2014年歐洲盃十項全能能源屋競賽(Solar Decathlon Europe 2014)—交大蘭花屋(Orchid House)計畫 D#6 Project Drawing 設計施工圖

N/A
N/A
Protected

Academic year: 2022

Share "2014年歐洲盃十項全能能源屋競賽(Solar Decathlon Europe 2014)—交大蘭花屋(Orchid House)計畫 D#6 Project Drawing 設計施工圖"

Copied!
328
0
0

加載中.... (立即查看全文)

全文

(1)

National Chiao Tung University

1001 TA HSUEH ROAD, HSINCHU, TAIWAN 30010

Phone: +886-3-5718083

www.sde.tw

facebook.com/twsde

twitter.com/NCTU_UNICODE

(2)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-101

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

ST -

-

SHEET LIST 1

GE-101 Sheet List 1 2

GE-102 Sheet List 2 3

GE-103 Sheet List 3 4

GE-201 General Symbols 5

GE-211 General Abbreviations 6

GE-301 Urban Project Location 7

GE-310 Urban Proposal Explanation 1 8

GE-311 Urban Proposal Explanation 2 9

GE-320 Existing Building Drawings and Analysis 10

GE-330 Competition Dwelling 11

GE-401 Pavilion East Side Rendering 12

GE-402 Pavilion West Side Rendering 13

2. ARCHITECTURAL

AR-001 La Cité du Soleil® Plan 14

AR-002 Site Plan 15

AR-011 Solar Envelope 16

AR-014 Architecture Footprint 17

AR-017 Measurable Area 18

AR-021 Ground Level Plan 19

AR-022 Mezzanine Level Plan 20

AR-031 Roof Level Plan 21

AR-041 Reconfigurable Feature 1 22

AR-042 Reconfigurable Feature 2 23

AR-043 Reconfigurable Feature 3 24

AR-044 Reconfigurable Feature 4 25

AR-051 Site Entrance and Exit 26

AR-101 Site Elevation 27

AR-111 East Elevation 28

AR-112 North Elevation 29

AR-113 South Elevation 30

AR-114 West Elevation 31

AR-201 Longitudinal Section 1 32

AR-202 Longitudinal Section 2 33

AR-203 Longitudinal Section 3 34

AR-211 Transversal Section 1 35

AR-212 Transversal Section 2 36

AR-213 Transversal Section 3 37

AR-301 Window Schedule and Details 1 38

AR-302 Window Schedule and Details 2 39

AR-303 Window Schedule and Details 3 40

AR-304 Window Schedule and Details 4 41

AR-305 Window Schedule and Details 5 42

AR-306 Window Schedule and Details 6 43

AR-307 Window Schedule and Details 7 44

AR-308 Window Schedule and Details 8 45

AR-309 Window Schedule and Details 9 46

AR-311 Door Schedule and Details 1 47

AR-312 Door Schedule and Details 2 48

AR-321 Floor Construction Ground Level 49

AR-322 Floor Construction Mezzanine Level 50

AR-323 Floor Construction Details Ground Level 1 51 AR-324 Floor Construction Details Ground Level 2 52 AR-325 Floor Construction Details Ground Level 3 53 AR-326 Floor Construction Details Ground Level 4 54 AR-327 Floor Construction Details Ground Level 5 55 AR-328 Floor Construction Details Mezzanine Level 1 56 AR-329 Floor Construction Details Mezzanine Level 2 57 AR-330 Floor Construction Details Mezzanine Level 3 58 AR-331 Floor Construction Details Mezzanine Level 4 59 AR-332 Ceiling Construction Details Mezzanine Level 1 60 AR-333 Ceiling Construction Details Mezzanine Level 2 61 AR-334 Ceiling Construction Details Mezzanine Level 3 62

AR-336 Roof Construction Details 63

AR-363 Joints Details 3 68

AR-364 Joints Details 4 69

AR-371 Stair Details 1 70

AR-372 Stair Details 2 71

AR-401 Green Core Details 1 72

AR-402 Green Core Details 2 73

AR-403 Green Core Details 3 74

AR-404 Green Core Details 4 75

AR-411 Blue Wall Details 76

AR-421 Smart Skin Details 1 77

AR-422 Smart Skin Details 2 78

AR-431 Thermal Wall Details 1 79

AR-432 Thermal Wall Details 2 80

AR-433 Thermal Wall Details 3 81

AR-434 Thermal Wall Details 4 82

AR-435 Thermal Wall Details 5 83

AR-436 Thermal Wall Details 6 84

AR-437 Thermal Wall Details 7 85

AR-438 Thermal Wall Details 8 86

AR-439 Thermal Wall Details 9 87

AR-440 Thermal Wall Details 10 88

AR-441 Thermal Wall Details 11 89

3. BIOCLIMATIC ANALYSIS (BA)

BA-001 Taipei Climate Analysis 90

BA-002 Taipei Shading Analysis 91

BA-003 Taipei Wind Rose Analysis 92

BA-004 Versailles Climate Analysis 93

BA-005 Versailles Shading Analysis 94

BA-006 Versailles Wind Rose Analysis 95

BA-011 Bioclimatic Strategies 96

BA-012 Natural Ventilation 97

BA-013 Solar Chemny 98

BA-014 Earth/Vegetation cooling 99

BA-015 Evaporative Cooling 100

BA-016 Direct Solar Heating 101

BA-017 Bioclimatic Drawings Heating 102

BA-018 Thermal Wall in Versailles 103

BA-019 Thermal Wall in Taipei 104

BA-020 Heat Exchanger Preheated by Solar Hot Water 105

BA-021 Heat Pump 106

4. INTERIORS (IN)

IN-001 Ground Level Floor 107

IN-002 Mezzanine Level Floor 108

IN-101 Reflected Ceiling 109

IN-201 Interior Elevation 1 110

IN-202 Interior Elevation 2 111

IN-203 Interior Elevation 3 112

IN-204 Interior Elevation 4 112

IN-205 Interior Elevation 5 114

IN-211 Interior Elevation 6 115

IN-212 Interior Elevation 7 116

IN-301 Ground Level Furnishings 117

IN-302 Mezzanine Level Furnishings 118

IN-401 Kitchen Plan 1 119

IN-402 Kitchen Plan 2 120

IN-411 Kitchen Elevations 121

IN-421 Kitchen Section 1 122

IN-422 Kitchen Section 2 123

IN-423 Kitchen Section 3 124

IN-501 Bathroom Plan 125

IN-511 Bathroom Elevations 126

-

2

(3)

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-102

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

ST -

-

SHEET LIST 2 IN-604 Interior Rendering View From Terrace 130

IN-701 Workstation Plan 131

IN-711 Workstation Elevations 132

IN-721 Workstation Sections 133

5. STRUCTURAL (ST)

ST-001 Foundation Plan and Details 134

ST-002 Structural Floor Unit 135

ST-011 Structural Ground Level Plan 136

ST-012 Structural Mezzanine Level Plan 137

ST-013 Structural Elements Marking Ground Level Plan 138 ST-014 Structural Elements Marking Mezzanine Level Plan 139

ST-021 Structural Roof Plan 140

ST-022 Structural Roof Units 141

ST-023 Structural Elements Marking Roof Plan 142 ST-101 Structural Longitudinal Sections Frame 1 143 ST-102 Structural Longitudinal Sections Frame 2 144 ST-103 Structural Longitudinal Sections Frame 3 145 ST-104 Structural Longitudinal Sections Frame 4 146 ST-111 Structural Transversal Sections Frame A 147 ST-112 Structural Transversal Sections Frame A-3 148 ST-113 Structural Transversal Sections Frame A-4 149 ST-114 Structural Transversal Sections Frame B 150 ST-115 Structural Transversal Sections Frame B-1 151 ST-116 Structural Transversal Sections Frame C 152 ST-117 Structural Transversal Sections Frame C-1 153 ST-118 Structural Transversal Sections Frame D 154

ST-201 Structural Blow ups 155

ST-301 Structural Details 156

ST-302 Structural Details Axon 157

ST-401 Structural Axon 158

6. FIRE PROTECTION (FP)

FP-001 Fire Protection Details 159

FP-002 Fire Protection : Ground Level 160

FP-003 Fire Protection : Mezzanine Level 161

FP-004 Fire Protection Evacuation Path : Ground Level 162 FP-005 Fire Protection Evacuation Path : Mezzanine Level 163 7. PLUMBING (PL)

PL-001 Plumbing Supply and Removal Ground Level Plan. 164 PL-002 Plumbing Supply and Removal Ground Mezzanine Plan. 165

PL-011 Gray Water Ground Level 166

PL-012 Gray Water Mezzanine Level 167

PL-021 Drain / Waste / Vent 168

PL-031 Containers and Fill Locations 169

PL-101 Schematic diagram in Taiwan 170

PL-102 Schematic diagram in Competition 171

PL-201 Supply and removal Clean Water Isometric 172 PL-202 Supply and removal Hot Water Isometric 173

PL-211 Grey water Isometric 174

PL-221 Drain/Waste/Vent Isometric 175

PL-301 Green Core Irrigation Plan 176

PL-302 Green Core Irrigation Elevation 1 177

PL-303 Green Core Irrigation Elevation 2 178

8. SOLAR WATER HEATING (SW)

SW-001 Solar Water Plan 179

SW-101 Solar Water Isometric 180

SW-201 Solar Water Schematic 181

9. MECHANICAL (ME)

ME-001 HVAC Distribution Plan Ground Level 182 ME-002 HVAC Distribution Plan Mezzanine Level 183

ME-041 Ventilation 1 188

ME-042 Ventilation 2 189

ME-101 Mechanical room elevations 190

ME-201 HVAC System Schematic drawings 191

ME-211 Heating mode Schematic drawings 1 192

ME-212 Heating mode Schematic drawings 2 193

ME-221 Cooling mode Schematic drawings 1 194

ME-222 Cooling mode Schematic drawings 2 195

ME-231 Controls 1 196

ME-232 Controls 2 197

ME-301 Isometric Distribution 1 198

ME-302 Isometric Distribution 2 199

10. ELECTRICAL (EL)

EL-001 Grid interconnection 200

EL-201 DC wiring diagram 201

EL-301 Power Plan Ground Level 202

EL-302 Power Plan Mezzanine Level 203

EL-401 Lighting Plan Site 204

EL-402 Lighting Plan Ground Level 205

EL-403 Lighting Plan Mezzanine Level 206

EL-501 One-line Diagram 1 207

EL-502 One-line Diagram 2 208

EL-503 One-line Diagram 3 209

EL-601 AC Circuit layout 210

EL-602 AC Circuit layout 211

EL-603 AC Circuit layout 212

11. PHOTOVOLTAIC SYSTEM (PV)

PV-001 Photovoltaic System: General 1 213

PV-002 Photovoltaic System: General 2 214

PV-003 Photovoltaic System: General 3 215

PV-011 Photovoltaic System: DC circuits 216

PV-021 Photovoltaic System: AC citcuits 217

PV-031 Photovoltaic System: grounding system 218 PV-041 Photovoltaic System: Module Layout 219 PV-042 Photovoltaic System: Module String Layout 220 12. TELECOMMUNICATIONS AND BUILDING AUTOMATIZATION SYSTEM (BAS)

BAS-001 Wiring Plan Ground Level 221

BAS-002 Wiring Plan Mezzanine Level 222

BAS-101 Schematic diagram 1 223

BAS-102 Schematic diagram 2 224

BAS-201 Equipment 1 225

BAS-202 Equipment 2 226

13. SDE INSTRUMENTATION DRAWINGS (ID)

ID-001-1 General Monitoring Ground Level 227

ID-001-2 General Monitoring Mezzanine Level 228

ID-002 Monitoring Panel Room 229

ID-003-1 Electricity Meters Topology 1 230

ID-003-2 Electricity Meters Topology 2 231

ID-004 Electricity Meters Connection 232

ID-005-1 House Appliances Ground Level 233

ID-005-2 House Appliances Mezzanine Level 234

-

3

(4)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-103

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

ST -

-

SHEET LIST 3 SO-011 Trucks Shipment During Assembly Phase 1 236

SO-012 Trucks Shipment During Assembly Phase 2 237 SO-013 Trucks Shipment During Assembly Phase 3 238 SO-014 Trucks Shipment During Assembly Phase 4 239 SO-015 Trucks Shipment During Assembly Phase 5 240 SO-021 Trucks Shipment During Disassembly Phase 1 241 SO-022 Trucks Shipment During Disassembly Phase 2 242 SO-023 Trucks Shipment During Disassembly Phase 3 243 SO-024 Trucks Shipment During Disassembly Phase 4 244 SO-025 Trucks Shipment During Disassembly Phase 5 245

SO-101 La Cité du Soleil® Plan 246

SO-102 Assembly Lot Plan 247

SO-103 Disassembly Lot Plan 248

SO-201 Assembly Phase 1 249

SO-202 Assembly Phase 2 250

SO-203 Assembly Phase 3 251

SO-204 Assembly Phase 4 252

SO-205 Assembly Phase 5 253

SO-206 Assembly Phase 6 254

SO-207 Assembly Phase 7 255

SO-208 Assembly Phase 8 256

SO-209 Assembly Phase 9 257

SO-210 Assembly Phase 10 258

SO-301 Disassembly Phase 1 259

SO-302 Disassembly Phase 2 260

SO-303 Disassembly Phase 3 261

SO-304 Disassembly Phase 4 262

SO-305 Disassembly Phase 5 263

SO-306 Disassembly Phase 6 264

SO-307 Disassembly Phase 7 265

SO-308 Disassembly Phase 8 266

SO-309 Disassembly Phase 9 267

SO-310 Disassembly Phase 10 268

SO-401 Assembly Lot Plan Truck 01 269

SO-402 Assembly Lot Plan Truck 02 270

SO-403 Assembly Lot Plan Truck 03 271

SO-404 Assembly Lot Plan Truck 04 272

SO-405 Assembly Lot Plan Truck 05 273

SO-406 Assembly Lot Plan Truck 06 274

SO-407 Assembly Lot Plan Truck 07 275

SO-408 Assembly Lot Plan Truck 08 276

SO-409 Assembly Lot Plan Truck 09 277

SO-410 Assembly Lot Plan Truck 10 278

SO-411 Assembly Lot Plan Truck 11 279

SO-412 Assembly Lot Plan Truck 12 280

SO-413 Assembly Lot Plan Truck 13 281

SO-414 Assembly Lot Plan Truck 14 282

SO-415 Assembly Lot Plan Truck 15 283

SO-501 Disassembly Lot Plan Truck 01 284

SO-502 Disassembly Lot Plan Truck 02 & 03 285

SO-503 Disassembly Lot Plan Truck 04 286

SO-504 Disassembly Lot Plan Truck 05 287

SO-505 Disassembly Lot Plan Truck 06 288

SO-506 Disassembly Lot Plan Truck 07 289

SO-507 Disassembly Lot Plan Truck 08 290

SO-508 Disassembly Lot Plan Truck 09 & 10 291

SO-509 Disassembly Lot Plan Truck 11 292

SO-510 Disassembly Lot Plan Truck 12 293

SO-511 Disassembly Lot Plan Truck 13 294

SO-512 Disassembly Lot Plan Truck 14 295

SO-513 Disassembly Lot Plan Truck 15 & 16 296 15. HEALTH AND SAFETY (HS)

HS-001 Health and Safety in the lot and surroundings 1 297

HS-302 Health and Safety Signposting 302

HS-303 Health and safety PPE 303

HS-401 Health and Safety during Assembly Phase 1 304 HS-402 Health and Safety during Assembly Phase 2 305 HS-403 Health and Safety during Assembly Phase 3 306 HS-404 Health and Safety during Assembly Phase 4 307 HS-405 Health and Safety during Assembly Phase 5 308 HS-406 Health and Safety during Assembly Phase 6 309 HS-407 Health and Safety during Assembly Phase 7 310 HS-408 Health and Safety during Assembly Phase 8 311 HS-409 Health and Safety during Assembly Phase 9 312 HS-410 Health and Safety during Assembly Phase 10 313 HS-501 Health and Safety during Maintenance 314 HS-601 Health and Safety during Disassembly Phase 1 315 HS-602 Health and Safety during Disassembly Phase 2 316 HS-603 Health and Safety during Disassembly Phase 3 317 HS-604 Health and Safety during Disassembly Phase 4 318 HS-605 Health and Safety during Disassembly Phase 5 319 HS-606 Health and Safety during Disassembly Phase 6 320 HS-607 Health and Safety during Disassembly Phase 7 321 HS-608 Health and Safety during Disassembly Phase 8 322 HS-609 Health and Safety during Disassembly Phase 9 323 HS-610 Health and Safety during Disassembly Phase 10 324

16. PUBLIC TOUR (PT)

PT-001 Site accessibility Plan 325

PT-002 Site accessibility Elevation 326

PT-101 House Tour Plan 327

PT-201 House Tour General Information 328

-

4

(5)

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-201

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

SS DN -

GENERAL SYMBOLS

SHEET DWG

SHEET DWG

SHEET DWG

SHEET DWG

No.

EL ±0xx xx NAME GWG.

SHEET DWG

ELEVATION MARK

SECTION MARK

ROOM TAG

GRID NUMBER

ELEVATION MARKER

1 2 4 XX 3

DWG INTERIOR ELEVATION

MARKER

DOOR TAG

WINDOW TAG DOOR #

WIN#

WATERPROOF RECESSED DN LIGHT RECESSED DN LIGHT

S D A

FE EXIST

SPRINKLER

SMOKE DETECTOR SMOKE ALARM

FIRE EXTINGUISHER

EXIST SIGN

EXIST DIRECTION

GENERAL SYMBOLS

-

5

(6)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-211

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

DN DN -

# Pound: OR Number

&: And

@: At

ACT: Acoustic Ceiling Tile AD: Area Drain

AFF: Above Finished Floor ALUM: Aluminum ANOD: Anodized BSMT: Basement BYND: Beyond BOT: Bottom CIP: Cast In Place CHNL: Channel CJ: Control Joint CLG: Ceiling CLR: Clear

CMU: Concrete Masonry Unit COL: Column

COMPR: Compressible CONC: Concrete CONT: Continuous CPT: Carpet CT: Ceramic Tile CTYD: Courtyard DBL: Double

DEMO: Demolish or Demolition DIA: Diameter

DIM: Dimension DIMS: Dimensions DN: Down DR: Door DWG: Drawing EA: Each

EJ: Expansion Joint EL: Elevation ELEC: Electrical

ELEV: Elevator or Elevation

EPDM: Ethylene Propylene Diene M-Class (Roofing) EQ: Equal

EXIST: Existing EXP JT: Expansion Joint EXT: Exterior

FD: Floor Drain or Fire Department FEC: Fire Extinguisher Cabinet FIXT: Fixture

FLR: Floor FM: Filled Metal FO: Face Of FND: Foundation GA: Gauge GALV: Galvanized GWB: Gypsum Wall Board HC: Hollow Core

HI: High

HM: Hollow Metal HP: High Point HR: Hour

HVAC: Heating, Ventilating, And Air Conditioning IRGWB: Impact Resistant Gypsum Wall Board ILO: In Lieu Of

INSUL: Insulated or Insulation INT: Interior

LO: Low

MAX: Maximum MO: Masonry Opening MECH: Mechanical MEMBR: Membrane MIN: Minimum

MRGWB: Moisture-Resistant Gypsum Wall Board MTL: Metal

NIC: Not In Contract NO: Number NOM: Nominal OC: On Center OH: Opposite Hand OZ: Ounce

PCC: Pre-Cast Concrete PLUMB: Plumbing PLYD: Plywood PT: Pressure Treated PNT: Paint or Painted PVC: Polyvinyl Chloride RBR: Rubber

RCP: Reflected Ceiling Plan RD: Roof Drain

REQD: Required RM: Room SIM: Similar

SPEC: Specified OR Specification SPK: Sprinkler or Speaker SSTL: Stainless Steel

STC: Sound Transmission Coefficient STL: Steel

STRUCT: Structure or Structural T&G: Tongue And Groove TELE: Telephone TLT: Toilet TO: Top Of

TOC: Top Of Concrete TOS: Top Of Steel

TPD: Toilet Paper Dispenser T/D: Telephone/Data TYP: Typical

UNO: Unless Noted Otherwise U/S: Underside

VIF: Verify In Field VP: Vision Panel W/: With WD: Wood

-

GENERAL ABBREVIATIONS

6

(7)

ST DN - -

Urban Project Location (compare with France’s 674,834 km2 and 65.7

million people). The population density is especially high because two-thirds of the island is composed of mountains, and as a result most people live along the coastal areas.

It is especially crowded in urban areas, such as the capitol city, Taipei, which is one of the top ten densest cities in the world. In addition to the high population density, Taipei also developed rapidly over the years, both of which contribute to a random assortment of architecture in the city that expands

horizontally instead of vertically to conserve space.

However, also as a result of the rapid development, many of the residential buildings were not built to last and have infrastructure that is now rundown or outdated. In recent years, new residential buildings are sky scraper apartments, which are usually only affordable by the wealthy upper class because of the luxury design and locations in the city center.

This population growth results in the lack of living space and sufficient public amenity, and cause middle classes moving toward the periphery, even outside of city. The majority of these people are young professionals who just graduated from collage whom have worked a few years, and they are not able to afford a house yet. However, most of them works in the city center and commute, and caused major traffic congestions with millions of cars and motorcycle. Consequently, the city is left with a high carbon dioxide pollution, and the decrease living quality.

7

Taipei, Taiwan

Population: 2,650,900 Area: 271.8 km² Density: 9,753 Person/km²

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-301

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

(8)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-310

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

RL DN -

URBAN PROPOSAL EXPLANATION 1

-

8

Taipei city population reached its 20-year peak and residential building has been constructed in various types.

The majorities are a duplex apartment, which is relatively wide and 4 to 5 story building, and a row house that is extremely narrow and deep single family owned. These two types were constructed during the modern democracy period. Most of flat-roof duplex apartment and row house are facing problems: leakage, heat absorption and no public facilities. Therefore, the illegal make-shift metal roofed shelters have been introduced widely in most of the residential buildings and create unregulated cityscape of Taipei.

For Orchid House urban design strategy, NCTU UNICODE focus districts where the most of duplex apartment and row house are located as the most needed area for urban regeneration to vitalize not only the residential building, but also these districts.

As main focal point of Ximending Zero Energy District plan, NCTU UNICODE proposes not only PV panel implementation to buildings, but also larger scale of renewable energy sources such as CSP (Concentrated Solar Power), Biomass, Wind power and Geothermal. In order for all renewable energy sources to be distributed efficiently, advanced applications of Wide-area-Measurement System (WAMS) is installed one of larger footprint building rooftops, and Data Centre (MDMS) serve all the energy with automation system.

Furthermore, AMI (Advanced Metering Infrastructure) is installed to Orchid House Clusters to manage power supply within houses. Please refer Architecture Design Narrative for farther details of AMI integration to housing appliances.

The Orchid House Cluster acts as a pilot project for further development of smart building energy

management technology. Eventually, AMI system will be installed to most of buildings in the district to

increase 20% energy usage efficiency from conventional grid system.

(9)

SC DN -

URBAN PROPOSAL EXPLANATION 2

-

9

district urban planning, but also to apply new concept of urban regeneration. Almost 50% of residential building in Taipei city are over 30 years old and typically demolished during the renewal planning. However, NCTU UNICODE points out the problem of city re-development organized by government and executed by private developers. The developer tends to acquire larger number of properties to combine the land FAR (Floor Area Ratio) to build up high-rise residential condominium, which is not affordable for average income level and treated as investment target by investors.

Orchid House will proved unique opportunity for not only the building owner, but also the targeted tenants, who needs housing support to pursue their young profession to promote new creative industry in Taipei.

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-311

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

(10)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-320

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

ST DN -

EXISTING BUILDING DRAWING AND ANALYSIS

-

Taipei Residential Type Analysis

Duplex Apartment 30%

Row House 20%

Super Luxury Housing 6%

Single House 7%

Community Housing 18%

Super Tiny Housing 18%

Comdominium 12%

Stack Villa 1%

DESCRIPTION

Row House and Duplex Apartment are the most number of Taipei residential building Type. These two types are usually 4 to 5 floor high and the oldest building in Taipei, which are about 20 to 30 years old and facing some following problems:

1. Top floor Leaking 2. Top floor is too hot 3. No Public Facility

Presently, most households live in flat-roofed row houses and duplex apartments, but due to a lack of space, people try to expand their living area by building on their roofs.

The illegal make-shift metal-roofed shelters that result are unregulated and

displeasing to the eye. Lastly, social housing projects have fallen to the wayside and do not adequately consider the needs of disadvantaged groups, social justice, and the problems of housing for those with low-income.

10

(11)

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-330

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CC DN -

COMPETITION DWELLING

-

Extension Canopy Rooftop Garden

Steel Bar Window Extended Signboard

Small-Scale Street

11

(12)

CC DN

-

PAVILION EAST SIDE RENDERING

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-401

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

-

N

12

(13)

CC DN

-

PAVILION WEST SIDE RENDERING

- Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

GE-402

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

N

13

(14)

DTU ROF CUJ

SHU REC KMU

PLT FNX

ATC BAR

OTP DEL

LUC BUC

ROM PAR

S1 S2

S3 UNI

ST DN 1:1000

La Cité du Soleil® PLAN

mm Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-001

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

14

(15)

LOT "S"

LOT "Q"

LOT "P"

EL ±0

EL +710

EL +430

EL +710

EL +398 EL ±0

8600 (5% SLOPE)1875

1650 200 1600 6075

10370 (<5% SLOPE) 6480

16006240 (5% SLOPE)8850

60151600

3900 2300 1600

1825

425

Makino bamboos

Makino bamboos EL ±0 Makino bamboos

425

Vanilla garden

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-002

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF - 1:100

SITE PLAN

mm

0 1 2 5 METER

15

(16)

Solar Envelope 20000

20000

5000 10000 5000

5000100005000

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-011

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:100

SOLAR ENVELOPE

mm NORTH

SOUTH

EAST

0 1 2 5 METER

10000

7000

20000

10000

7000

20000

10000

7000

20000

10000

7000

20000

16

(17)

PhotovoltaicBESS Inverter&Battery Delta H=2000

Couch Piping Shaft Indoor

unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

MECH.RM.

Inverter monitor Box 1F Panel PLC Panel

ARCHITECTURE FOOTPRINT

146.6 m²

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-014

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:100

ARCHITECTURE FOOTPRINT

mm

0 1 2 5 METER

17

(18)

MAXIMUM MEASURABLE AREA

56.92 m²

PhotovoltaicBESS Inverter&Battery Delta H=2000

Couch Piping Shaft Indoor

unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

MECH.RM.

Inverter monitor Box 1F Panel PLC Panel

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-017

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:100

MEASURABLE AREA

mm

0 1 2 5 METER

18

(19)

MECH. RM.

BATHROOM

BEDROOM WORKSTATION

KITCHEN

TEA TERRACE

LIVING RM.

ENTRANCE

BESS Photovoltaic Inverter&Battery Delta H=2000

Couch Piping Shaft

Indoor unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

MECH.RM.

Inverter monitor Box

1F Panel PLC Panel

SEE AR-213

SEE AR-212

SEE AR-211

3600 1800 3600

A

A-3

A-4

B

C

D B-1

C-1

800169017102100210021002100

EL +710 EL +710

EL +710 EL +710

EL +710

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-021

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

GROUND LEVEL PLAN

mm

0 1 2 5 METER

19

(20)

OPEN TO BELOW LAUNDRY HANGING AREA

Evaporation Cooling Wall Exhaust Area Mezzanine

SEE AR-213

SEE AR-212

SEE AR-211

Rain Water Collection Surface

Kitchen Exhaust

OPEN TO BELOW

Air Hose / Refrigerant Pipe H=200

Cold Water Pipe / Hot Water Pipe / Electric Tube

3600 1800 3600

A

A-3

A-4

B

C

D B-1

C-1

800169017102100210021002100

Washing Machine Miele W 6641 H=900

Clothes Dryer BOSCH WTC82101TC H=842

Heat Pump ���� MK-150 H=540 HVAC ��� DAIKIN RXYMQPVET H=1345

Air Hose

Air Hose hot water tank (300L) Wind Pipe

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Wind Pipe

DN

CO2 Heat Pump Tank Panasonic HE-WU37CQ H=1843

EL +3600 EL +3600

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-022

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

MEZZANINE LEVEL PLAN

mm

0 1 2 5 METER

20

(21)

SEE AR-213

SEE AR-212

SEE AR-211

Bayer Makrolon® Solid Sheet Bayer Makrolon® Polypropylene Hollow Sheet

Aluminum Louvers

Delta PV Panel

Aluminum Louvers Clear Glass

Solar Thermal Collector

3600 1800 3600

A

A-3

A-4

B

C

D B-1

C-1

800169017102100210021002100

Fan Exhaust

CF DN 1:60

ROOF LEVEL PLAN

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-031

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

mm

0 1 2 5 METER

21

(22)

Swing Door

Awning Window

Solar Envelope

335 3765 5975

10075

335 408

10075

89756082 15057

410639063751882

15057

Architecture Footprint

9332

410127351912

Sliding Door

Louvers Makino bamboos

Vanilla garden

Makino bamboos

Makino bamboos

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-041

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:100

RECONFIGURABLE FEATURES 1

mm Canopy 8.7 M2

Louvers:17.8 M2 Total:146.9 M2

0 1 2 5 METER

House

9.332x12.735+0.6375x0.7854x3.14=120.4 (M2) Canopy

5.975x0.41+(8.975-0.41)x0.408+6.375x0.335=8.0 (M2) Louvers

9.332x1.912=17.8 (M2) Total

120.41+8.05+17.84=146.3 (M2)

22

(23)

BESS Photovoltaic Inverter&Battery Delta H=2000

Couch Piping Shaft

Indoor unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

MECH.RM.

Inverter monitor Box 1F Panel PLC Panel

Swing Door

Sliding Door

Louvers Awning Window

Sliding Door

Sliding Door Sliding Door

Washing Machine Miele W 6641 H=900

Clothes Dryer BOSCH WTC82101TC H=842

Heat Pump ���� MK-150 H=540 HVAC ��� DAIKIN RXYMQPVET H=1345

Air Hose

Air Hose hot water tank (300L) Wind Pipe

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Wind Pipe

DN

CO2 Heat Pump Tank Panasonic HE-WU37CQ H=1843

Louvers

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-042

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:100

RECONFIGURABLE FEATURES 2

mm

0 1 2 5 METER

23

(24)

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-043

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN N/A

RECONFIGURABLE FEATURES 3

Louvers N/A Sliding Door Swing Door Awning Window

24

(25)

Solar Envelope Solar Envelope

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-044

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CH DN 1:40

RECONFIGURABLE FEATURES 4

mm

0 0.5 1 2 METER

25

(26)

BESS Photovoltaic Inverter&Battery Delta H=2000

Couch Piping Shaft Indoor

unit Humidifier

UP

Indoor unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Piping Shaft

MECH.RM.

Inverter monitor Box 1F Panel PLC Panel

Entrance

Exit

Solar Envelope

LOT "S"

LOT "Q"

LOT "P"

EL ±0

EL +710

EL +430

EL +710

EL +398 EL ±0

8600 (5% SLOPE)1875

1650 200 1600 6075

10370 (<5% SLOPE) 6480

16006240 (5% SLOPE)8850

60151600

3900 2300 1600

1825

425

Makino bamboos

Makino bamboos EL ±0 Makino bamboos

425

Vanilla garden

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission N

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-051

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:100

SITE ENTRANCE AND EXIT

mm

0 1 2 5 METER

26

(27)

EL ±0GL EL +7101st FL EL +1810Handrail

398312 710

398312 710

430

10370 6480

430280 710

EL ±0GL EL +7101st FL EL +1810Handrail

398312710

EL ±0GL EL +7101st FL EL +1810Handrail

710

8600 1875

EL ±0GL EL +7101st FL EL +1810Handrail

710398

1600 6240 8850

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-101

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF ST 1:60

SITE ELEVATION

North

mm South

East

0 1 2 5 METER

27

<5% Slope

5% Slope

5% Slope

(28)

2100 2100 2100 2100 1710 1690 800 12600

18°

72°

72° 53°

37°

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Bayer

Makrolon®

Polycarbonate Inter-Locking Hollow Sheet t=40mm

Canopy

Bayer

Makrolon®

Polycarbonate Hollow Sheet

t=10mm Exhaust Louver

Handrail

Footing

A A-3

A-4 B

B-1 C

C-1 D

Bayer

Makrolon®

Polycarbonate Inter-Locking Hollow Sheet Division

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-111

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

EAST ELEVATION

mm

0 1 2 5 METER

28

(29)

1 2

3 4

3600 1800 3600

9000

ENTRANCE

Louvers

Bayer

Makrolon® Polycarbonate Hollow Sheet

t= 16 mm

Bayer

Makrolon® Solid Sheet t= 10 mm

Bayer

Makrolon® Polycarbonat

e

Hollow Sheet

t= 16 mm

Swing Door

Bayer

Makrolon® Polycarbonat

e

Hollow Sheet

t= 10 mm

Canopy Canopy

Handrail

Footing

Sand Box

EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Aluminum Cover

Aluminum Cover

Aluminum Cover

Aluminum Cover

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-112

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

NORTH ELEVATION

mm

0 1 2 5 METER

29

(30)

1 2 3 4

3600 1800 3600

9000

PV Module Clear Glass

Solar Water Heater

Aluminum Louvers

Glass Louvers Canopy Canopy

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-113

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

SOUTH ELEVATION

mm

0 1 2 5 METER

30

(31)

A A-3 A-4 B B-1 C C-1 D

800 1690 1710 2100 2100 2100 2100

12600

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

Bayer

Makrolon®

Polycarbonate Inter-Locking Hollow Sheet t=40mm

Canopy

POLLI-Brick

™ (

Thermal Wall)

Bayer

Makrolon®

Polycarbonate Hollow Sheet

t=10mm

53° 72°

18°

72°

37°

Canopy

Handrail

2465 4307 3380 3392 6772

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-114

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

WEST ELEVATION

mm

0 1 2 5 METER

31

(32)

Fix

2100 2100 2100 2100 1710 1690 800

12600 SEE AR-212

SEE AR-211 SEE AR-213

A A-3

A-4 B

B-1 C

C-1 D

Louvers Water pan

PV Module Steel Beam Box 150x150 t=4.5

Wood floor Duct

Bayer Makrolon® Polycarbonate Hollow Sheet

t=10mm

Seat

Vacuum Insulation panel E-foam

Delta DC Fan VFB25AEHT

Bayer Makrolon® Polycarbonate Hollow Sheet

t=16mm Gutter Gutter

POLLI-Bricks™

( Thermal mass )

Footing

Glass Louvers

Bayer

Makrolon® Polycarbonate

Inter-Locking Hollow Sheet t=40mm

Wood Plastic Composites Steel Beam H 150x150

Aluminum Louvers

Evaporation Cooling Wall

Steel Beam C 150x75

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

1000 2388

1005 3181

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-201

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

LONGITUDINAL SECTION 1

mm

0 1 2 5 METER

AR-3433 AR-3223

AR-3213

32

(33)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

2100 2100 2100 2100 1710 1690 800

12600

SEE AR-212

SEE AR-211 SEE AR-213

A A-3

A-4 B

B-1 C

C-1 D

Water pan

Evaporation Cooling Wall

PV Module Steel Beam Box 150x150x4.5

Plant Pots

Green core

Gutter Gutter

Canopy

Bayer Makrolon® Polycarbonate Solid Sheet

t=6mm

Wood Plastic Composites

Delta DC Fan VFB25AEHT

Bayer Makrolon® Polycarbonate Hollow Sheet

t=16mm

Glass Louvers

Steel Beam I 150x150 t=4.5

Aluminum Louvers

Glass Louvers

Steel Beam Box 150x150 t=4.5 Wood floor Vacuum Insulation panel E foam

Duct

Footing

2388 3345 3457 6802 1005

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-202

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

LONGITUDINAL SECTION 2

mm

0 1 2 5 METER

33

(34)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

2100 2100 2100 2100

12600 1710

1690 800

SEE AR-212 SEE AR-211

SEE AR-213

A A-3 A-4 B B-1 C C-1 D

Glass Louvers Water pan

PV Module

Steel Beam Box 150x150 t=4.5

Wood Plastic Composites

Steel Beam C 150x75

Bayer Makrolon® Polycarbonate

Wood floor

Hollow Sheet

t=10mm

Vacuum Insulation panel

E-foam Delta DC Fan VFB25AEHT

Bayer Makrolon® Polycarbonate Hollow Sheet

t=16mm

Gutter

Gutter

Canopy

Footing

Bayer Makrolon

®Polycarbonate

Inter-Locking Hollow Sheet t=40mm

Aluminum Louvers Evaporation Cooling Wall Duct

Steel Beam C 150x75

2388 3181

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-203

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

LONGITUDINAL SECTION 3

mm

0 1 2 5 METER

AR-3213

34

(35)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

3600 1800 3600

9000

SEE AR-202 SEE AR-203

SEE AR-201

1 2 3 4

Water pan

Footing

PV Module

Canopy

Bayer Makrolon

®Polycarbonate

Inter-Locking Hollow Sheet t=40mm

Clear Glass

Solar Water Heater

Bed Work Station

Living Room

AC

Bedroom POLLI-Bricks

(Thermal mass)

Gutter

Gutter

Kitchen

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-211

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

TRANSVERSAL SECTIONS 1

mm

0 1 2 5 METER

AR-4311

35

IN-4114 8

IN-721

(36)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

3600 1800 3600

9000

SEE AR-202 SEE AR-203

SEE AR-201

Green core

Kitchen Tea Terrace

Bayer Makrolon® Polycarbonate Solid Sheet

t=6mm

Bayer Makrolon

®Polycarbonate

Inter-Locking Hollow Sheet t=40mm

Gutter PV Module

Canopy

Footing

Bayer Makrolon

®Polycarbonate

Hollow Sheet

t=10mm

Bayer Makrolon

®Polycarbonate

Hollow Sheet

t=10mm

Project:

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-212

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

TRANSVERSAL SECTIONS 2

mm

0 1 2 5 METER

AR-3522

AR-3512

36

IN-4223

(37)

Sand Box EL +120 EL +610 1F Beam EL +7101F EL +34102F Beam EL +3600 Mezzanine EL +7370RF Beam

EL ±0GL

SEE AR-202 SEE AR-203

SEE AR-201

1 2 3 4

1450

3600 1800 3600

9000

Canopy

Bayer Makrolon® Polycarbonate Hollow Sheet

t=10mm

Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm

Gutter

Bayer Makrolon

® Polycarbonate Hollow Sheet

t=10mm

Greencore

Bayer Makrolon® Polycarbonate Inter-Locking Hollow Sheet t=40mm

Gutter

Bayer Makrolon

® Polycarbonate Solid Sheet

t=6mm

2390 484 400

Institution:

Team Name:

Checked by Scale

DWG. Title

DWG. No.

Address:

Contact:

NCTU/UNICODE 1001 Ta-Hsueh Road Hsinchu City 30010 Taiwan www.sde.tw

Consultants:

Drawn by

Mark Date Description

Note:

DN 2013/04/01 SD Submission

A B C D E

A B C D E

DN 2013/07/01 DDc Submission ST 2013/11/01 DD Submission

Unit

ST 2014/03/03 CD Submission

PAGE

AR-213

ST 2014/04/30 CD Submission ST 2014/06/02 CD Submission

CF DN 1:60

TRANSVERSAL SECTIONS 3

mm

0 1 2 5 METER

AR-3413

AR-3512 AR-3522

37

參考文獻

相關文件

NCTU / UNICODE, team of National Chiao Tung University, is taking Solar Decathlon Europe as the opportunity to develop a prototype house for co-existing with nature by focusing

NCTU / UNICODE, a team from National Chiao Tung University (NCTU), views Solar Decathlon Europe as an opportunity to develop a prototype house for coexisting with nature by

The Orchid House harnesses natural light not only to generate electric energy through the photovoltaic panels integrated on the roof, but also to regulate the internal tem-

NCTU / UNICODE, a team from National Chiao Tung University (NCTU), views Solar Decathlon Europe as an opportunity to develop a prototype house for coexisting with nature by

NCTU / UNICODE, a team from National Chiao Tung University (NCTU), views Solar Decathlon Europe as an opportunity to develop a prototype house for coexisting with nature by

Taiwan's National Chiao Tung University (NCTU) Team Unicode is a highly integrated task force of experts in architecture, engineering, visual design, construction, communication

TEAM UNICODE is to create a single dwelling proto- type that focuses on environmental and social issues which is based on the available lot sizes and specific building

Essentially, the best and primary intention of NCTU/ TEAM UNICODE is to create a single dwelling proto- type that focuses on environmental and social issues which is based on