第五章 結論與建議
5.2 未來發展方向
雖然透過一系列的分析方法與程序,可以有效縮短知識規則建構時間,但仍 有許多空間有待努力突破,所以本研究未來方向,將朝著知識自動擷取、知識自 動解析與轉換及推論結果自動回饋並學習…等方向發展,希望能更有效地簡化知 識、知識規則的擷取、分析、轉換、建構與程序,尋求更好的解決之道。
重點課題包括,如圖 52 所示:
y 如何讓專家更簡易的提供知識?希望透過圖形化介面讓學者專家能簡易 描繪自己的知識、經驗與想法並自動轉換成特定格式,即知識自動擷取、
解析與轉換成電腦系統能解讀的機制,如圖 52 1所示。
y 如何直接轉譯成決策系統可以解讀的資料,省卻知識工程師來建構知 識、規則?即知識自動轉換成知識規則的機制,如圖 522所示。
y 結合代理人技術(Agent),自動學習決策推論的經驗?即每次推論結果等 決策經驗自動累積與學習的機制,如圖 523所示。
圖 52. 智慧型決策支援系統今後發展方向架構圖
參 考 文 獻
1. Alter, Steven, “A Taxonomy of Decision Support Systems”, Sloan Management Review, 19, pp. 39, Fall 1977.
2. Atmani A. “A production planning for flexible manufacturing systems with set up cost consideration,” Computers and
Industrial Engineering, Volume 29, Iss. 1, pp. 723-727, Elsevier, September 1995.
3. Basnet, C. and Mize, J. H. “Scheduling and control of flexible manufacturing systems: a critical review”, International Journal of Computer Integrated Manufacturing, Volume 7, Number 6, pp.
340–355, November 1, 1994.
4. Buzacott, John A. “A Perspective on New Paradigms in
Manufacturing”, Journal of Manufacturing Systems, Volume 14, Iss. 2, pp. 118-125, Dearborn, 1995.
5. Chen, Injazz J. and Chung, Chia-Shin. “Sequential modeling of the planning and Scheduling Problems of flexible manufacturing systems”, Journal of the Operational Research Society, Volume 47, Number 10, pp. 1216–1227, Oct., 1996.
6. Chen, Kai Ying, Chang, Wen Chi, Tien, Fan Chih and Kuo, Chun Liang, “Development of A Testbed for RFID Based Flecible Manufacturing System”, The 11th Annual International
Conference on Industrial Engineering Theory, Applications and Practice, Nagoya, Japan, October 24-27, 2006.
7. Chen, Kai Ying, Luo, Peter Yi Fei and Tseng, Wei Rung,
“Modular PAC Software Design Based on Color Petri Net”, 2006 Institute of Industrial Enginer Annual Conference and Exposition, Orlando, U.S.A., May 20-23, 2006.
8. Chiang, Tzu An, Trappey, Amy Jui Fen Chang and Ku,Chung
Chao, “Using knowledge-based intelligent reasoning to support dynamic collaborative design”, Proceedings, APIEMS, Gold Coast, Queensland, Australia, December 12-15, 2004.
9. Chiang, Tzu An, Trappey, Amy Jui Fen Chang and Ku, Chung Chao, “Using a knowledge-based intelligent system to support dynamic design reasoning for a collaborative design community”, International Journal of Advanced Manufacturing Technology, Volume 31, Number 5, pp. 421-433 (SCI), 2006.
10. Feigenbaum, Edward A. “The Art of Artificial Intelligence:
I.Themes and Case Studies of Knowledge Engineering,”
Proceedings of the Fifth International Joint Conference on Artificial Intelligence, pp. 1014-1029, Cambridge, MA.,1977.
11. Feigenbaum, Edward A. “Themes and case studies of knowledge engineering”, Expert Systems in the Micro-Electronic Age, pp.
3-25, Editor, D. Michie, Edinburg Univ. Press, Edinburgh, 1979.
12. Frederick, Hayes Roth, “Knowledge Systems: An Introduction”, Library Hi Tech, Volume 10, Issue 1-2, pp. 15-16, 25, MCB University Press UK, 1992.
13. Gamila, Mansour Abou and Motavalli, Saeid, “A modeling technique for loading and scheduling problems in FMS”, Robotics and Computer-Integrated Manufacturing, Volume 19, Number 1, pp. 45-54, Elsevier, February 2003.
14. Graham, Margaret B. W. and Rosenthal, Stephen R. Institutional Aspects of Process Procurement for Flexible Machining Systems, pp. 11, 38 and 40-43, Boston University, School of Management, Boston, MA, September 1986.
15. Groover, Mikell P. Automation, Production Systems, and Computer-Integrated Manufacturing, Second Edition, pp.
460-513, Prentice-Hall Inc., U.S.A., 2001.
16. Jeng, Mu Der and Chen, Shih Chang, “A Heuristic Approach Based on The State Equations of Petri Net for FMS Scheduling”, Proceedings of the 1995 International IEEE/IAS Conference on Industrial Automation and Control Industrial Automation and Control: Emerging Technologies, pp. 275-281, Taipei, Taiwan, May 22-27, 1995.
17. Jensen, Kurt. “An Introduction to the Theoretical Aspects of Coloured Petri Nets”, A Decade of Concurrency, Lecture Notes in Computer Science, Volume 803, pp. 230-272, Springer-Verlag, 1994.
18. Jeong, K. C. and Kim, Y. D. “A real-time scheduling mechanism for a flexible manufacturing system: using simulation and
dispatching rules", International Journal of Production Research, Volume 36, Iss. 9, pp. 2609 – 2626, Taylor and Francis Ltd,
September 1, 1998.
19. JESS. The Rule Engine for the Java Platform. (2006) Retrieved January 5, 2006, from
http://www.jessrules.com/jess/docs/index.shtml
20. Kashyap, Arun S. and Khator, Suresh K. “Analysis of tool sharing in an FMS: a simulation study”, Computers and Industrial Engineering, Volume 30, Number 1, pp. 137–145, Elsevier, January 1996.
21. Keen, Peter G. W. and Morton, Michael S. Scott, Decision Support Systems: An Organizational Perspective,
Addison-Wesley, MA, August 1978.
22. Kim, M. H., Kim, Y. D. “Simulation-based real-time scheduling in a flexible manufacturing system”, Journal of Manufacturing Systems, Volume 13, Number 2, pp. 85-93, 1994.
23. Kim, Yeong Dae, Lee, Dong Ho and Yoon, Chi Moon,
“Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems”, European Journal of
Operational Research, Volume 133, Number 3, pp. 624-634, September 16, 2001.
24. Kuo, Chun Liang, Ku, Chung Chao, Tsai, Jui Pin, Hung, Benson Chia Wei, Chang, Wen Chi and Chen, Kai Ying, “Development of Rule Base Inference Oriented FMS Dispatcher Using the JESS Platform”, The 36th International Conference on Computers and Industrial Engineering, Taipei, ROC, June 20-23, 2006.
25. Kwasi, Amoako Gyampah, Meredith, J. R. and Raturi, A. “A comparison of tool management strategies and part selection rules for a flexible manufacturing system”, International Journal of Production Research, Volume 30, Number 4, pp. 733–748, April 1, 1992.
26. Laftit, Sai'd and Proth, Jean Marie, “Evaluation of Job Shop with Random Manufacturing time: A Petri Net Approach”, 1990 IEEE International Conference on Robotics and Automation, pp.
1064-1069, Cincinnati, Ohio, USA, May 13-18, 1990.
27. Langevin, A., Lauzon, D., Riopel, D., Langevin, André, Lauzon, Daniel and Riopel, Diane, “Dispatching, routing, and scheduling of two automated guided vehicles in a FMS”, International Journal of Flexible Manufacturing Systems, Volume 8, Number 3, pp. 247-262, Springer Netherlands, July 1996.
28. Lee, Doo Yong and DiCesare, Frank, “Scheduling Flexible Manufacturing Systems Using Petri Nets and Heuristic Search”, IEEE Transactions on Robotics and Automation, Volume 10, Number 2, pp.123-132, 1994.
29. Looney, Carl G. “Fuzzy Petri Net for Rule-Based Decision making”, IEEE Transactions on Systems, Man and Cybernetics,
Volume 18, Iss. 1, pp. 178-183, February, 1988.
30. MacCarthy, B. L. and Liu, J. “A new classification scheme for flexibe manufacturing systems”, International Journal of
Production Research, Volume 31, Number 2, pp. 299-309, Maffei, February 1993.
31. Maimon, Oded Z. and Gershwin, Stanley B. “Dynamic
scheduling and routing for flexible manufacturing systems that have unreliable machines”, Operations Research, Volume 36, Iss. 2, pp. 279–292, Institute for Operations Research and the
Management Sciences (INFORMS), Linthicum, Maryland, USA, March 1988.
32. Minsky, Marvin, A Framework for Representing Knowledge, Psychology of Computer Vision, pp. 211-217, Editor, P. H.
Winston, Patrick Winston, McGraw-Hill, New York, 1975.
33. Minsky, Marvin, “A framework for representing knowledge”, Computation & intelligence: collected readings, pp. 163-189, American Association for Artificial Intelligence Menlo Park, CA, USA ,1995.
34. Montazeri, M. and Van Wassenhove, L. N. “Analysis of scheduling rules for an FMS”, International Journal of
Production Research, Volume 28, Number 4, pp. 785–802, 1990.
35. Moore, Jeffery H. and Chang, Michael G. “Design of decision support systems”, ACM SIGMIS Database, Volume 12, Iss. 1-2, pp. 8-14, ACM Press New York, NY, USA, Fall 1980.
36. Morton, Michael S. Scott. “Management Decision Systems:
Computer Based Support for Decision Making”, Division of Research, Harvard University, Cambridge, Mass., 1971.
37. PACE Version5.0 Cookbook and Tutorial, IBE Simulation Engineering GmbH, pp.1-1~7-32, 2003.
38. PACE Version5.0 Smalltalk Primer and Reference, IBE Simulation Engineering GmbH, pp.1-1~7-4, 2003.
39. Peng, Chong and Chen, F. Frank, “Real-time control and scheduling of flexible manufacturing systems: an ordinal optimization based approach”, The International Journal of Advanced Manufacturing Technology, Volume 14, Number 10, pp. 775-786, Springer London, October 1998.
40. Ranky, Paul. G. The Design and Operation of FMS: Flexible Manufacturing System, IFS Publications Ltd., Bedford,UK, 1983.
41. Ranky, Paul G. Computer Integrated Manufacturing, Prentice Hall Int., UK, Ltd., G. Britain, 1986.
42. Rau, K. Raghava and Chetty, O. V. Krishnaiah, “Production planning of FMS under tool magazine constraints: a dynamic programming approach”, The International Journal of Advanced Manufacturing Technology, Volume 11, Number 5, pp. 366–371, Springer London, September 1996.
43. Roh, H. K. and Kim, Y. D. “Due date based loading and
scheduling methods for a flexible manufacturing system with an automatic tool transporter”, International Journal of Production Research, Volume 35, Iss. 11, pp. 2989 - 3004, November 1997.
44. Sarin, S. and Lefoka, M. “Scheduling heuristic for the n-jobs m-machines flow shop”, Omega, The International Journal of Management Science, Volume 21, Number 2, pp. 229-234, ROYAUME-UNI, 1993.
45. Song, Jongchul, Haas, Carl T., Caldas, Carlos, Ergen, Esin and Akinci, Burcu, “Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects”,
Automation in Construction, Volume 15, Iss. 2, 2006, pp.166-177,
March 2006.
46. Spathopoulos, M. P. and Ridder, M. “Modeling and distributive control design of a flexible manufacturing system”, Computers in Industry, Volume 38, pp.115-130, 1999.
47. Sprague, Ralph H. Jr. and Carlson, Eric D. Building Effective Decision Support Systems, Englewood Cliffs, Prentice Hall, New Jeersey, 1982.
48. Turban, Efraim, Decision support and expert systems:
management support systems, 4 ed., Engelwood Cliffs, N. J., Prentice Hall Inc. 1995.
49. Turban, Efraim and Aronson, Jay E. Decision Support Systems and Intelligent systems, Upper Saddle River, N.J. Prentice Hall, 1998.
50. Trappey, Amy Jui Fen Chang, Trappey, C., Lin, Gilbert Yen Po, Ho, Pei Shun, Ku, Chung Chao and Kuo, Chun Liang, “Design an Integrated Intelligent Equipment Maintenance and Production Dispatching System Using the JESS Platform”, Proceedings, International Conference on WECAM 2006, Gold Coast, Australia, July 11-14, 2006.
51. Wong, S. T. W., Mak, K. L. and Lau, H. Y. K. “An
object-oriented model for the specification of manufacturing systems”, Computers and Industrial Engineering, Volume 36, Iss. 3, pp. 655-671, Elsevier, July 1999.
52. Yao, Yin Ho, Trappey, Amy Jui Fen Chang, Ku, Chung Chao, Lin, Gilbert Yen Po, Tsai, Jui Pin, Ho, Pei Shun and Hung, Benson Chia Wei, “Develop an intelligent equipment
maintenance system using cyber-enabled JESS technology”, Proceedings, International Conference on Hands-on Intelligent Mechatronics and Automation (HIMA2005), IEEE, pp. 927-932,
Taipei, Taiwan., July 10-12, 2005.
53. Yim, Seong Jin and Lee, Doo Yong, “Multiple Objective
Scheduling for Flexible Manufacturing Systems Using Petri Nets and Heuristic Search”, Proceedings IEEE International
Conference on Systems, Man and Cybernetics, pp. 2984- 2989, 1996.
54. Zhou, Meng Chu, Chiu, Hua Sheng and Xiong, H. Henry, “Petri Net Scheduling of FMS Using Branch and Bound Method”, Proceedings of the 1995 IEEE IECON 21st International Conference on Industrial Electronics, Control, and
Instrumentation, Volume 1, Iss. 6-10, pp. 211-216, November 1995.
55. Zhou, Meng Chu and Venkatesh, Kurapati, Modeling, simulation, and control of flexible manufacturing systems: a Petri Net
approach, Series in Intelligent Control and Intelligent
Automation, Volume 6, pp. 64-73, World Scientific Publishing Company, Singapore, 1998.
56. 白明憲,「生產排程—單機模式之研究」,政治大學企管研
究院,2007。
61. 林我聰,現場排成專家系統,資訊與電腦叢書,民國 73 年。
62. 林宏澤,「分支界線法在流程工廠排程之應用」,台灣工業 技術學院,碩士論文,民國 78 年。
63. 林怡仁,「以彩色裴氏網為主之模組化單元控制器之設計」,
國立臺北科技大學工業工程與管理系,碩士論文,2005。
64. 秦劍雲,「知識庫支持之訂貨生產排程系統」,台灣工業技 術學院,碩士論文,民國 78 年。
65. 周永樂,「電腦輔助機械性能監視診斷系統實用化轉動機械異
常診斷專家系統技術先期研究 專家系統可行性研究技術報
告」,工業技術研究院,1990。
66. 周政璋、林光甫,「專家系統在電腦整合製造系統(CIMS)之應
用技術 CLIPS 原始碼解析技術報告」,工業技術研究院,1991。
67. 陳凱瀛,「生產單元控制器設計報告書」,工業技術研究院,
1997。
68. 陳凱瀛 「監控系統規劃與設計(Design of shop floor control systems)」,機械工業雜誌 177 期,頁 151~頁 160,1997/12。
69. 郭俊良,吳美珍,「工程智庫應用(The application of
Engineering Knowledge base)」,機械工業雜誌 261 期,頁 173~
頁 191,2004/12。
70. 郭俊良,谷中昭、蔡瑞彬,「規則庫(Rule-Based)推論應用於 生產派工(Rule-Based Inference apply to Production
Dispatching)」,機械工業雜誌 291 期,頁 52~頁 66,2007/6。
71. 梁高榮,「分析層級程序法為基礎之物流專家系統研究報
告」,工業技術研究院,1990。
72. 梁定澎,決策支援系統與企業智慧,松崗電腦圖書有限公司,
1991 年。
73. 曾憲雄、黃國楨、江孟峰、蔡昌均、林耀聰 編著,專家系統 導論/工具/應用,文魁資訊股份有限公司,2002 年。
74. 黃漢邦,「製造單元控制技術研究期末報告」,工業技術研究
院,1991。
75. 資訊工業策進會,「現場排程法則庫建立」,現場排程技術 計劃報告,民國 83 年。
76. 張文琦,「RFID 為基之模組化彈性製造系統單元控制器之設
計與發展」,國立台北科技大學工工程與管理系,碩士論文,
2006 年。
77. 張育仁,「應用於製造系統控制的階層式物件導向裴氏圖模 式的發展」,東海大學工業工程研究所,碩士論文,民國 81 年。
78. 張光復、宮大川,「裴氏網基本理論探討」,工業工程學刊,
第 11 期,,No.1,第 63-83 頁,1999。
79. 劉睦雄、傅立成,「彈性製造系統 HDSS 排程能力之分析、評
估及動態模擬期末研究報告」,工業技術研究院,1991。
80. 劉興煙、陳嘉璋、林光甫、林榮璋、徐逸輝、謝岳勳、張進
群、谷中昭、侯俊傑,「專家系統在電腦整合製造系統(CIMS)
之應用技術 CLIPS 原始碼解析技術報告」,工業技術研究院,
1991。
81. 謝淑華,「無人搬運車系統模式及設施規劃研究報告」,工業
技術研究院,1991。
82. Lin, J. T. and Lee, C. C., “A CTPN-based Scheduler for an FMC
",中國工程學刊,ch2, 1995。
83. Albir, Sinan Si 著,UML 技術手冊,陳志昌 譯,美商歐萊禮 台灣分公司,台北,1999 年。
84. Maleki, Rezaa;著,彈性製造系統,高進鎰、葛自祥譯,高立 圖書有限公司,台北,頁 1-35、頁 121,2000 年。
85. Sprague, Ralph H., Carlson, Eric D.著; 決策支援系統,梁定澎 譯,松崗圖書有限公司,台北,1983 年。