• 沒有找到結果。

[PDF] Top 20 Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence

Has 10000 "Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence" found on our website. Below are the top 20 most common "Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence".

Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence

Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence

... of two compo- nents: a common component and a unique component which are fabricated on machine 1 and then assembled on machine ...processed in batches preceded by ... See full document

17

Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence

Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence

... Information and Finance Management, National Chiao Tung University, Hsinchu, Taiwan This paper discusses a two-stage assembly-type flowshop scheduling problem with batching ... See full document

7

Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence

Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence

... develops a two-phase dynamic programming framework without including any temporal parameters as state ...present a concept that a feasible schedule can be divided into several specific ... See full document

11

Coupled-task scheduling on a single machine subject to a fixed-job-sequence

Coupled-task scheduling on a single machine subject to a fixed-job-sequence

... r a c t This paper investigates single-machine coupled-task scheduling where each job has two tasks separated by an exact ...to a given job ...construct a feasible ... See full document

9

Two-machine flowshop scheduling with bicriteria problem

Two-machine flowshop scheduling with bicriteria problem

... quality for each job number is above ...quality for each job number is slightly lower, but above ...underestimated in this situation. In summary, the average solution quality ... See full document

16

Two-machine flowshop batching and scheduling

Two-machine flowshop batching and scheduling

... unique and represents a discrete ...onto a pallet to be transferred to the second stage for further ...to a batch. Pallets are installed and removed by a robot before ... See full document

13

Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type

Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type

... minimization in a two-stage differentiation flowshop where the sequences of jobs per type are ...The two-stage differentiation flowshop consists of a stage-1 common machine ... See full document

5

Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times

Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times

... 4. Fixed sequences In this section, we consider a simplified situation where the sequences of both types of jobs are fixed, ...i.e., two independent pre- determined sequences are ... See full document

10

Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations

Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations

... from a discrete uniform distribu- tion over 1 to ...algorithms for small job-sized problems In order to test the efficiency of the proposed corollary and the lower bound, a ... See full document

13

A two-machine flowshop problem with processing time-dependent buffer constraints-An application in multimedia presentations

A two-machine flowshop problem with processing time-dependent buffer constraints-An application in multimedia presentations

... have a quality multimedia presentation through networks, its presentation lag needs to be ...techniques for optimizing the object sequence in a prefetch-enabled TV-like ...one ... See full document

18

Bi-criteria minimization for the permutation flowshop scheduling problem with machine-based learning effects

Bi-criteria minimization for the permutation flowshop scheduling problem with machine-based learning effects

... jobs with a longer processing time. They brought in a sum-of-job-processing-time-based learning effect scheduling model and showed that the makespan and the total ... See full document

11

Family-based Scheduling Rule of a Sequence Dependent Wafer Fabrication System

Family-based Scheduling Rule of a Sequence Dependent Wafer Fabrication System

... Family-Based Scheduling Rules of a Sequence-Dependent Wafer Fabrication System Ching-Chin Chern and Yu-Lien Liu Abstract—Consider the dispatch problem for a wafer fab- ... See full document

11

An Approach of Flowshop Scheduling with Identical Parallel Machine Consideration 蔡碧芳、駱景堯

An Approach of Flowshop Scheduling with Identical Parallel Machine Consideration 蔡碧芳、駱景堯

... parallel machine flowshop scheduling problem in which the dependent setup time is taken into account is considered with minimization of total ...addressed flowshop ... See full document

2

Flowshop Scheduling Problem to minimize total completion time with Random and Bounded Processing Times

Flowshop Scheduling Problem to minimize total completion time with Random and Bounded Processing Times

... . For a two-machine flowshop problem F2|a j,m pt j,m pb j,m |C max , Allahverdi and Sotskov 21 found sufficient conditions when transposition of two jobs minimizes ... See full document

10

Resource-constrained flowshop scheduling with separate resource recycling operations

Resource-constrained flowshop scheduling with separate resource recycling operations

... problem with the resource recycling issue incorporated is due to Lin and Huang ...[16]. In previous studies of resource-constrained scheduling, once a job is completed, the ... See full document

7

Minimizing weighted earliness and tardiness penalties in single-machine scheduling with idle time permitted

Minimizing weighted earliness and tardiness penalties in single-machine scheduling with idle time permitted

... the job sequence is ...best sequence. However, this two-stage procedure (that is, of finding a good job sequence into which to insert idle time) may not produce an optimal ... See full document

21

Bicriteria scheduling in a two-machine permutation flowshop

Bicriteria scheduling in a two-machine permutation flowshop

... bounds and the new scheme, we circumvent this problem and use computational experiments to investigate the efficiency ...codes in C language and performed the experiments under the Linux Red ... See full document

16

A single-machine bi-criterion scheduling problem with two agents

A single-machine bi-criterion scheduling problem with two agents

... s and R to the performance of the branch-and- bound algorithm were ...those in Table 1, except the job size was fixed at 12. The mean and the standard deviation of the number of nodes ... See full document

11

A particle swarm optimization for multi-objective flowshop scheduling

A particle swarm optimization for multi-objective flowshop scheduling

... Many flowshop scheduling problem studies have been conducted in the ...makespan). In the real world, there exist other objectives, such as minimization of machine idle time that might ... See full document

10

Application of Ant Colony in Flowshop Scheduling with Unrelated Parallel Machine 林熙凱、駱景堯

Application of Ant Colony in Flowshop Scheduling with Unrelated Parallel Machine 林熙凱、駱景堯

... solve a flowshop scheduling problem with unrelated parallel ...processing and dependent removal times are taken into account as well. Two kinds of ACO based heuristics are ... See full document

2

Show all 10000 documents...