A Study on Identfying Core Competency of a Project Manager using AHP-A Case of Construction Industry

張鳳玉、曾清枝

E-mail: 9900549@mail.dyu.edu.tw

ABSTRACT

Project Management is the most commonly used method for the industry to compete in the ever-changing market. The competency of the project manager is the key factor to the success of the project. This study aims to explore the essence of project manager core competency in construction industry, and has developed a total of 13 core competency measurement indicators upon referring to relevant project management literature. These 13 indicators are found to fall under four major perspectives, including “professional knowledge and experience”, “management skill”, “interpersonal relationship “, and “system integration skill”. This study uses analytic hierarchy process to analyze and has found the importance ranking and relative weights for all measurement indicators.

The empirical results show that the order of the most important core competencies of project manager are: “interpersonal

relationship”, “professional knowledge and experience”, “management skill”, and “system integration skill”. Among the 13 measurement indicators, the top five indicators which project managers valued most are “communication skill”, “practical experience”, “leadership”, “coordination”, and “integration skill”. Therefore, the finding of the study has shown that the most important ability of the project manager in construction industry is “interpersonal relationship “.

Keywords : project management, project manager, analytic hierarchy process, core competency, construction Industry, systems approach

Table of Contents

內 容 目 錄 中文摘要 ...iii 英文摘要 ...iv 誌謝辭 ...v 內容目錄 ...vi 表目錄 ...viii 圖目錄 ...ix 第一章 緒

論...1 第一節 研究背景與動機...1 第二節 研究目的...3 第三節 研究流

程...3 第二章 文獻探討...6 第一節 專案經理應具備能力...6 第二節 關鍵核心能力之內 涵...9 第三節 關鍵核心能力的衡量指標...17 第三章 研究方法...22 第一節 研究架

構...22 第二節 研究方法...24 第三節 問卷之設計...33 第四節 調查方法與對 象...33 第四章 研究結果與分析...36 第一節 問卷發放結果...36 第二節 問卷結果與分 析...37 第五章 研究結論與建議...46 第一節 研究結論...46 第二節 研究限

制...47 第三節 研究建議與未來研究方向...48 參考文獻 ...49 附錄 A 探討專案經理核 心能力之研究-以營建業為例. 57

REFERENCES

一、中文部份 Heerkens, G. R. (2002),專案管理立即上手(丁惠民譯),台北:美 商麥格羅 希爾股份有限公司,(原文於 2001 年出版)。 左 麗玲(2007),左麗玲精確選才,提升寶來戰鬥力,工商時報[線 上資料],來源: http://www.ctjob.com.tw/[2007, September 17]。 李宗儒,

鄭正鑫(1996),以分析層級程序法擬定物流中心之成功營 運因素,台灣經濟,236,43。 吳生生(1982),專案管理與專案經理之計劃管制 功能,國立中山大 學企業管理研究所未出版之碩士論文。 吳?輝(1999),運用模糊層級分析於管理才能評鑑模式之研究,國 立中山大學 人力資源管理研究所未出版之碩士論文。 林欽榮(2001),人際關係與溝通,台北:揚智文化。 張春興(2005),現代心理學,台北:東華書局

。 張超建(2007),HR與營運主管對於核心職能規劃應有的正確思維 [線上資料],來源: http://asia-learning.com/[2007, September 30]。 - 50 - 郭啟瑞(2005),國小學童依附關係與人際關係、生活適應之研究, 國立台南大學教育學系研究所未出版之碩士論文。 許如欽(2005)

,專案負責人能力、專案執行力與專案效益之探討- 以政府專案計畫為例,中山管理評論,13(1),247-278。 許國清(1998),不同專案 群組下,專案經理人特性對專案績效之影 響,私立靜宜大學企業管理學系研究所未出版之碩士論文。 黃玲娟(2006),應用模糊積分層級 分析法探討核心職能-以美容業 為例,私立大葉大學事業經營研究所未出版之碩士論文。 董玉娟(2004),知識分享意願影響前因之研 究:威脅之情境效果。 人力資源管理學報,4(3),117-137。 劉晏孜(2008),金融專業人才應具備核心能力之研究,文大商管學 報,13(2)

,47-70。 廖述良(2001, July 5),系統分析概論,發表於環境系統動力學理論 與應用研習會,中壢:國立中央大學。 鄧振源,曾國雄(1989)

,層級分析法的內涵特性與應用(上),中國 統計學報,27(6),5-22。 鄧振源,曾國雄(1989),層級分析法的內涵特性與應用(下),中國 統 計學報,27(7),1-20。 - 51 - 鄧振源(2005),計畫評估-方法與應用(2 版),基隆:海洋大學運 籌規劃與管理研究中心。 藍兆宏(2007),半

(2)

導體產業研發主管核心職能之研究,私立中國科 技大學運籌管理研究所未出版之碩士論文。 二、英文部份 Anderson, S. D., & Tucker, R.

L. (1994). Improving Project Manage- ment of Design. Journal of Management in Engineering, 10(4), 35-44. Archibald, R. B. (1981). The Implementation of Project Management: The Professional’s Handbook. Massachusette: Addision-Wesley, 178. Barczak, G., & Wilemon, D.

(1989). Leadership Differences In New Product Development Teams. Journal of Product Innovation Management, 6, 259-267. Bommer, M., Delaporte, R., & Higgins, J. (2002). Skunlworks Ap- proach to Project Management. Journal of Management in En- gineering, January, 21-28.

Cleland, D. I., & King, W. R. (1983). System analysis and Project Management. New York: McGraw-Hill, Inc. - 52 - Czuchry, A. J., & Yasin, M.

M. (2003). Managing the Project Man- agement Process. Industrial Management & Data Systems, 103 (1), 39-46. Dewey, J. (1916). Democracy and education. New York: The Mac- millan Company, 26-27. Elmes, M., & Wilemon, D. (1988). Organizational Culture and Project Leader

Effectiveness. Project Management Journal, 19(4), 54-62. Harrison, F. L. (1993). Advanced Project Management. Aldershot Hants, England:

Gower. Jiang, J. J., Gary, K., & Steve, M. (1998). Important Behavioral Skills for IS Project Managers: The Judgments of Experienced IS Pro- Fissional. Project Management Journal, 29(1), 39-43. Katz, R. L. (1955). Skills of an Effective Administrator. Harvard Business Review, 33(1), 33-42. Kendra, K., & Taplin, L. J. (2004). Project Success: A Cultural Framework. Project Management Journal, 35(1), 30-45. Kerzner, H. (1984).

Project Management: A System approach to Planning (2nd ed.). New York: Van Nostrand Reinhold Co. Inc. - 53 - Kerner, H. (1989). Project Management: A System Approach to Plan- ning, Scheduling and Controlling (3rd ed.). New York: Van Norstrand Reinhold Co. Inc. Kerzner, R.

T. (1979). Project Management: A System Approach to Planning, Scheduling and Controlling. New York: Van Nor- strand Reinhold Co. Inc.

Lawerence, P. R., & Lorsch, J. W. (1967). New Management Job: the Integrator. Harvard Business Review, 45, 142-151. Lewis, J. P. (1998).

Mastering Project Mangement. New York: McGraw-Hill Co. Inc. Lock, D. (1994). Project Management, Brookfield Vt. England: Gower Publishing Company. Mann, F. C. (1965). Toward an Understanding of the Leadership Role in Formal Organization, Leadership and Productivity. In R. Du- bin, G. C. Homans, F. C. Mann & D. C. Miller (Eds.), Leader- ship and productivity (pp. 68-303). San Francisco:

Chandler. Meredith, J. R., & Mantel, S. J. (1989). Project Management: A Ma- gerial Approach (2nd ed.). Singapore: John Wiley & Sons.

Meredith, J. R., & Mantel, S. J. (1995). Project Management: A Ma- nagerial Approach (3rd ed.). Singapore: John Wiley & Sons. - 54 - Moder, J. J.

(1988). Network Techniques in Project Management, Project Management Handbook(2nd ed.). New York: D. I. Cleland & W. R. King. Morris, P.

W. G. (1988). Management Project Interfaces. In D. I. Clel- and & W. R. King. (Eds.), Project Management Handbook, (2nd ed.) (pp. 16-81). New York: Van Nostrand Reinhold Co. Morris, P. W. G., & Hough, G. (1987). The Anatomy of Major Projects: A Study of the Reality of Project Management. England: Wiley Chichester. Nicholas, J. M. (1990). Managing Business and Engineering Projects. New Jersey: Prentice-Hall. Pinto, J.

K., & Covin, J. G. (1989). Critical Factors in Project Imple- mentation: A Comparison of Construction and R&D Projects. Technovation, 9, 49-62.

Pinto, K., & Slevin, D. P., (1987). Critical Factors in Successful Project Management. IEEE Transaction on Engineering, 34 (1), 22-27. Polanyi, M.

(1966). The tacit dimension. London: Doubleday Pub- lishing. Poser, B. Z. (1986). What’s All the Fighting About Conflicts in Project - 55 - Management. IEEE Transactions on Engineering Management, 33 (4), 207-211. Project Management Institute (2004). A Guide to the Project Man- agement Body of Knowledge:Pmbok Guide (3rd ed ). Newtown Square, Pennsylvania: Author. Saaty, T. L. (1980). The Analytic Hierarchy Process. New York: McGraw-Hill. Shenhar, A. J., & Wideman R. M. (2000). Optimizing Project Success by Matching PM Style with Project Type [Online]. Available: http://www.pmforum.org [2001, June 20] Souder, W. E., & Song, X. M. (1998). Analyses of U.S. and Japanese Management Processes Associated with New Product Success and Failure in High and Low Familiarity Markets. Journal of Product Innovation Management, 15, 208-223. Tavares, L. V. (2002). A Review of the Contribution of Operational Research to Project Management. European Journal of Opera- tional Research, 136, 1-18. Thamhain, H. J., & Wilemon, D. L. (1975). Conflict Management in Project Cycle Life Cycles. Sloan Management Review, 16(3), 31-50. Thusman, M. (1978). Technical Communication in R&D Laboratories: The Impact of Project Work Characteristics. Academy of Man- agement Journal, 21(4), 624-645. Zimmerer, T. W., & Yashin, M. M. (1998). A leadership Profile of American Project Managers. Project Management Journal, 7, 867-883.

參考文獻

相關文件

The core indicators of the environmental management dimension include: (1) the commitment of the administers on sustainable development; (2) the establishment of a school

The core of this research is focusing on Service Innovation, discussing on the composite factors of manufacturing servitization through literatures and questionnaires from

The fist type of photonic crystal fiber is composed of a solid silica core with modulation core refractive index and a cladding with triangular lattice elliptical air holes,

Keywords: Professional construction management, international project management, case study, ethnographic survey.. Due to the increasing scale and complexity of public

This study has analyzed 13 bidding cases of different bidding mechanisms in high tech plant construction projects in the past, and hoping to establish a fair mechanism in

This study aims to explore whether the service quality and customer satisfaction have a positive impact on the organizational performance of the services and whether the

The effect of gender on motivation and student achievement in digital game-based learning: A case study of a contented-based classroom. Using game-based learning to

Therefore, this study aims to analyze a manufacturer's competitiveness from the viewpoints of cold chain equipment manufacturers through a case the with five forces