• 沒有找到結果。

2014年歐洲盃十項全能能源屋競賽(Solar Decathlon Europe 2014)—交大蘭花屋(Orchid House)計畫 D#7 Project Drawing 設計施工圖

N/A
N/A
Protected

Academic year: 2022

Share "2014年歐洲盃十項全能能源屋競賽(Solar Decathlon Europe 2014)—交大蘭花屋(Orchid House)計畫 D#7 Project Drawing 設計施工圖"

Copied!
328
0
0

加載中.... (立即查看全文)

全文

(1)Deliverable #7 November 3nd 2014. National Chiao Tung University 1001 TA HSUEH ROAD, HSINCHU, TAIWAN 30010 Phone: +886-3-5718083 www.sde.tw facebook.com/twsde twitter.com/NCTU_UNICODE.

(2) 1. E. D. C. B. A. 1. GENERAL GE-001 GE-101 GE-102 GE-103 GE-201 GE-211 GE-301 GE-310 GE-311 GE-320 GE-330 GE-401 GE-402. 2. 3. Cover Sheet Sheet List 1 Sheet List 2 Sheet List 3 General Symbols General Abbreviations Urban Project Location Urban Proposal Explanation 1 Urban Proposal Explanation 2 Existing Building Drawings and Analysis Competition Dwelling Pavilion East Side Rendering Pavilion West Side Rendering. 1 2 3 4 5 6 7 8 9 10 11 12 13. 2. ARCHITECTURAL AR-001 La Cité du Soleil® Plan AR-002 Site Plan AR-011 Solar Envelope AR-014 Architecture Footprint AR-017 Measurable Area AR-021 Ground Level Plan AR-022 Mezzanine Level Plan AR-031 Roof Level Plan AR-041 Reconfigurable Feature 1 AR-042 Reconfigurable Feature 2 AR-043 Reconfigurable Feature 3 AR-044 Reconfigurable Feature 4 AR-051 Site Entrance and Exit AR-101 Site Elevation AR-111 East Elevation AR-112 North Elevation AR-113 South Elevation AR-114 West Elevation AR-201 Longitudinal Section 1 AR-202 Longitudinal Section 2 AR-203 Longitudinal Section 3 AR-211 Transversal Section 1 AR-212 Transversal Section 2 AR-213 Transversal Section 3 AR-301 Window Schedule and Details 1 AR-302 Window Schedule and Details 2 AR-303 Window Schedule and Details 3 AR-304 Window Schedule and Details 4 AR-305 Window Schedule and Details 5 AR-306 Window Schedule and Details 6 AR-307 Window Schedule and Details 7 AR-308 Window Schedule and Details 8 AR-309 Window Schedule and Details 9 AR-311 Door Schedule and Details 1 AR-312 Door Schedule and Details 2 AR-321 Floor Construction Ground Level AR-322 Floor Construction Mezzanine Level AR-323 Floor Construction Details Ground Level 1 AR-324 Floor Construction Details Ground Level 2 AR-325 Floor Construction Details Ground Level 3 AR-326 Floor Construction Details Ground Level 4 AR-327 Floor Construction Details Ground Level 5 AR-328 Floor Construction Details Mezzanine Level 1 AR-329 Floor Construction Details Mezzanine Level 2 AR-330 Floor Construction Details Mezzanine Level 3 AR-331 Floor Construction Details Mezzanine Level 4 AR-332 Ceiling Construction Details Mezzanine Level 1 AR-333 Ceiling Construction Details Mezzanine Level 2 AR-334 Ceiling Construction Details Mezzanine Level 3 AR-336 Roof Construction Details AR-341 Wall Sections and Construction Details 1 AR-351 Partitions Details 1. 2. 4. 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 3. AR-361 AR-362 AR-363 AR-364 AR-371 AR-372 AR-401 AR-402 AR-403 AR-404 AR-411 AR-421 AR-422 AR-431 AR-432 AR-433 AR-434 AR-435 AR-436 AR-437 AR-438 AR-439 AR-440 AR-441. 5. 6. Joints Details 1 Joints Details 2 Joints Details 3 Joints Details 4 Stair Details 1 Stair Details 2 Green Core Details 1 Green Core Details 2 Green Core Details 3 Green Core Details 4 Blue Wall Details Smart Skin Details 1 Smart Skin Details 2 Thermal Wall Details 1 Thermal Wall Details 2 Thermal Wall Details 3 Thermal Wall Details 4 Thermal Wall Details 5 Thermal Wall Details 6 Thermal Wall Details 7 Thermal Wall Details 8 Thermal Wall Details 9 Thermal Wall Details 10 Thermal Wall Details 11. 7. 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89. 3. BIOCLIMATIC ANALYSIS (BA) BA-001 Taipei Climate Analysis BA-002 Taipei Shading Analysis BA-003 Taipei Wind Rose Analysis BA-004 Versailles Climate Analysis BA-005 Versailles Shading Analysis BA-006 Versailles Wind Rose Analysis BA-011 Bioclimatic Strategies BA-012 Natural Ventilation BA-013 Solar Chemny BA-014 Earth/Vegetation cooling BA-015 Evaporative Cooling BA-016 Direct Solar Heating BA-017 Bioclimatic Drawings Heating BA-018 Thermal Wall in Versailles BA-019 Thermal Wall in Taipei BA-020 Heat Exchanger Preheated by Solar Hot Water BA-021 Heat Pump. 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106. 4. INTERIORS (IN) IN-001 Ground Level Floor IN-002 Mezzanine Level Floor IN-101 Reflected Ceiling IN-201 Interior Elevation 1 IN-202 Interior Elevation 2 IN-203 Interior Elevation 3 IN-204 Interior Elevation 4 IN-205 Interior Elevation 5 IN-211 Interior Elevation 6 IN-212 Interior Elevation 7 IN-301 Ground Level Furnishings IN-302 Mezzanine Level Furnishings IN-401 Kitchen Plan 1 IN-402 Kitchen Plan 2 IN-411 Kitchen Elevations IN-421 Kitchen Section 1 IN-422 Kitchen Section 2 IN-423 Kitchen Section 3 IN-501 Bathroom Plan IN-511 Bathroom Elevations. 107 108 109 110 111 112 112 114 115 116 117 118 119 120 121 122 123 124 125 126. Project:. E. Institution:. Team Name: Address:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. D. Contact:. Consultants:. C. Note:. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. ST. Checked by. -. Scale. -. Unit. -. DWG. Title A. SHEET LIST 1 DWG. No.. GE-101 4. 5. 6. 7. PAGE. 2.

(3) 1. E. D. C. B. A. IN-601 IN-602 IN-603 IN-604 IN-701 IN-711 IN-721. 2. 3. Interior Rendering Entrance Interior Rendering Living Room Interior Rendering 2nd Floor Interior Rendering View From Terrace Workstation Plan Workstation Elevations Workstation Sections. 4. 127 128 129 130 131 132 133. 5. STRUCTURAL (ST) ST-001 Foundation Plan and Details ST-002 Structural Floor Unit ST-011 Structural Ground Level Plan ST-012 Structural Mezzanine Level Plan ST-013 Structural Elements Marking Ground Level Plan ST-014 Structural Elements Marking Mezzanine Level Plan ST-021 Structural Roof Plan ST-022 Structural Roof Units ST-023 Structural Elements Marking Roof Plan ST-101 Structural Longitudinal Sections Frame 1 ST-102 Structural Longitudinal Sections Frame 2 ST-103 Structural Longitudinal Sections Frame 3 ST-104 Structural Longitudinal Sections Frame 4 ST-111 Structural Transversal Sections Frame A ST-112 Structural Transversal Sections Frame A-3 ST-113 Structural Transversal Sections Frame A-4 ST-114 Structural Transversal Sections Frame B ST-115 Structural Transversal Sections Frame B-1 ST-116 Structural Transversal Sections Frame C ST-117 Structural Transversal Sections Frame C-1 ST-118 Structural Transversal Sections Frame D ST-201 Structural Blow ups ST-301 Structural Details ST-302 Structural Details Axon ST-401 Structural Axon. 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158. 6. FIRE PROTECTION (FP) FP-001 Fire Protection Details FP-002 Fire Protection : Ground Level FP-003 Fire Protection : Mezzanine Level FP-004 Fire Protection Evacuation Path : Ground Level FP-005 Fire Protection Evacuation Path : Mezzanine Level. 159 160 161 162 163. 7. PLUMBING (PL) PL-001 Plumbing Supply and Removal Ground Level Plan. PL-002 Plumbing Supply and Removal Ground Mezzanine Plan. PL-011 Gray Water Ground Level PL-012 Gray Water Mezzanine Level PL-021 Drain / Waste / Vent PL-031 Containers and Fill Locations PL-101 Schematic diagram in Taiwan PL-102 Schematic diagram in Competition PL-201 Supply and removal Clean Water Isometric PL-202 Supply and removal Hot Water Isometric PL-211 Grey water Isometric PL-221 Drain/Waste/Vent Isometric PL-301 Green Core Irrigation Plan PL-302 Green Core Irrigation Elevation 1 PL-303 Green Core Irrigation Elevation 2. 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178. 8. SOLAR WATER HEATING (SW) SW-001 Solar Water Plan SW-101 Solar Water Isometric SW-201 Solar Water Schematic. 179 180 181. 9. MECHANICAL (ME) ME-001 HVAC Distribution Plan Ground Level ME-002 HVAC Distribution Plan Mezzanine Level ME-011 HVAC equipment 1. 182 183 184. 1. 2. ME-012 ME-021 ME-031 ME-041 ME-042 ME-101 ME-201 ME-211 ME-212 ME-221 ME-222 ME-231 ME-232 ME-301 ME-302. 5. 6. HVAC equipment 2 Heating Cooling Ventilation 1 Ventilation 2 Mechanical room elevations HVAC System Schematic drawings Heating mode Schematic drawings 1 Heating mode Schematic drawings 2 Cooling mode Schematic drawings 1 Cooling mode Schematic drawings 2 Controls 1 Controls 2 Isometric Distribution 1 Isometric Distribution 2. 7. 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199. 10. ELECTRICAL (EL) EL-001 Grid interconnection EL-201 DC wiring diagram EL-301 Power Plan Ground Level EL-302 Power Plan Mezzanine Level EL-401 Lighting Plan Site EL-402 Lighting Plan Ground Level EL-403 Lighting Plan Mezzanine Level EL-501 One-line Diagram 1 EL-502 One-line Diagram 2 EL-503 One-line Diagram 3 EL-601 AC Circuit layout EL-602 AC Circuit layout EL-603 AC Circuit layout. 200 201 202 203 204 205 206 207 208 209 210 211 212. 11. PHOTOVOLTAIC SYSTEM (PV) PV-001 Photovoltaic System: General 1 PV-002 Photovoltaic System: General 2 PV-003 Photovoltaic System: General 3 PV-011 Photovoltaic System: DC circuits PV-021 Photovoltaic System: AC citcuits PV-031 Photovoltaic System: grounding system PV-041 Photovoltaic System: Module Layout PV-042 Photovoltaic System: Module String Layout. 213 214 215 216 217 218 219 220. Project:. E. Institution:. Team Name: Address: D. Contact:. Consultants:. C. Note:. 12. TELECOMMUNICATIONS AND BUILDING AUTOMATIZATION SYSTEM (BAS) BAS-001 Wiring Plan Ground Level 221 BAS-002 Wiring Plan Mezzanine Level 222 BAS-101 Schematic diagram 1 223 BAS-102 Schematic diagram 2 224 BAS-201 Equipment 1 225 BAS-202 Equipment 2 226 13. SDE INSTRUMENTATION DRAWINGS (ID) ID-001-1 General Monitoring Ground Level ID-001-2 General Monitoring Mezzanine Level ID-002 Monitoring Panel Room ID-003-1 Electricity Meters Topology 1 ID-003-2 Electricity Meters Topology 2 ID-004 Electricity Meters Connection ID-005-1 House Appliances Ground Level ID-005-2 House Appliances Mezzanine Level. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. B. 227 228 229 230 231 232 233 234. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. ST. Checked by. -. Scale. -. Unit. -. DWG. Title A. SHEET LIST 2 DWG. No.. 3. GE-102 4. 5. 6. 7. PAGE. 3.

(4) 1. E. D. C. B. A. 2. 3. 14. SITE OPERATION (SO) SO-001 Trucks shipment 1 SO-011 Trucks Shipment During Assembly Phase 1 SO-012 Trucks Shipment During Assembly Phase 2 SO-013 Trucks Shipment During Assembly Phase 3 SO-014 Trucks Shipment During Assembly Phase 4 SO-015 Trucks Shipment During Assembly Phase 5 SO-021 Trucks Shipment During Disassembly Phase 1 SO-022 Trucks Shipment During Disassembly Phase 2 SO-023 Trucks Shipment During Disassembly Phase 3 SO-024 Trucks Shipment During Disassembly Phase 4 SO-025 Trucks Shipment During Disassembly Phase 5 SO-101 La Cité du Soleil® Plan SO-102 Assembly Lot Plan SO-103 Disassembly Lot Plan SO-201 Assembly Phase 1 SO-202 Assembly Phase 2 SO-203 Assembly Phase 3 SO-204 Assembly Phase 4 SO-205 Assembly Phase 5 SO-206 Assembly Phase 6 SO-207 Assembly Phase 7 SO-208 Assembly Phase 8 SO-209 Assembly Phase 9 SO-210 Assembly Phase 10 SO-301 Disassembly Phase 1 SO-302 Disassembly Phase 2 SO-303 Disassembly Phase 3 SO-304 Disassembly Phase 4 SO-305 Disassembly Phase 5 SO-306 Disassembly Phase 6 SO-307 Disassembly Phase 7 SO-308 Disassembly Phase 8 SO-309 Disassembly Phase 9 SO-310 Disassembly Phase 10 SO-401 Assembly Lot Plan Truck 01 SO-402 Assembly Lot Plan Truck 02 SO-403 Assembly Lot Plan Truck 03 SO-404 Assembly Lot Plan Truck 04 SO-405 Assembly Lot Plan Truck 05 SO-406 Assembly Lot Plan Truck 06 SO-407 Assembly Lot Plan Truck 07 SO-408 Assembly Lot Plan Truck 08 SO-409 Assembly Lot Plan Truck 09 SO-410 Assembly Lot Plan Truck 10 SO-411 Assembly Lot Plan Truck 11 SO-412 Assembly Lot Plan Truck 12 SO-413 Assembly Lot Plan Truck 13 SO-414 Assembly Lot Plan Truck 14 SO-415 Assembly Lot Plan Truck 15 SO-501 Disassembly Lot Plan Truck 01 SO-502 Disassembly Lot Plan Truck 02 & 03 SO-503 Disassembly Lot Plan Truck 04 SO-504 Disassembly Lot Plan Truck 05 SO-505 Disassembly Lot Plan Truck 06 SO-506 Disassembly Lot Plan Truck 07 SO-507 Disassembly Lot Plan Truck 08 SO-508 Disassembly Lot Plan Truck 09 & 10 SO-509 Disassembly Lot Plan Truck 11 SO-510 Disassembly Lot Plan Truck 12 SO-511 Disassembly Lot Plan Truck 13 SO-512 Disassembly Lot Plan Truck 14 SO-513 Disassembly Lot Plan Truck 15 & 16. 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296. 2. HS-201 HS-301 HS-302 HS-303 HS-401 HS-402 HS-403 HS-404 HS-405 HS-406 HS-407 HS-408 HS-409 HS-410 HS-501 HS-601 HS-602 HS-603 HS-604 HS-605 HS-606 HS-607 HS-608 HS-609 HS-610. 5. 6. Health and Safety during the Inside Logistic Health and Safety during load / unload Health and Safety Signposting Health and safety PPE Health and Safety during Assembly Phase 1 Health and Safety during Assembly Phase 2 Health and Safety during Assembly Phase 3 Health and Safety during Assembly Phase 4 Health and Safety during Assembly Phase 5 Health and Safety during Assembly Phase 6 Health and Safety during Assembly Phase 7 Health and Safety during Assembly Phase 8 Health and Safety during Assembly Phase 9 Health and Safety during Assembly Phase 10 Health and Safety during Maintenance Health and Safety during Disassembly Phase 1 Health and Safety during Disassembly Phase 2 Health and Safety during Disassembly Phase 3 Health and Safety during Disassembly Phase 4 Health and Safety during Disassembly Phase 5 Health and Safety during Disassembly Phase 6 Health and Safety during Disassembly Phase 7 Health and Safety during Disassembly Phase 8 Health and Safety during Disassembly Phase 9 Health and Safety during Disassembly Phase 10. 7. 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324. Project:. E. Institution:. Team Name: Address:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. D. Contact:. Consultants:. 16. PUBLIC TOUR (PT) PT-001 Site accessibility Plan PT-002 Site accessibility Elevation PT-101 House Tour Plan PT-201 House Tour General Information. 325 326 327 328 C. Note:. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. ST. Checked by. -. Scale. -. Unit. -. DWG. Title A. SHEET LIST 3 DWG. No.. 15. HEALTH AND SAFETY (HS) HS-001 Health and Safety in the lot and surroundings 1 HS-002 Health and Safety in the lot and surroundings 2 HS-101 Health and Safety during the Outside Logistic 1. 4. 297 298 299 3. GE-103 4. 5. 6. 7. PAGE. 4.

(5) 1. 2. 3. 4. 5. 6. 7. Project:. GENERAL SYMBOLS E. E. DWG SHEET DWG. DWG. SHEET. SHEET. RECESSED DN LIGHT. ELEVATION MARK. Institution:. WATERPROOF RECESSED DN LIGHT. SHEET DWG. DWG. S. SPRINKLER. D. SMOKE DETECTOR. A. SMOKE ALARM. SECTION MARK. SHEET. Team Name: Address:. D. D. NAME GWG.. ROOM TAG. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. FIRE EXTINGUISHER. FE. Consultants:. EXIST SIGN. EXIST. EXIST DIRECTION GRID NUMBER. No.. C. C. Note: xx xx. EL ±0. ELEVATION MARKER. 4. 1. XX DWG. 3. INTERIOR ELEVATION MARKER. 2. B. DOOR #. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. DOOR TAG. SS. Checked by. DN. Scale. -. Unit. -. DWG. Title A. A. WIN#. WINDOW TAG. GENERAL SYMBOLS DWG. No.. GE-201 1. 2. 3. 4. 5. 6. 7. PAGE. 5.

(6) 1. 2. 3. 4. 5. 6. 7. GENERAL ABBREVIATIONS. E. D. C. B. Project:. # Pound: OR Number &: And @: At ACT: Acoustic Ceiling Tile AD: Area Drain AFF: Above Finished Floor ALUM: Aluminum ANOD: Anodized BSMT: Basement BYND: Beyond BOT: Bottom CIP: Cast In Place CHNL: Channel CJ: Control Joint CLG: Ceiling CLR: Clear CMU: Concrete Masonry Unit COL: Column COMPR: Compressible CONC: Concrete CONT: Continuous CPT: Carpet CT: Ceramic Tile CTYD: Courtyard DBL: Double DEMO: Demolish or Demolition DIA: Diameter DIM: Dimension DIMS: Dimensions DN: Down DR: Door DWG: Drawing EA: Each EJ: Expansion Joint EL: Elevation ELEC: Electrical ELEV: Elevator or Elevation EPDM: Ethylene Propylene Diene M-Class (Roofing) EQ: Equal EXIST: Existing EXP JT: Expansion Joint EXT: Exterior FD: Floor Drain or Fire Department FEC: Fire Extinguisher Cabinet FIXT: Fixture FLR: Floor FM: Filled Metal FO: Face Of FND: Foundation GA: Gauge GALV: Galvanized GWB: Gypsum Wall Board HC: Hollow Core HI: High HM: Hollow Metal HP: High Point HR: Hour HVAC: Heating, Ventilating, And Air Conditioning IRGWB: Impact Resistant Gypsum Wall Board ILO: In Lieu Of INSUL: Insulated or Insulation INT: Interior LO: Low. MAX: Maximum MO: Masonry Opening MECH: Mechanical MEMBR: Membrane MIN: Minimum MRGWB: Moisture-Resistant Gypsum Wall Board MTL: Metal NIC: Not In Contract NO: Number NOM: Nominal OC: On Center OH: Opposite Hand OZ: Ounce PCC: Pre-Cast Concrete PLUMB: Plumbing PLYD: Plywood PT: Pressure Treated PNT: Paint or Painted PVC: Polyvinyl Chloride RBR: Rubber RCP: Reflected Ceiling Plan RD: Roof Drain REQD: Required RM: Room SIM: Similar SPEC: Specified OR Specification SPK: Sprinkler or Speaker SSTL: Stainless Steel STC: Sound Transmission Coefficient STL: Steel STRUCT: Structure or Structural T&G: Tongue And Groove TELE: Telephone TLT: Toilet TO: Top Of TOC: Top Of Concrete TOS: Top Of Steel TPD: Toilet Paper Dispenser T/D: Telephone/Data TYP: Typical UNO: Unless Noted Otherwise U/S: Underside VIF: Verify In Field VP: Vision Panel W/: With WD: Wood. E. Institution:. Team Name: Address:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. D. Contact:. Consultants:. C. Note:. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. DN. Checked by. DN. Scale. -. Unit. -. DWG. Title A. A. GENERAL ABBREVIATIONS DWG. No.. GE-211 1. 2. 3. 4. 5. 6. 7. PAGE. 6.

(7) 1. 2. 3. 4. 5. 6. 7. INTRODUCTION Taiwan is a country spanning only 36,193 km2 but with a population of 23.34 million (compare with France’s 674,834 km2 and 65.7 million people). The population density is especially high because two-thirds of the island is composed of mountains, and as a result most people live along the coastal areas. It is especially crowded in urban areas, such as the capitol city, Taipei, which is one of the top ten densest cities in the world. In addition to the high population density, Taipei also developed rapidly over the years, both of which contribute to a random assortment of architecture in the city that expands horizontally instead of vertically to conserve space.. E. However, also as a result of the rapid development, many of the residential buildings were not built to last and have infrastructure that is now rundown or outdated. In recent years, new residential buildings are sky scraper apartments, which are usually only affordable by the wealthy upper class because of the luxury design and locations in the city center.. D. This population growth results in the lack of living space and sufficient public amenity, and cause middle classes moving toward the periphery, even outside of city. The majority of these people are young professionals who just graduated from collage whom have worked a few years, and they are not able to afford a house yet. However, most of them works in the city center and commute, and caused major traffic congestions with millions of cars and motorcycle. Consequently, the city is left with a high carbon dioxide pollution, and the decrease living quality.. C. B. Project:. E. Institution:. Team Name: Address: D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. C. Note:. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. ST. Checked by. DN. Scale. -. Unit. -. DWG. Title A. A. Taipei, Taiwan Population: Area: Density: 1. 2. 3. 4. 5. 6. 2,650,900 271.8 km² 9,753 Person/km² 7. Urban Project Location DWG. No.. GE-301. PAGE. 7.

(8) 1. E. 2. 3. 4. 5. 6. 7. Urban Acupuncture. Zero Energy District: Ximending. Taipei city population reached its 20-year peak and residential building has been constructed in various types. The majorities are a duplex apartment, which is relatively wide and 4 to 5 story building, and a row house that is extremely narrow and deep single family owned. These two types were constructed during the modern democracy period. Most of flat-roof duplex apartment and row house are facing problems: leakage, heat absorption and no public facilities. Therefore, the illegal make-shift metal roofed shelters have been introduced widely in most of the residential buildings and create unregulated cityscape of Taipei.. As main focal point of Ximending Zero Energy District plan, NCTU UNICODE proposes not only PV panel implementation to buildings, but also larger scale of renewable energy sources such as CSP (Concentrated Solar Power), Biomass, Wind power and Geothermal. In order for all renewable energy sources to be distributed efficiently, advanced applications of Wide-area-Measurement System (WAMS) is installed one of larger footprint building rooftops, and Data Centre (MDMS) serve all the energy with automation system. Furthermore, AMI (Advanced Metering Infrastructure) is installed to Orchid House Clusters to manage power supply within houses. Please refer Architecture Design Narrative for farther details of AMI integration to housing appliances.. For Orchid House urban design strategy, NCTU UNICODE focus districts where the most of duplex apartment and row house are located as the most needed area for urban regeneration to vitalize not only the residential building, but also these districts.. Project:. E. Institution:. The Orchid House Cluster acts as a pilot project for further development of smart building energy management technology. Eventually, AMI system will be installed to most of buildings in the district to increase 20% energy usage efficiency from conventional grid system.. Team Name: Address:. D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. C. C. Note:. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. RL. Checked by. DN. Scale. -. Unit. -. DWG. Title A. A. URBAN PROPOSAL EXPLANATION 1 DWG. No.. GE-310 1. 2. 3. 4. 5. 6. 7. PAGE. 8.

(9) 1. 2. 3. 4. 5. 6. 7. Orchid Cluster. E. Orchid House extension on existing building in Taipei city plays not only critical role for Ximending zero energy district urban planning, but also to apply new concept of urban regeneration. Almost 50% of residential building in Taipei city are over 30 years old and typically demolished during the renewal planning. However, NCTU UNICODE points out the problem of city re-development organized by government and executed by private developers. The developer tends to acquire larger number of properties to combine the land FAR (Floor Area Ratio) to build up high-rise residential condominium, which is not affordable for average income level and treated as investment target by investors.. Project:. E. Institution:. Orchid House will proved unique opportunity for not only the building owner, but also the targeted tenants, who needs housing support to pursue their young profession to promote new creative industry in Taipei. Team Name: Address: D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. C. C. Note:. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. SC. Checked by. DN. Scale. -. Unit. -. DWG. Title A. A. URBAN PROPOSAL EXPLANATION 2 DWG. No.. GE-311 1. 2. 3. 4. 5. 6. 7. PAGE. 9.

(10) 1. 2. 3. 4. 5. 6. 7. Taipei Residential Type Analysis. Project:. E. E. Single House 7%. Institution:. Community Housing 18%. Row House 20%. Team Name: Address:. D. D. Super Tiny Housing 18%. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. Super Luxury Housing 6%. Comdominium 12% C. C. Note:. Stack Villa 1%. Duplex Apartment 30%. DESCRIPTION Row House and Duplex Apartment are the most number of Taipei residential building Type. These two types are usually 4 to 5 floor high and the oldest building in Taipei, which are about 20 to 30 years old and facing some following problems:. B. B. 1. Top floor Leaking 2. Top floor is too hot 3. No Public Facility. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Presently, most households live in flat-roofed row houses and duplex apartments, but due to a lack of space, people try to expand their living area by building on their roofs.. Drawn by. ST. Checked by. DN. The illegal make-shift metal-roofed shelters that result are unregulated and displeasing to the eye. Lastly, social housing projects have fallen to the wayside and do not adequately consider the needs of disadvantaged groups, social justice, and the problems of housing for those with low-income.. Scale. -. Unit. -. DWG. Title. A. A. EXISTING BUILDING DRAWING AND ANALYSIS DWG. No.. GE-320 1. 2. 3. 4. 5. 6. 7. PAGE. 10.

(11) 1. 2. 3. 4. 5. 6. 7. Cheap & Light Weight Construction Tiny Alley. Rooftop Pavilion. Rooftop Extension. E. Project:. E. Institution:. Team Name: Address: D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. C. C. Note:. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CC. Checked by. DN. Scale. -. Unit. -. DWG. Title A. A. Small-Scale Street. Extended Signboard. Rooftop Garden. Steel Bar Window. Extension Canopy. COMPETITION DWELLING DWG. No.. GE-330 1. 2. 3. 4. 5. 6. 7. PAGE. 11.

(12) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. Team Name: Address: D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. C. C. Note:. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CC. Checked by. DN. Scale. -. Unit. -. DWG. Title A. A. N. PAVILION EAST SIDE RENDERING DWG. No.. GE-401 1. 2. 3. 4. 5. 6. 7. PAGE. 12.

(13) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. Team Name: Address: D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. C. C. Note:. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CC. Checked by. DN. Scale. -. Unit. -. DWG. Title A. A. N. PAVILION WEST SIDE RENDERING DWG. No.. GE-402 1. 2. 3. 4. 5. 6. 7. PAGE. 13.

(14) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. PAR Institution:. S3. UNI. ROM Team Name: Address:. D. S2. LUC. D. BUC. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. S1. OTP. DEL. C. C. Note:. ATC. BAR. N. PLT. B. FNX. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. ST. Checked by. DN. Scale. 1:1000. Unit. SHU. REC. KMU. DWG. Title. A. A. DTU. ROF. mm. CUJ. La Cité du Soleil® PLAN DWG. No.. AR-001 1. 2. 3. 4. 5. 6. 7. PAGE. 14.

(15) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution: 200. 1600. 6075. 3900. 974. 2926. EL ±0 1825. 425. 1650. Makino bamboos. EL +710. Team Name: Address: D. 8600 (5% SLOPE). D. 8850. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. EL +710. C. Note:. EL +430. 600. 1875. C. N Vanilla garden Makino bamboos EL ±0. EL ±0. B. B. Makino bamboos. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by Scale. LOT "S". 1:100. Unit. LOT "Q". LOT "P". -. mm. DWG. Title. A. A. SITE PLAN DWG. No.. 0. 1. 2. 3. 4. 5. 6. 1. 2. 5 METER. 7. AR-002. PAGE. 15.

(16) 1. 2. 3. 4. 5. 6. 7. Project:. 10000. E. E. 20000 5000. 10000. Institution:. 7000. 5000. 20000. NORTH 5000. Team Name: Address:. D. D. 10000. Contact:. 7000. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. 20000. SOUTH. C. C. 10000. 20000. Note:. 10000. N. 7000. B. B. 20000. 5000. EAST. 10000. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:100. Unit DWG. Title. 7000. A. mm. A. Solar Envelope. SOLAR ENVELOPE DWG. No.. 0. 1. 2. 5 METER 20000. PLAN 1. 2. 3. 4. WEST 5. 6. 7. AR-011. PAGE. 16.

(17) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. BESS Photovoltaic Inverter&Battery Delta H=2000. MECH.RM. Inverter. 1F Panel. Team Name:. PLC Panel. monitor Box. Address: D. D. Contact:. Consultants:. 16 15 14 Piping Shaft. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 13 12 11 10 9 8 7 6 5 4 3. C. C. 2 1 UP. Note:. ARCHITECTURE FOOTPRINT. 146.6 m² Humidifier. N. Piping Shaft Indoor unit. Indoor unit. Couch. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:100. Unit. mm. DWG. Title A. A. ARCHITECTURE FOOTPRINT DWG. No.. 0. 1. 2. 3. 4. 5. 6. 1. 2. 5 METER. 7. AR-014. PAGE. 17.

(18) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. BESS Photovoltaic Inverter&Battery Delta H=2000. MECH.RM. Inverter. 1F Panel. Team Name:. PLC Panel. monitor Box. Address: D. D. Contact:. Consultants:. 16 15 14 Piping Shaft. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 13 12 11 10 9 8 7 6 5 4 3. C. C. 2 1 UP. Note:. MAXIMUM MEASURABLE AREA. 56.92 m². Humidifier. N. Piping Shaft Indoor unit. Indoor unit. Couch. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:100. Unit. mm. DWG. Title A. A. MEASURABLE AREA DWG. No.. 0. 1. 2. 3. 4. 5. 6. 1. 2. 5 METER. 7. AR-017. PAGE. 18.

(19) 1. 2. 3. 4. SEE AR-201. 5. 2. 3. 3600. 7. SEE AR-203. SEE AR-202. 1. 6. 1800. 4 Project:. 3600. E. E. 800. A BESS Photovoltaic Inverter&Battery Delta H=2000. Inverter. ENTRANCE. PLC Panel. monitor Box. A-3. 1690. Institution:. MECH.RM.. MECH. RM. 1F Panel. BATHROOM EL +710. EL +710. SEE AR-213 Team Name:. A-4. Address:. D. D. 1710. Contact: EL +710. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. EL +710 16. B. 15 14 Piping Shaft. Consultants:. 2100. 13 12 11 10. TEA TERRACE. SEE AR-212. 9 8 7 6. KITCHEN B-1. C. C. 5. Note:. 4 3. UP. 2100. 2 1. C. N. 2100. EL +710. B. B. Humidifier. C-1. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Piping Shaft. 2100. LIVING RM.. Indoor unit. Indoor unit. SEE AR-211. Couch. WORKSTATION. BEDROOM. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. D. mm. DWG. Title. A. A. GROUND LEVEL PLAN DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-021. PAGE. 19.

(20) 1. 2. 3. 4. SEE AR-201. 5. 2 3600. 7. SEE AR-203. SEE AR-202. 1. 6. 3. 4. 1800. Project:. 3600. E. E. A 800. Institution:. A-3. 1690. OPEN TO BELOW Washing Machine Miele W 6641 H=900 Clothes Dryer. BOSCH WTC82101TC LAUNDRY H=842HANGING AREA. SEE AR-213 Team Name:. A-4. Address: EL +3600. D. D. 1710. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. DN 16. B. 15 14. Wind Pipe. OPEN TO BELOW Consultants:. 2100. 13 12 11 10. SEE AR-212. 9. B-1. C. 8 7 6. Mezzanine Kitchen Exhaust. C. 5. Wind Pipe. Note:. 4 3. 2100. 2 1. C hot water tank (300L). N. B. EL +3600. HVAC ��� DAIKIN RXYMQPVET H=1345. 2100. Cold Water Pipe / Hot Water Pipe / Electric Tube. CO2 Heat Pump Tank Panasonic HE-WU37CQ H=1843. B. Air Hose. C-1. 2100. Heat Pump ���� MK-150 H=540. Air Hose / Refrigerant Pipe H=200. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Air Hose. SEE AR-211. Exhaust Area Rain Water Collection Surface. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. Evaporation Cooling Wall. D. Mark DN DN ST ST ST ST ST. mm. DWG. Title. A. A. MEZZANINE LEVEL PLAN DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-022. PAGE. 20.

(21) 1. 2. 3. 4. SEE AR-201. 5. 2 3600. 7. SEE AR-203. SEE AR-202. 1. 6. 3 1800. E. 4 Project:. 3600. Bayer Makrolon® Solid Sheet. E. Bayer Makrolon® Polypropylene Hollow Sheet. A 800. Institution:. 1690. A-3. SEE AR-213 Team Name:. A-4. Address:. Aluminum Louvers. D. D. 1710. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Fan Exhaust. B. Delta PV Panel. 2100. Consultants:. SEE AR-212 Clear Glass. B-1. C. C. 2100. Note:. C. 2100. N. B. B. Solar Thermal Collector. C-1. 2100. SEE AR-211. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. D. mm. DWG. Title. Aluminum Louvers. A. A. ROOF LEVEL PLAN DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-031. PAGE. 21.

(22) 1. 2. 3. 4. 5. 6. 7. Footprint Calculation House:120.4 M2 Canopy:8.7 M2 Louvers:17.8 M2. 10075 335. 3765. 5975. Project:. Total:146.9 M2. E. E. House 9.332x12.735+0.6375x0.7854x3.14=120.4 (M2). Solar Envelope. Institution:. Canopy 5.975x0.41+(8.975-0.41)x0.408+6.375x0.335=8.0 (M2). Swing Door. Louvers 9.332x1.912=17.8 (M2) Makino bamboos 410. 410. Total 120.41+8.05+17.84=146.3 (M2). Team Name: Address: D. D. 8975. 6390. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Awning Window. Consultants:. Sliding Door. 15057. C. Note:. 6375. 15057. C. 12735. Architecture Footprint. N 6082. Vanilla garden Makino bamboos. B. 1882. 1912. B. Makino bamboos. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. Louvers. 1:100. Unit. mm. DWG. Title A. A. 335. 9332. 408. 10075. DWG. No. 0. 1. 2. 3. RECONFIGURABLE FEATURES 1. 4. 1. 2. 5. 5 METER. AR-041 6. 7. PAGE. 22.

(23) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution: Swing Door. Sliding Door. BESS Photovoltaic Inverter&Battery Delta H=2000. MECH.RM. Inverter. 1F Panel. Team Name:. PLC Panel. NCTU/UNICODE. monitor Box. Address: D. D Washing Machine Miele W 6641 H=900. Contact:. Clothes Dryer BOSCH WTC82101TC H=842. DN. Awning Window. 16 Wind Pipe. Sliding Door. 13 12 11. Piping Shaft. 15 14 13 12 11. 10. 10. 9. 9. 8 7 6. 8 7 6. 5. Wind Pipe. 5. 4. 4. 3. 3. 2 1. 2 1. C. Note:. HVAC ��� DAIKIN RXYMQPVET H=1345. hot water tank (300L). UP. C. Consultants:. 16. 15 14. 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. CO2 Heat Pump Tank Panasonic HE-WU37CQ H=1843. Humidifier. Heat Pump ���� MK-150 H=540. Piping Shaft Indoor unit. Indoor unit. Air Hose. N Air Hose. Couch. B. B. Sliding Door. Sliding Door. Louvers. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale Louvers. 1:100. Unit. mm. DWG. Title A. A. RECONFIGURABLE FEATURES 2 DWG. No.. 0. 1. 2. 5 METER. Mezzanine Level. Ground Level 1. 2. 3. 4. 5. 6. 7. AR-042. PAGE. 23.

(24) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. Team Name: Address: D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. C. C. Note:. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. N/A. Unit. N/A. Louvers DWG. Title. Sliding Door Swing Door. A. Awning Window. A. RECONFIGURABLE FEATURES 3 DWG. No.. AR-043 1. 2. 3. 4. 5. 6. 7. PAGE. 24.

(25) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. Team Name: Solar Envelope. D. Address:. Solar Envelope. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. C. C. Note:. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CH. Checked by. DN. Scale. 1:40. Unit. mm. DWG. Title A. A. RECONFIGURABLE FEATURES 4 DWG. No.. 0. 0.5. 1. 2 METER. Louvers Open 1. 2. 3. Louvers Closed 4. 5. 6. 7. AR-044. PAGE. 25.

(26) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Solar Envelope 200. 1600. 6075. 3900. 974. Institution:. 2926. EL ±0. Entrance. Makino bamboos. EL +710. BESS Photovoltaic Inverter&Battery Delta H=2000. 1825. 425. 1650. MECH.RM. Inverter. 1F Panel. Team Name:. PLC Panel. monitor Box. Address: D. 8600 (5% SLOPE). D. 8850. Contact:. 16 15 14. Consultants:. EL +710. 13 12 11. Piping Shaft. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 10 9 8 7 6 5 4 3 2 1. C. EL +430. Note:. 600. UP. 1875. C. Exit. Humidifier. N. Piping Shaft Indoor unit. Vanilla garden. Indoor unit. Couch. Makino bamboos EL ±0. EL ±0. B. B. Makino bamboos. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. LOT "S". 1:100. Unit. LOT "Q". LOT "P". Mark DN DN ST ST ST ST ST. mm. DWG. Title. A. A. SITE ENTRANCE AND EXIT DWG. No.. 0. 1. 2. 3. 4. 5. 6. 1. 5 METER. 2. 7. AR-051. PAGE. 26.

(27) 1. 2. 3. 4200. 4. 5. 3600. 6. 7. 7675. 1600. Project:. Handrail EL +1810. E. Institution:. 430 280. 1st FL EL +710 GL EL ±0. 710. E. North Team Name: Address: D. D. Contact:. 10370. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 6480. Handrail EL +1810. 430. 398 312. 1st FL EL +710 GL EL ±0. 710. Consultants:. <5% Slope South. C. C. Note:. 1600. 6240. 8850. Handrail EL +1810. 398. GL EL ±0. B. 710. 1st FL EL +710. B. 5% Slope East. 8600. 1875. Handrail EL +1810. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. ST. Scale. 1:60. Unit DWG. Title. 0. 710. 710. GL EL ±0. A. 398 312. 1st FL EL +710. A. SITE ELEVATION DWG. No.. 1. 5 METER. 2. 5% Slope West. 1. mm. 2. 3. 4. 5. 6. 7. AR-101. PAGE. 27.

(28) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. D. C-1. C. B-1. B. A-4. A-3. A. 12600 2100. 2100. 2100. 2100. 1710. 1690. 800 Team Name: Address:. D. RF Beam EL +7370. 72°. D. 53°. Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm. Exhaust Louver. Mezzanine EL +3600. Consultants:. 37°. 18° C. Contact:. Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet Division. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. C. 72°. Note:. Canopy. 2F Beam EL +3410. Handrail. 1F EL +710 B. 1F Beam EL +610. B. Sand Box EL +120 GL EL ±0. Bayer Makrolon® Polycarbonate Hollow Sheet t=10mm. Footing. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. EAST ELEVATION DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-111. PAGE. 28.

(29) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. 4. 3. 2. 1. 9000 1800. 3600. Team Name:. 3600. Address:. D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. RF Beam EL +7370. Consultants:. Louvers Aluminum Cover. Aluminum Cover. Bayer Makrolon® Solid Sheet t= 10 mm. Bayer Makrolon® Polycarbonate. C. C. Hollow Sheet t= 16 mm. Aluminum Cover. Mezzanine EL +3600. Note:. Aluminum Cover. Bayer Makrolon® Polycarbonate. Hollow Sheet t= 16 mm. 2F Beam EL +3410. Canopy. Canopy. Swing Door Handrail. ENTRANCE. B. B. 1F EL +710 1F Beam EL +610 Sand Box EL +120 GL EL ±0. Footing Bayer Makrolon® Polycarbonate Hollow Sheet t= 10 mm. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. NORTH ELEVATION DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-112. PAGE. 29.

(30) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. 1. 2. 3. 4. 9000 1800. 3600. Team Name:. 3600. Address:. D. D. Contact:. RF Beam EL +7370. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. PV Module Clear Glass Consultants:. Solar Water Heater. C. C. Note:. Aluminum Louvers Mezzanine EL +3600 2F Beam EL +3410. Glass Louvers. Canopy. Canopy. B. B. 1F EL +710 1F Beam EL +610 Sand Box EL +120 GL EL ±0. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. SOUTH ELEVATION DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-113. PAGE. 30.

(31) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. A. A-3. A-4. B. B-1. C. C-1. D. 12600 800. 1690. 1710. 2100. 2100. 2100. Team Name:. 2100. Address:. D. D. Contact:. RF Beam EL +7370. 53°. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 72°. 37° Mezzanine EL +3600. C. Note:. 6772. Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm 18°. C. 4307. 3392. Consultants:. 72° Canopy. 2F Beam EL +3410. 2465. POLLI-Brick ™ (Thermal Wall). 3380. Canopy. Handrail B. B. 1F EL +710 1F Beam EL +610 Sand Box EL +120 GL EL ±0. Bayer Makrolon® Polycarbonate Hollow Sheet t=10mm. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. WEST ELEVATION DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-114. PAGE. 31.

(32) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. SEE AR-211. D. SEE AR-212. C-1. C. SEE AR-213. B-1. B. A-4. Institution:. A-3. A. 12600 2100. 2100. 2100. 2100. 1710. 1690. Team Name:. 800. Address:. D. D. PV Module Steel Beam Box 150x150 t=4.5. RF Beam EL +7370. Contact:. Seat. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Delta DC Fan VFB25AEHT Steel Beam C 150x75. Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm. Consultants:. Duct. Gutter. Evaporation Cooling Wall. 3181. Water pan Gutter. C. C. Note:. 1005. Aluminum Louvers Mezzanine EL +3600. 1000. 3 AR-322. 2F Beam EL +3410. Bayer Makrolon® Polycarbonate Hollow Sheet t=16mm. 3 AR-343. Glass Louvers. Louvers 2388. Fix. 3 AR-321. B. B. 1F EL +710 1F Beam EL +610 Sand Box EL +120 GL EL ±0. Wood Plastic Composites Steel Beam H 150x150. Wood floor Vacuum Insulation panel E-foam. POLLI-Bricks™ ( Thermal mass ). Footing. Bayer Makrolon® Polycarbonate Hollow Sheet t=10mm. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. LONGITUDINAL SECTION 1 DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-201. PAGE. 32.

(33) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. SEE AR-211. D. SEE AR-212. C-1. C. SEE AR-213. B-1. B. A-4. Institution:. A-3. A. 12600 2100. 2100. 2100. 2100. 1710. 1690. Team Name:. 800. Address:. D. D. PV Module Steel Beam Box 150x150x4.5. RF Beam EL +7370. Contact:. Green core. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Delta DC Fan VFB25AEHT Steel Beam I 150x150 t=4.5. Plant Pots Consultants:. Water pan. Duct. 3457. Bayer Makrolon® Polycarbonate Solid Sheet t=6mm. Gutter. Gutter. Evaporation Cooling Wall C. C. Note:. 1005. Mezzanine EL +3600. 6802. Aluminum Louvers. 2F Beam EL +3410. Bayer Makrolon® Polycarbonate Hollow Sheet t=16mm. 2388. 3345. Canopy. Glass Louvers. B. B. 1F EL +710 1F Beam EL +610 Sand Box EL +120 GL EL ±0. Wood Plastic Composites Steel Beam Box 150x150 t=4.5. Footing. Wood floor Vacuum Insulation panel E foam. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. LONGITUDINAL SECTION 2 DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-202. PAGE. 33.

(34) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. SEE AR-213. A. A-3. SEE AR-212. A-4. B. SEE AR-211. B-1. C. Institution:. C-1. D. 12600 800. 1690. 1710. 2100. 2100. 2100. Team Name:. 2100. Address:. D. D. Contact:. PV Module. Delta DC Fan VFB25AEHT. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Steel Beam Box 150x150 t=4.5. RF Beam EL +7370. Steel Beam C 150x75 Bayer Makrolon ® Polycarbonate Inter-Locking Hollow Sheet t=40mm. Duct. Consultants:. Water pan. Gutter C. 3181. Gutter. Evaporation Cooling Wall. Bayer Makrolon® Polycarbonate Hollow Sheet t=16mm. C. Note:. Aluminum Louvers. Mezzanine EL +3600 2F Beam EL +3410. Canopy. 2388. Glass Louvers. 3 AR-321. B. B. 1F EL +710 1F Beam EL +610 Sand Box EL +120 GL EL ±0. Wood Plastic Composites Steel Beam C 150x75. Footing. Wood floor Vacuum Insulation panel E-foam. Bayer Makrolon® Polycarbonate Hollow Sheet t=10mm. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. LONGITUDINAL SECTION 3 DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-203. PAGE. 34.

(35) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. SEE AR-201. SEE AR-202. 1. SEE AR-203. 2. 3. 4. 9000 1800. 3600. Institution:. Team Name:. 3600. Address:. D. D. Clear Glass. Solar Water Heater. PV Module. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. RF Beam EL +7370. Consultants:. Gutter. Gutter C. C. Mezzanine EL +3600. Bayer Makrolon ® Polycarbonate Inter-Locking Hollow Sheet t=40mm. Water pan. 2F Beam EL +3410. Note:. Canopy AC. POLLI-Bricks ™ (Thermal mass). Kitchen Work Station. B. B. Bedroom. Living Room 1F EL +710. Bed. 1F Beam EL +610. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Footing. Sand Box EL +120 GL EL ±0. 1 AR-431. 4 IN-411. 8 IN-721. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. TRANSVERSAL SECTIONS 1 DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-211. PAGE. 35.

(36) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. SEE AR-201. SEE AR-202. SEE AR-203. 9000 1800. 3600. Institution:. Team Name:. 3600. Address:. D. D. Bayer Makrolon® Polycarbonate Solid Sheet t=6mm. PV Module RF Beam EL +7370. Contact:. Gutter. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. Bayer Makrolon ® Polycarbonate Inter-Locking Hollow Sheet t=40mm. C. C. Note:. 2 AR-352. Mezzanine EL +3600 2F Beam EL +3410. Canopy. Green core Bayer Makrolon ® Polycarbonate Hollow Sheet t=10mm. B. 1F EL +710 1F Beam EL +610. Tea Terrace. Bayer Makrolon ® Polycarbonate Hollow Sheet t=10mm. B. Kitchen 2 AR-351. Sand Box EL +120 GL Footing EL ±0. 3 IN-422. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. TRANSVERSAL SECTIONS 2 DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-212. PAGE. 36.

(37) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. SEE AR-202. SEE AR-201. 1. SEE AR-203. 2. 3. 4. 9000 1800. 3600. Institution:. Team Name:. 3600. Address:. D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. RF Beam EL +7370. Bayer Makrolon ® Polycarbonate Solid Sheet t=6mm. Consultants:. Bayer Makrolon ® Polycarbonate. Greencore. Gutter. Hollow Sheet t=10mm. Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm. C. Note:. Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm. 2 AR-352. 484. Mezzanine EL +3600. 400. C. 2F Beam EL +3410. Gutter. Canopy. Bayer Makrolon® Polycarbonate Hollow Sheet t=10mm. 2390. 3 AR-341. B. B. 1F EL +710. 1450. 1F Beam EL +610 Sand Box EL +120 GL EL ±0. 2 AR-351. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:60. Unit. mm. DWG. Title A. A. TRANSVERSAL SECTIONS 3 DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-213. PAGE. 37.

(38) 1. 2. 3. 4. 5. 3450. 6. 7. 3450. D1 WIN 1. Project:. E. E. 1F Panel. Inverter. PLC Panel. Institution:. monitor Box. 500. WIN 9. MECH.RM.. 4050. BESS Photovoltaic Inverter&Battery Delta H=2000. WIN 2. Team Name: Address: D. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 16. Piping Shaft. 1950. WIN 10. 13 12 11. Consultants:. 10 9 8 7 6. 4050. WIN 7. 15 14. 1170. 1950. 600. WIN 8. 5. WIN 3. 4 C. C. 3. UP. 1950. WIN11. Note:. 2 1. 1650. 2300. WIN12. WIN13. N. Humidifier. B. B. Piping Shaft Indoor unit. Indoor unit. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Couch. Drawn by. CF. Checked by. DN. Scale. 3450. 1650. 3450. WIN 6. WIN 5. WIN 4. 1:60. Unit. mm. DWG. Title A. A. WINDOW SCHEDULE AND DETAILS 1 DWG. No.. 0. 1. 2. 3. 4. 5. 1. 6. 2. 5 METER. 7. AR-301. PAGE. 38.

(39) 1. 2. 3. 4. 5. 6. 7. Project:. MO=8400 MO=4050. 150. EXTERIOR. E. EXTERIOR. MO=4050. 150. W=4000. 150. W=4000 25. 25. 25. E. 25. 150. Institution: 25. INTERIOR. SEMI-EXTERIOR. WIN 2. WIN 3. Address:. W=3400. MO=3600. D. MO=3450. Team Name:. D. WIN 1. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 150. 25. Consultants:. C. C. Note: 150. MO=12000. 150. 3600 150. MO=3450 25. 25. W=3400 40. 40. MO=4025. 25. 40. MO=4050 25. W=4000 40. 25. 40. 40. 25. 40. W=4000 40. 25. 40. 25. 40. 40. 25. 40. 25. 8400 150. 150. B. B. H=2400. 1F Beam. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. WIN 1 A. 90°. WIN 2. 10mm. 1:40. Unit. 45. 55. a=1100. MO=2470. 14 AR-307. Mark DN DN ST ST ST ST ST. mm. DWG. Title. WIN 3 A. WINDOW SCHEDULE AND DETAILS 2 DWG. No.. 0. 1. 2. 3. 4. 5. 6. 0.5. 1. 2 METER. 7. AR-302. PAGE. 39.

(40) 1. 2. 3. 4. 5. 6. 7. Project: MO=8850. 150. EXTERIOR. 150. W=8850. E. 150. 3450 25. INTERIOR. 3400 60. 25. 60. 25. 1650 1600. 25. 3450. 25. 60. 60. 60. 25. Institution:. 25. 3400 60. 60. 25. 60. 25. E. 150. Team Name: Address:. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. 10mm. Consultants:. 60. b=900. c=800. Contact:. a=1100. 2470. D. MO=2395 H=2345. D. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 100. 25. 1F Beam. WIN 4. WIN 5. WIN 6. C. C. Note:. EXTERIOR. EXTERIOR MO=1950 25. 25. W=1900. INTERIOR. 20. 600. 25. 6A. 3. 7. AR-306. AR-305. AR-306. 25. 1. B. 2365. c=900. H=2240. 1 AR-305. MO=2290. 5 AR-306. H=1680 1500. MO=1730. W=450 AR-305. B. 2305. 25 25. 1280. MO=500. INTERIOR. 5. 6. AR-306. AR-306. 2. 4. AR-305. AR-305. 10mm. WIN 7. A. WIN 8. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN 1:40. Unit. 1F Beam 2. 75. 1F Beam. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Scale. 25. 25. 575. 10mm. Mark DN DN ST ST ST ST ST. mm. DWG. Title. AR-305. WIN 9. A. WINDOW SCHEDULE AND DETAILS 3 DWG. No.. 0. 1. 2. 3. 4. 5. 6. 0.5. 1. 2 METER. 7. AR-303. PAGE. 40.

(41) 1. 2. 4. 5. 6. 7. 25. 150. EXTERIOR. 3. Project:. 60. E. W=1900. MO=1950. INTERIOR E. WIN 10. 25. 150. MO=4050. 25. Institution:. 60. Address:. SEMI-EXTERIOR. WIN11. D. Contact:. WIN12. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. WIN13. 150. 25. D. W=1900. MO=1950. Team Name:. Consultants:. INTERIOR. 25. 25. W=1600. 25. MO=1650. 25. W=2323. 150. MO=2373 150. MO=4173. 150 C. C. Note: 150. MO=8450. 150. W=8450. MO=1950 25. 150. MO=4050 150. W=1900. 25. 150. MO=4100. MO=1950. 25. 150. MO=1650. W=1900. W=1600. 25. 25. 25. MO=2300 W=2250. 25. 25. 1. 8. AR-308. AR-305. 25. AR-308. AR-307. 25. 40 18. 18. 6 AR-306. H=2400 a=1100. 10mm. 10mm. 10mm. 10mm. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. A. 19. AR-308. AR-308. 90°. 100. 25. 19. 2. 9. AR-305. AR-307. 1:40 mm. DWG. Title. 45. 10mm. 55. 10mm. 60. c=800. b=900. a=1100. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Unit. 1F Beam 75. Mark DN DN ST ST ST ST ST. Scale. 10mm A. MO=2470. 25 AR-309. H=2345. 25 AR-309. H=2345. MO=2395. B. 2470. B. WINDOW SCHEDULE AND DETAILS 4 DWG. No.. WIN 10. 1. 2. WIN 11. 3. 4. 0. WIN 13. WIN 12. 5. 6. 0.5. 1. 2 METER. 7. AR-304. PAGE. 41.

(42) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Main Structure (Steel). Institution:. 46. Welding Sealant. 46. Welding. C-20x68x20x3.2t. Sealant. M5x20L. L-67x23x3.2t C-26x95x26x3.2t. H. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 30. 3 Consultants:. H. 1 EXTERIOR. INTERIOR C. 100. INTERIOR. 100. Address:. 18. MO. 22 30. 22 30. 25. L-67x23x3.2t C-26x95x26x3.2t. EXTERIOR. Team Name:. 5 30. 68. C-20x68x20x3.2t M5x20L. 62. Main Structure (Steel). 36. C. MO. 68. 25. D. 36. Note:. 42. 53 60. 4. 25. 7. 12. 16. Sealant ST-25x29x80x3.2t L-15x28x2.3t Welding M5x20L C-24x68x24x3.2t. 100. 68. 75. 25. 40. Main Structure (Steel). 53. 60. Finish Level. 7. 12. 2 Construction Level. 100. B. 75. Main Structure (Steel). 16 29. 80. 18. 40. 68. 42. Sealant ST-25x29x80x3.2t L-15x28x2.3t Welding M5x20L C-24x68x24x3.2t. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:4. Unit. mm. DWG. Title A. A. WINDOW SCHEDULE AND DETAILS 5 DWG. No.. 0. 1. 2. 3. 4. 5. 6. 0.05. 0.1. 0.2 METER. 7. AR-305. PAGE. 42.

(43) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. MO Sealant C-20x68x20x3.2t. 25. L-67x23x3.2t C-20x95x20x3.2t. Institution:. 25. W 50. Sealant C-20x68x20x3.2t L-67x23x3.2t C-20x95x20x3.2t. 50. 46. EXTERIOR Team Name:. 100. Address: D. Contact:. 36. 18. 68. D. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. INTERIOR. 25 25 25. 25 25 25. 5. 5A. Consultants:. 6. C. C. MO Sealant C-20x68x20x3.2t L-67x23x3.2t C-20x95x20x3.2t. 25. Note:. 25. W 20 50. 50. 25 5. 70. 70. 5 25. Sealant C-20x68x20x3.2t L-67x23x3.2t C-20x95x20x3.2t. 100. 18. B. 36. B. 100. 18. 68. 46. EXTERIOR. 25 25 25. 25 25 20 25. 5. 75. INTERIOR. 75. 6A. 25 25. 7. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:4. Unit. mm. DWG. Title A. A. WINDOW SCHEDULE AND DETAILS 6 DWG. No.. 0. 1. 2. 3. 4. 5. 6. 0.05. 0.1. 0.2 METER. 7. AR-306. PAGE. 43.

(44) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. C-20x46x20x3.2t L-45x23x3.2t M5*20L ST-68x3.2t ST-64x2.3t. 70. Contact:. ST-66x3.2t ST-66x2.3t L-15x24x2.3t M5*20L. 51.7. EXTERIOR. 12.5. 69.5. 40. C-25x36x25x2.3t L-15x24x2.3t. INTERIOR. 40. 69.5 12.5. Consultants:. ST-66x3.2t ST-66x2.3t L-15x24x2.3t M5*20L C-25x36x25x2.3t L-15x24x2.3t. C. 150. 37. 40. 25. 40. 40. 57. 11. 12. 57. 25 150. MO. 10. 9. 40. W 25. 55. 48 35 10. 45. Sealant L-16x48x3.2t L-27x23x3.2t M5*20L C-47x37x31x3.2t Welding 54. 57. 150. 5. 103. 96. 25. Note:. Sealant. 51.7. Sealant. B. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 30. 8. H. EXTERIOR. D. 57. 64 6.7 MO. C. Address:. 36 15 42. 23. 25. 64. Team Name:. 6.7. M4*12L Sealant. D. 57. 70. 46. 150. 47. 25. INTERIOR. 13. 14 B. 58. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:4. Unit. mm. DWG. Title A. A. WINDOW SCHEDULE AND DETAILS 7 DWG. No.. 0. 1. 2. 3. 4. 5. 6. 0.05. 0.1. 0.2 METER. 7. AR-307. PAGE. 44.

(45) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. 150. Institution:. 36. 68. 46 C-20x68x20x3.2t. Welding Sealant. 30. 25 Sealant. 51.7. 48 INTERIOR. C. Note:. INTERIOR. 57. 25. W MO. 150. 25. 19. 7. 60. 25. 12.9. 68. 40. 100. EXTERIOR. Consultants:. 60. 57. 18. 16. 68. 25. 16. 53. Sealant C. 150. C-25x36x25x2.3t L-15x24x2.3t M5*20L. 70. C-25x36x25x2.3t L-15x24x2.3 M5*20L. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. H. 69.5 12.5. MO. 40. D. 57. 69.5. 6.7. 12.5. ST-66x3.2t ST-66x2.3t L-15x24x2.3t M5*20L. 36 15 42. EXTERIOR. Address:. L-67x23x3.2t L-95X26X2.3t. D. ST-66x3.2t ST-66x2.3 L-15x24x2.3t M5*20L. Team Name:. 17. 25. 16. 75. 15. 40. 68. 42. Sealant L-27x71x3.2t L-15x28x2.3t M5*20L C-44x68x44x3.2t. B. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:4. Unit. mm. DWG. Title A. A. WINDOW SCHEDULE AND DETAILS 8 DWG. No.. 0. 1. 2. 3. 4. 5. 6. 0.05. 0.1. 0.2 METER. 7. AR-308. PAGE. 45.

(46) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. MO 25 75.5. ST-96x3.2t ST-96x2.3t L-15x24x2.3t M5*20L. 55. 55. 150. 25. W 55. 55. 75.5. ST-96x3.2t ST-96x2.3t L-15x24x2.3t M5*20L. EXTERIOR. D. Team Name:. 15 27. 150. Address: D. 25. 60. 60. 25. 60. 66. 100 12.9. 50.5. C-25x66x25x2.3t L-15x24x2.3t Sealant. 42. 100 12.9. Contact:. C-25x66x25x2.3t L-15x24x2.3t Sealant. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. Consultants:. 60. 50.5. 25. INTERIOR. 20. 21. 22. 23. 24. C. C. Note:. Main Structure (Steel). MO. 25. 25. W 75.5. ST-96x3.2t ST-96x2.3t L-15x22x2.3t M5*20L. 55. 75.5. ST-96x3.2 ST-96x2.3t L-15x22x2.3t M5*20L. EXTERIOR. B. B. M5*20L C-25x66x25x2.3t L-15x22x2.3t M5*20L Sealant. 25. 50.5. INTERIOR. 60. 12.9. 42. 66. 100. 16. M5*20L C-25x66x25x2.3t L-15x22x2.3t M5*20 Sealant. 15 27. Main Structure (Steel). 50.5. 27. 26. 25. 25. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:4. Unit. mm. DWG. Title A. A. WINDOW SCHEDULE AND DETAILS 9 DWG. No.. 0. 1. 2. 3. 4. 5. 6. 0.05. 0.1. 0.2 METER. 7. AR-309. PAGE. 46.

(47) 1. 2. 3. 4. 5. 6. 7. MO=3450 INTERIOR. 25. W=3400 20. 1690. 25. Project:. 1690. 28 AR-312. 25. E. E. Institution:. 33. 30. 31. 32. AR-312. AR-312. AR-312. AR-312. 1F Panel. PLC Panel. monitor Box. 1F Beam EL +440. D. TYPE. HINGED. LOCATION. MECH RM. NOTE. FIRE RATED. MATERIAL. METEL GRILL. 0. 0.5. 1. Team Name: Address:. 2 METER D. 25. Inverter. 35. 1F EL +540. MECH.RM.. 75. BESS Photovoltaic Inverter&Battery Delta H=2000. H=2345. DOOR 1. c=1000. MO=2395. DOOR 1. 29. Contact:. AR-312. DOOR 2. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. C 125x65. DOOR 3. C 125x65. 16. MO:1300. 15 14 Piping Shaft. 30. Consultants:. Steel Structure. 62. 13 12 11 9 8 7 6. 62. 30. 10. 5 4. 1F EL +540. Piping Shaft Indoor unit. 10. MO:2370. C 125x65 100. 1F Beam EL +440. Humidifier. 2278. Lock. C. DOOR 2. 1080. UP. 2650. 2 1. 2340. 3. C. Note:. TYPE. HINGED. LOCATION. ENTRANCE. NOTE. FIRE RATED. MATERIAL. METEL+GLASS. 0. 0.5. 1. 2 METER. N. Indoor unit. Finish Floor. Couch. Steel Structure Frame Depth 100mm (Color 37). B. 823 703. 60. B. 60. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Scale. DOOR 3. 2200. 2080. Checked by. A. HINGED. LOCATION. BATH RM. NOTE. FIRE RATED. MATERIAL. WOOD. 1. 2. 1. 2. A. 0. 4. 5. DOOR SCHEDULE AND DETAILS 1 DWG. No.. 5 METER. 3. mm. DWG. Title. 60. 1F EL +540. 0. 1:50. Unit TYPE. 6. 0.5. 1. 2 METER. 7. DN. AR-311. PAGE. 47.

(48) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. 68. 46. Institution:. C-20x68x20x3.2t. M4*12L Welding Sealant. Main Structure (Steel). L-67x23x3.2t M5*20L ST-76x2.3t. 60. 61. 9. 60. 60. ST-76x2.3t C-20x68x20x3.2t. 4 30. Team Name: Address:. ST-76x2.3t C-20x68x20x3.2t. EXTERIOR. M5*20L L-67x23x3.2t. D. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. M5*20L L-67x23x3.2t. Welding. Welding. Consultants:. 46. 68. 88. 100. 25. W 30 4. 36. 4. D. 16 30. 30. 25. 25 28. Main Structure (Steel). MO. 100. Main Structure (Steel). 36. 30 16 EXTERIOR. INTERIOR. MO. C. INTERIOR. 48. 30. 48. 16 30. 31. 33. C. Note:. MO 16. W 20 60. EXTERIOR. 108. 120 38. 68. 43. INTERIOR. Finish Level. Sealant L-23x76x3.2t L-15x25x2.3t M5*20L Welding C-24x68x24x3.2t. 100. B. 35. 11 100. 12 75. 60. 29. B. Main Structure (Steel). 30 4. 4 30. Construction Level 48. 16 30 20 30 16. 48. 32. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. DN. Scale. 1:4. Unit. mm. DWG. Title A. A. DOOR SCHEDULE AND DETAILS 2 DWG. No.. 0. 1. 2. 3. 4. 5. 6. 0.05. 0.1. 0.2 METER. 7. AR-312. PAGE. 48.

(49) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. Institution:. 3 AR-321. Team Name: Address: D. D. Contact:. 0. 1. 2. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 5 METER. 1. C. Consultants:. C. Note:. N. 330. 250. 50 40. B. 120. B. 30. 100. 16. 160. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CH. Checked by. DN. Scale. 1:10. Unit. mm. DWG. Title A. A. FLOOR CONSTRUCTION GROUNDLEVEL DWG. No.. Thermal conductivity R = 7.7. 0. (m ²K/W). 0.1. 0.2. 0.5 METER. 4 1. 2. 3. 3 4. 5. 6. 7. AR-321. PAGE. 49.

(50) 1. 2. 3. 4. 5. 6. 7. Project:. E. E. 3 AR-322. Institution:. Team Name: Address: D. D. Contact:. 0. 1. 2. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 5 METER. 1. C. Consultants:. C. Note:. 60 25. N. 65. 190. 140. 95 930 12. 151. 472. B. 131. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CH. Checked by. DN. Scale. 1:10. Unit. mm. DWG. Title A. A. FLOOR CONSTRUCTION MEZZANINE LEVEL DWG. No.. Thermal conductivity R = 13.7. 0. (m ²K/W). 0.1. 0.2. 0.5 METER. 4 1. 2. 3. 3 4. 5. 6. 7. AR-322. PAGE. 50.

(51) 2. 650. 1. 3. 4. 5. 6. 7. Project:. 3450. 1560. FLL_B1. FLL_B2. FLL_B3. FLL_B4. Institution:. x3. x3. 1930. FLL_A4. E. 1860. FLL_A3. 1520. FLL_A2. 1480. 1540. FLL_A1. 805. 700. 805. 727. E. x12. x16. Team Name: Address:. D. D. Contact:. 350. FLL_C3. FLL_C4. C. 1950. x1. FLL_D1. FLL_D2. FLL_D3. Consultants:. 1420. FLL_C2. Piping Space. 1380. 1950. FLL_C1. 805. 727. 115. 394. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. C. x1. Note:. FLL_D4 2. 1650. 3450. B. 1950. N. FLL_E1. FLL_E2. FLL_E3. FLL_E4. FLL_E5. FLL_E7. FLL_E6. 108. 1950. FLL_F1. FLL_F2. FLL_F3. FLL_F4. FLL_F5. FLL_F6. FLL_E10. FLL_E9. 392. 200. FLL_E8. B. 50. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. ST. Scale. FLL_F7. FLL_F8. FLL_F10. FLL_F9. 1:50. Unit. mm. DWG. Title Special Module. A. Piping Space. 1F Lower Box Module. 0. 0.5. 1. A. 2 METER. 2. 3. 4. DWG. No.. AR-323. 1 1. FLOOR CONSTRUCTION DETAILS GROUND LEVEL1. 5. 6. 7. PAGE. 51.

(52) 2. 650. 1. 3. 4. 5. 6. 7. Project:. 3450. E. E. Institution:. 1540. Air 18. 40. 90. 50. 12 E-Foam. 1560. Team Name: Address:. D. D. 0. 115. 394. 350. Contact:. 0.1. 0.2. 0.5 METER 2. Piping Space. 1950. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. C. Consultants:. C. 1950. Note:. 1650. 3450. B. 1950. N. B. 1950. 108. 392. 200 50. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. ST. Scale. 1:50. Unit. mm. DWG. Title A. A. Special Module. Piping Space. DWG. No.. 1F Lower Box Structure 0. 1. 2. 5 METER. 1 1. 2. 3. 4. FLOOR CONSTRUCTION DETAILS GROUND LEVEL 2. 5. 6. 7. AR-324. PAGE. 52.

(53) 2. 650. 1. 3. 4. 5. 6. 7. Project:. 3450 1855. 1725. 1800. E. E. FLU_B1. FLU_B2. 1050. 975. 845. FLU_A2. 1540. FLU_A1. X5. X8. 1855. 1855. 1800. Team Name:. 1050. 975. 1050. FLU_D1. D. X6. FLU_C2. 1560. FLU_C1. Institution:. Address:. FLU_D2. D. Contact:. FLU_E1. 394. X3. X7. 435. 115. X7. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 48. FLU_E2 Consultants:. 1950. Piping Space. FLU_F1. FLU_F2. 2. C. FLU_G2. FLU_H1. FLU_H2. Note:. 1950. FLU_G1. C. 1650. 3450 N. B. FLU_J2. FLU_J3. 1950. FLU_J1. B. FLU_K1. FLU_K2. FLU_L2. FLU_L2. 1950. 108. FLU_L1. 422. 200. FLU_K3. FLU_L3. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. ST. Scale. 80. 1:50. Unit. Piping Space. FLU_M1. A. FLU_M2. Special Module. FLU_M3. DWG. Title A. 0. 1F Upper Box Lower Plywood Module. 0.5. 1. 2 METER. 2. 3. 4. FLOOR CONSTRUCTION DETAILS GROUND LEVEL 3 DWG. No.. AR-325. 1 1. mm. 5. 6. 7. PAGE. 53.

(54) A. 1. 3450. 2. 1650. 3. 1F Upper Box Structure. 4. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. 390 330 330 330 330 330 330 330 330 330 330 330. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. 108. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. 115. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. 208 206. 3. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. 200. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. 206 273 330 330 330 353. 2. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. VIP. 394. VIP. VIP. VIP. VIP. B. VIP. C. 200 330 330 330 353. D. 120 330 330 330 330 330 330 330 330 330 330 330 330. E. VIP. 330. 1 4 5. 5. 6. 0. 0. 6. 7. Project:. E. 18 Air. Institution:. 24 54. 12 VIP. 0.1. 1. 0.2. 2. 30. Team Name: Address:. D. Contact:. Piping Space 2. B. A. Piping Space 3450 5 METER. 1 7. Mark DN DN ST ST ST ST ST. 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. NCTU/UNICODE. 0.5 METER. Consultants:. C. Note:. N. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03 Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by CF. Checked by ST. Scale 1:50. Unit mm. DWG. Title. FLOOR CONSTRUCTION DETAILS GROUND LEVEL 4. DWG. No.. AR-326. PAGE. 54.

(55) 2. 650. 1. 3. 4. 5. 6. 1200. 900. 3450. 7. 1180. Project:. 1200. E. 1560. X2. X3. FL_UP_PB1. FL_UP_PB2. 2310. 2240. FL_UP_PA1 FL_UP_PA2 FL_UP_PA3. 2240. Institution:. 1690. 1540. E. X1. Team Name:. X4. Address:. FL_UP_PB3. 1180. D. 1200. 1180. 1200. D. FL_UP_PC2. FL_UP_PC3. X2. X2. C. X1. FL_UP_PD2. FL_UP_PD3. 1650. Note:. 1065. N. X1. 900. 730. 1950. C. 3450 X1. 1030. B. FL_UP_PE8. FL_UP_PE3 200. 1725. FL_UP_PE7. 150. FL_UP_PE2. FL_UP_PE6. 2325. FL_UP_PE1. FL_UP_PE5. 1726. FL_UP_PE4. 197. B. X4. 1180. 1065. 1950. 2400. FL_UP_PD1. Consultants:. 2325. 2100. Piping Space. 1950. FL_UP_PC1. 2100. 593. 2310. 394. 10. 105. Contact:. X5. X1. FL_UP_PE4 FL_UP_PE5 FL_UP_PE6 FL_UP_PE7. FL_UP_PE8. X1. FL_UP_PE2 A. Special Module. Piping Space. Drawn by. CF. Checked by. ST 1:50 mm. 1. 2. 5 METER. 1 3. 4. FLOOR CONSTRUCTION DETAILS GROUND LEVEL 5 DWG. No.. 1F Upper Box Upper Plywood Module 0. 2. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. DWG. Title. A. 1. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Unit. 225. 108. 1950. FL_UP_PE3. Mark DN DN ST ST ST ST ST. Scale. 130. FL_UP_PE1. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. 2 5. 6. 7. AR-327. PAGE. 55.

(56) 1. 2. 3. 4. 5. 6. 7. Project:. 3450 E. E. FL2L_A4. FL2L_B1. FL2L_B2. FL2L_B3. FL2L_B4. 1520. 1480. Institution:. 1930. FL2L_A3. 1860. FL2L_A2. 4050. FL2L_A1. 805. 700. 805. 727. Team Name:. x4. D. x4. x16. Address:. x12. D. 0. FL2L_C2. 0.2. 0.5 METER. FL2L_C3. 2. FL2L_C4. Consultants:. 4050. FL2L_C1. 0.1. Piping Space. 115. 394. 350. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. C. C. Note:. FL2L_D1. FL2L_D2. FL2L_D3. FL2L_D4. 1650. 3450 N. FL2L_E1. FL2L_E2. FL2L_E3. FL2L_E4. FL2L_E5. FL2L_E6. FL2L_E7. FL2L_E8. FL2L_E9. FL2L_E10. B. FL2L_F1. FL2L_F2. FL2L_F3. FL2L_F4. FL2L_F5. FL2L_F6. 108. 200. 392. 4050. B. FL2L_F7. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. ST. Scale. FL2L_F8. FL2L_F9. FL2L_F10. 1:50. Unit. mm. DWG. Title A. A. Special Module. Piping Space. DWG. No.. 2F Lower Box Module 0. 0.5. 1. 2 METER. AR-328. 1 1. 2. 3. 4. FLOOR CONSTRUCTION DETAILS MEZZANINE LEVEL 1. 5. 6. 7. PAGE. 56.

(57) 1. 2. 3. 4. 5. 6. 7. Project:. 3450 E. E. Institution:. 4050. E-Foam. 18 97 12. Team Name: Address: D. D. 0. 0.1. 0.2. 0.5 METER. Piping Space. 2. Consultants:. 4050. 115. 394. 350. Contact:. NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw. C. C. Note:. 1650. 3450 N. B. Mark DN DN ST ST ST ST ST. Date 2013/04/01 2013/07/01 2013/11/01 2014/03/03 2014/04/30 2014/06/02 2014/11/03. Description SD Submission DDc Submission DD Submission CD Submission CD Submission CD Submission AB Submission. Drawn by. CF. Checked by. ST. Scale. 108. 200. 392. 4050. B. 1:50. Unit. mm. DWG. Title A. A. Special Module. Piping Space. DWG. No.. 2F Lower Box Structure 0. 0.5. 1. 2 METER. AR-329. 1 1. 2. 3. 4. FLOOR CONSTRUCTION DETAILS MEZZANINE LEVEL 2. 5. 6. 7. PAGE. 57.

參考文獻

相關文件

(1) Determine a hypersurface on which matching condition is given.. (2) Determine a

AR &amp; VR Professional Development Training 19 HKU e-Learning Development Laboratory.. 接著開始編輯目標影像,按下右方的Click to Upload Overlay Or Click to

從角度 (viewing point) 辨識 AR和VR 的分別 Exterior view..

Now we assume that the partial pivotings in Gaussian Elimination are already ar- ranged such that pivot element a (k) kk has the maximal absolute value... The growth factor measures

The algorithms have potential applications in several ar- eas of biomolecular sequence analysis including locating GC-rich regions in a genomic DNA sequence, post-processing

Concrete suicide plan 有初步的自殺計劃 Vague suicide plan 有較長期的自殺念頭 Prolonged suicide ideation. 沒有自殺念頭 No

2.分署依審查計分表,核計各訓練單位之分數,且依分數

EduVenture® VR adopts affordable interactive 360º spherical VR and AR technologies for teachers to produce VR-based immersive fieldtrip learning videos that capture real-world