99.6
100.4 100.1 102.8 108.6
For additional information:
MOP Macao Pataca - Absolute value equals zero http://www.dsec.gov.mo/e/wages_construction.aspx
www.dsec.gov.mo 2019.11
Overall Local
Welder Carpenter Concreter
Skilled and semi-skilled worker
Alameda Dr. Carlos d’Assumpção, No.411- 417, Dynasty Plaza, 17th floor, Macao Tel.: (853) 8399 5311 Fax: (853) 2830 7825 E-mail: [email protected] Official Statistics. Reproduction of these data is allowed provided the source is quoted.
Symbol and Abbreviation:
Electric wire (single) (length: 100m, size: 10mm²) Ordinary Portland cement (tonne)
Average daily wage of construction workers (MOP) Real wage index of construction workers Price index of construction materials for residential buildings
Structural iron erector Concrete formwork carpenter Bricklayer and plasterer Electrician and electrical worker Air-conditioning mechanic
WAGES OF CONSTRUCTION WORKERS AND PRICES OF CONSTRUCTION MATERIALS
3
RDQUARTER 2019
Sand (m3)
Price index of construction materials for residential buildings (2015=100) Real wage index of construction workers (2015=100)
Construction material
Spiral & round reinf. steel bar (tonne) Clamping plate (plywood) (m2) Ordinary clear sheet glass (m2)
Occupation
Unskilled worker
Thick grey PVC water pipe (unit) (length: 4m, diameter: 32mm)
Concrete (m3) Emulsion paint (litre) Overall
- The average daily wage of construction workers decreased by 3.8% quarter-to-quarter to MOP715 in the third quarter of 2019, with the daily wage of local construction workers (MOP986) edging down by 0.1% while that of non-resident construction workers (MOP615) rising by 3.0%.
- The wage index of construction workers (89.8) for the third quarter of 2019 dropped by 5.5% quarter-to-quarter in real terms, and that of local construction workers (94.1) went down by 2.4%.
- The average prices of spiral & round reinforcing steel bars and concrete rose by 0.7% and 3.8% respectively quarter-to-quarter. The price index of construction materials for residential buildings (110.3) grew by 0.7% quarter-to-quarter, with the price index of concrete rising by 3.8%.
89.8 94.1
85 90 95 100 105 110
Q3
2017 Q1
2018 Q3 Q1
2019 Q3
Overall Local worker
110.3 108.2 127.0
100 105 110 115 120 125 130
Q3
2017 Q1
2018 Q3 Q1
2019 Q3
Global index Steel Concrete