• 沒有找到結果。

Pulmonary veins (PVs) play a critical role in the pathophysiology of atrial fibrillation

N/A
N/A
Protected

Academic year: 2021

Share "Pulmonary veins (PVs) play a critical role in the pathophysiology of atrial fibrillation"

Copied!
2
0
0

加載中.... (立即查看全文)

全文

(1)

題名:Endothelin-1 modulates the arrhythmogenic activity of pulmonary veins.

作者:陳亦仁

Udyavar AR; Chen YC; Chen YJ; Lin CI; Chen SA;

貢獻者:臨床醫學研究所

上傳時間:2009-08-21T08:58:26Z

摘要:Objective: Endothelin-1 has important cardiovascular effects and is activated during atrial fibrillation.

Pulmonary veins (PVs) play a critical role in the

pathophysiology of atrial fibrillation. The aim of this study was to evaluate whether endothelin-1 affects PV arrhythmogenic activity.

Methods: Conventional microelectrodes were used to

record the action potentials (APs) and contractility in isolated rabbit PV tissue specimens before and after the administration of endothelin-1 (0.1, 1, 10 nM). The

ionic currents of isolated PV cardiomyocytes were investigated before and after the administration of endothelin-1 (10 nM) through whole-cell patch clamps.

Results: In the tissue preparation, endothelin-1 (1, 10 nM) concentration dependently shortened the AP duration and decreased the PV firing rates. Endothelin-1 (10 nM) decreased the resting membrane potential. Endothelin-1 (0.1, 1, 10 nM) decreased the contractility and

increased the resting diastolic tension. In single PV cardiomyocytes, endothelin-1 (10 nM) decreased the PV firing rates from 2.7 ± 1.0 Hz to 0.8 ± 0.5 Hz (n = 16).

BQ-485 (100 μM, endothelin-1 type A receptor blocker) reversed and prevented the chrono-inhibitory effects of endothelin-1 (10 nM). Endothelin-1 (10 nM) reduced the L-type calcium currents, transient outward currents, delayed rectifier currents, transient inward currents, and sodium–calcium exchanger currents in the PV

cardiomyocytes with and without pacemaker activity.

(2)

Endothelin-1 (10 nM) increased the inward rectifier potassium current, hyperpolarization-induced pacemaker current, and the sustained outward potassium current in PV cardiomyocytes with and without pacemaker activity.

Conclusion: Endothelin-1 may have an antiarrhythmic potential through its direct electrophysiological effects on the PV cardiomyocytes and its action on multiple ionic currents.

參考文獻

相關文件

– Taking any node in the tree as the current state induces a binomial interest rate tree and, again, a term structure.... Binomial Interest Rate

6 《中論·觀因緣品》,《佛藏要籍選刊》第 9 冊,上海古籍出版社 1994 年版,第 1

To stimulate creativity, smart learning, critical thinking and logical reasoning in students, drama and arts play a pivotal role in the..

- Through exploring current events and social topics in project work and writing newspaper commentary at junior secondary level, students are provided with the

(b) If, in a particular year, the accumulated surplus of the grant reaches 500% of the current year provision, EDB will suspend the disbursement of grant and claw back the

9 The pre-S1 HKAT is conducted in all secondary schools in July every year to assess the performance of students newly admitted to S1 in Chinese Language, English Language

O.K., let’s study chiral phase transition. Quark

– Taking any node in the tree as the current state induces a binomial interest rate tree and, again, a term structure.... An Approximate Calibration