This article was downloaded by: [National Chiao Tung University 國立交通大學] On: 26 April 2014, At: 00:27

Publisher: Taylor & Francis

Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office: Mortimer House, 37-41 Mortimer Street, London W1T 3JH, UK

International Journal of Production Research

Publication details, including instructions for authors and subscription information: http://www.tandfonline.com/loi/tprs20

On the optimal lot-sizing and scheduling problem in

serial-type supply chain system using a time-varying

lot-sizing policy

Jia-Yen Huang a & Ming-Jong Yao b a

Department of Information Management , National Chin-Yi University of Technology , No. 57, Sec. 2, Zhongshan Road, Taiping District, Taichung City 41170 , Taiwan , Republic of China

b

Department of Transportation & Management , National Chiao Tung University , 1001 University Road, Hsinchu City 300 , Taiwan , Republic of China

Published online: 29 Mar 2012.

To cite this article: Jia-Yen Huang & Ming-Jong Yao (2013) On the optimal lot-sizing and scheduling problem in serial-type

supply chain system using a time-varying lot-sizing policy, International Journal of Production Research, 51:3, 735-750, DOI: 10.1080/00207543.2012.662604

To link to this article: http://dx.doi.org/10.1080/00207543.2012.662604

PLEASE SCROLL DOWN FOR ARTICLE

Taylor & Francis makes every effort to ensure the accuracy of all the information (the “Content”) contained in the publications on our platform. However, Taylor & Francis, our agents, and our licensors make no

representations or warranties whatsoever as to the accuracy, completeness, or suitability for any purpose of the Content. Any opinions and views expressed in this publication are the opinions and views of the authors, and are not the views of or endorsed by Taylor & Francis. The accuracy of the Content should not be relied upon and should be independently verified with primary sources of information. Taylor and Francis shall not be liable for any losses, actions, claims, proceedings, demands, costs, expenses, damages, and other liabilities whatsoever or howsoever caused arising directly or indirectly in connection with, in relation to or arising out of the use of the Content.

This article may be used for research, teaching, and private study purposes. Any substantial or systematic reproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in any

form to anyone is expressly forbidden. Terms & Conditions of access and use can be found at http:// www.tandfonline.com/page/terms-and-conditions

(2)

Vol. 51, No. 3, 1 February 2013, 735–750

On the optimal lot-sizing and scheduling problem in serial-type supply chain system

using a time-varying lot-sizing policy

Jia-Yen Huanga* and Ming-Jong Yaob a

Department of Information Management, National Chin-Yi University of Technology, No. 57, Sec. 2, Zhongshan Road, Taiping District, Taichung City 41170, Taiwan, Republic of China;bDepartment of Transportation & Management,

National Chiao Tung University, 1001 University Road, Hsinchu City 300, Taiwan, Republic of China (Received 16 September 2011; final version received 27 January 2012)

In this paper, we solve the optimal sequencing, lot-sizing and scheduling decisions for several products manufactured through several firms in a serial-type supply chain so as to minimise the sum of setup and inventory holding costs while meeting given demand from customers. We propose a three-phase heuristic to solve this NP-hard problem using a time-varying lot- sizing approach. First, based on the theoretical results, we obtain candidate sets of the production frequencies and cycle time using a junction-point heuristic. Next, we determine the production sequences for each firm using a bin-packing method. Finally, we obtain the production times of the products for each firm in the supply chain system by iteratively solving a set of linear simultaneous equations which were derived from the constraints. Then, we choose the best solution among the candidate solutions. Based on the numerical experiments, we show that the proposed three-phase heuristic efficiently obtains feasible solutions with excellent quality which is much better than the upper-bound solutions from the common cycle approach.

Keywords: serial-type supply chain; economic lot scheduling problem; inventory control; time-varying lot-sizing policy; scheduling

1. Introduction

In a flow shop production system, items have to go through several facilities before they become finished products. Similarly, from the viewpoint of a serial-type supply chain, items must experience the required manufacturing operations by visiting a series of firms in the supply chain. Figure 1 demonstrates an example of the routing and transfer operations of items in a serial-type supply chain.

Those enterprise groups, that establish ‘fully vertical-integrated’ supply chains, have to face the challenge in the production planning and scheduling from the integration among the firms in such a serial-type supply chain system (though enjoying significant advantage from the economy of huge scale). For example, Foxconn Technology Group, applying its so-called ‘single-whip’ principle, forms a serial-type supply chain system, that includes 15 factories, in Longhua Science & Technology Park, Shenzhen City of China. (Note: Foxconn Technology Group is a Taiwan-registered corporation listed among Forbes’ top 50 enterprises in 2010, and its notable products include the Amazon Kindle, iPad, iPhone, PlayStation 3, Xbox 360 and Wii. Foxconn is the largest exporter in Greater China.) In such a unique serial-type supply chain system, all the firms mutually share complete information with total confidence since each one belongs to Foxconn. The supply chain managers must pay attention to the determination of the lot sizes of different items and the generation of a feasible production schedule. Since the whole lot of a particular item on one facility must be finished before it is transferred to the next facility, and a transferred lot has to wait if another lot occupies the next facility, it is even more difficult to generate a production schedule for a serial-type supply chain than the single facility system.

Mass customisation is the new paradigm that replaces mass production, which is no longer suitable for modern commercial environment of growing product variety and opportunities for e-commerce. From this point of view, a time-varying lot-sizing (TVLS) policy is more realistic for today’s turbulent markets than a constant lot-sizing policy. Therefore, we propose a heuristic for solving the optimal lot-sizing and scheduling problem in a serial-type supply chain system using a time-varying lot-sizing policy in this paper.

*Corresponding author. Email: [email protected]

ISSN 0020–7543 print/ISSN 1366–588X online ß 2013 Taylor & Francis

http://dx.doi.org/10.1080/00207543.2012.662604 http://www.tandfonline.com

(3)

2. Literature review

Considering the setup cost and setup time incurred when the machine switches from one product to the next, the key issue is to select a production sequence and a batch size for each product run. Since this problem is frequently encountered in many industries, it has attracted the attention of many researchers over 40 years. Basically, there are three types of approaches for solving the economic lot scheduling problem (ELSP): the common cycle approach, the basic period approach, and the time-varying lot-sizing approach. Since the latter allows different lot sizes for any given product during a cyclic schedule and it usually gives better solutions than the previous two approaches, numerous papers have addressed this problem.

Maxwell (1964) first provided the time-varying lot sizes approach that relaxes the restriction of equally spaced production lots, i.e. the approach allows the lot sizes of each product to be different within a cycle time. Provided that there is enough time for setups, Dobson (1987) developed a heuristic to show that the production order in a cycle can be converted into a feasible production schedule in which the production lots are not necessarily equal. An extended study allowing the set-up time to be sequence dependent was presented by Dobson in 1992. Gallego and Roundy (1992) study the ELSP with backorders under the TVLS approach. Raza and Akgunduz (2008) consider the time-varying lot size approach to solve the ELSP, which deals with the production assignment of several different products on a given single production facility. A computational study of the existing solution algorithms, Dobson’s heuristic, hybrid genetic algorithm, neighborhood search heuristics, Tabu search and a proposed simulated annealing algorithm were presented and compared.

This presentation is different from most literatures introduced above since it solves the optimal scheduling problem in a serial-type supply chain system (with multi-facility) by time-varying lot-sizing policy. Considering this problem is closely related to the ELSP, we provide some background on the ELSP before introducing the mathematical model for the time-varying lot-sizing policy. The ELSP concerns with lot-sizing and scheduling decisions in a single production facility for n products so as to minimise the average total costs while meeting the given demands of each product. In the literature, most of the solution approaches for solving the ELSP employed a so-called ‘basic period-based cyclic schedule’ which uses a basic period as the base for production planning and scheduling. One may refer to Elmaghraby (1978), Lopez and Kingsman (1991) and Yao (1999) for the problem definition and assumptions of the ELSP. The problem formulations for the ELSP that uses basic periods can be classified as either the ‘basic period’ (BP) approach or the ‘extended basic period’ (EBP) approach. The most commonly used approach to deal with this problem is the common cycle (CC) approach where a lot of each product is produced each cycle. The CC and BP approaches can be viewed as specific cases of the EBP approach. The cost of the CC approach can be regarded as the upper bound of the cost for the ELSP.

The solution methodologies for the ELSP that have been proposed so far may be divided into two major categories: analytical and heuristic. For a given value of basic period, the analytical approaches usually employ either dynamic programming or integer nonlinear programming model; see Bomberger (1966), Elmaghraby (1978), Axsa¨ter (1982) for dynamic programming models and Haessler (1979) for binary integer programs. Hsu (1983) has shown that the single-facility ELSP problem is NP-hard.

To generate a production schedule for a flow shop production system (abbreviated as the FS-ELSP) is even more difficult than the single facility ELSP. The lot sizing and scheduling problems in flow shops have attracted many

Raw

material Producer1 item 2 item 1 item 3 item 2 item 3

P1 P2

item 2 item 1 item 3 item 2 item 3 Producer 2

item 2 item 1 item 3 item 2 item 3 Producer 3

Figure 1. The routing and transfer operations of items in a serial-type supply chain.

736 J.-Y. Huang and M.-J. Yao

(4)

researchers’ attention in the past. One may refer to the literatures including Ouenniche and Boctor (2001a, b), Huang and Yao (2006, 2008). Ouenniche and Boctor (2001 a, b) tested feasibility of their candidate solutions using the EBP approach, however, the limitation on the values of the multipliers {ki} imposed in Ouenniche and Boctor’s (2001b) two-group heuristic could significantly affect the quality of the obtained solutions. Many problems exist in Ouenniche and Boctor’s (2001a) power-of-two heuristic were pointed out in the study of Huang and Yao (2007a), especially on the feasibility testing of an obtained solution and the generation of a feasible production schedule. These problems may misjudge those solutions with better objective values as infeasible ones, and often lead Ouenniche and Boctor’s power-of-two (PoT) heuristic to worse solutions.

In the ELSP, it is typically assumed that production and demand rates are known product-dependent constants. Research on the ELSP has focused on cyclic schedules, i.e. schedules that are repeated periodically. A basic period B is an interval of time devoted to the setup and production of a subset of (or all) the items. A solution to the problem is usually given in the form of a basic period B and a set of multipliers {ki}, which implies that each item i is replenished after a fixed cycle time kiB.

Moon et al. (2002) provided a hybrid genetic algorithm based on the TVLS approach for solving the ELSP problem of a single facility where m items are produced. They try to find a cycle length, a production sequence, production time durations, and idle time durations, so that the production sequence can be completed in the chosen cycle and demand can be fully met, and the total of inventory and set-up costs is minimised.

In this paper, we will utilise the TVLS approach for solving the optimal lot-sizing and scheduling for multiple items produced through a series of production facilities. We name it as the serial-type time-varying lot-sizing problem (or, the ST-TVLS problem). Gallego and Shaw (1997) showed that solving the ELSP for a single facility using the TVLS approach is strongly NP-hard. Our interested problem in this paper is obviously even more difficult than the conventional ELSP. The TVLS approach has two advantages (Dobson 1987): First, it can avoid a feasibility checking problem that the EBP approach meets; Second, under PoT policy, the TVLS approach is a quicker solution approach than the BP and EBP approaches. Dobson (1992) presented the mathematical model for the single-facility ELSP using the TVLS approach. The difficulty for the TVLS approach is how to find an optimal production sequence by minimising the average total cost. Intuitively, the TVLS approach can get better solution than the CC and BP approaches, therefore, this paper is motivated to propose a heuristic to secure the optimal lot sizing and scheduling strategies to control the inventory in serial-type supply chains by using the TVLS approach. The rest of this paper is organised in the following manner: in Section 3, we present the ST-TVLS model. Section 4 shows our proposed three-phase heuristic. To determine the production frequencies of each member of the supply chain, we first propose a junction-point heuristic which is derived from the relaxation form of the ELSP formulation of Ouenniche and Boctor (2001a). Second, we solve the production sequence of each item by a bin-packing method. Finally, we obtain the optimal production time for all the production lot in each firm by solving a set of simultaneous equations. Section 5 gives numerical experiments and sensitivity analysis verifying that the solution quality of the proposed three-phase heuristic is much better than that obtained from the common cycle approach. Finally, Section 6 presents our concluding remarks.

3. The mathematical model

We present the mathematical model for the single-facility TVLS model and the ST-TVLS model in this section.

3.1 The single-facility TVLS model

Before presenting the formulation for the single-facility TVLS model, we first define the notation and introduce the assumptions used for deriving the mathematical model as follows.

The index i (i ¼ 1, 2, . . . , n) is used in the subscripts to refer to the ith item, while the position index ‘ ð‘ ¼1, . . . , LÞ is used in the superscripts to refer to the data related to the part produced at a certain position, where Lis the total number of items to be produced in cycle time T.

Production rate (units per day) pi i ¼1, 2, . . . , n; Demand rate (units per day) ri i ¼1, 2, . . . , n; Inventory holding cost ($ per unit per day) hi i ¼1, 2, . . . , n; Set-up cost ($) Ai i ¼1, 2, . . . , n; Set-up time (days) si i ¼1, 2, . . . , n;

(5)

Production time duration for item produced at position ‘ t‘, ‘ ¼ 1, . . . , L; Idle time duration after the production of the item at position ‘ u‘, ‘ ¼ 1, . . . , L;

Item produced at position ‘ f‘, . . . , fLðf2 f1, . . . , ngÞ

Let Jibe the position in a given sequence where item i is produced, i.e. Ji¼ f‘ j f‘¼ig. Let Lkbe the positions in

a given sequence from k (where fkis produced), up to but not including the position in the sequence where part fkis

produced again and k ¼ 1, . . . , L.

As derived by Dobson (1992), the single-facility TVLS model can be written as inf ‘2Jt0,u0,T0min 1 T XL ‘¼1 1 2h ‘ðprÞ p‘ r‘   ðt‘Þ2þX  L ‘¼1 A‘ ! : ð1Þ Subjected to X ‘2Jt ptt‘¼riT, i ¼1, . . . , n ð2Þ X ‘2Lk ðt‘þs‘þu‘Þ ¼ ðpk=rkÞtk, k ¼1, . . . , L ð3Þ XL ‘¼1 ðt‘þs‘þu‘Þ ¼T: ð4Þ

Constraints (2) indicate that one must allocate enough time to each item i to meet its demand over the cycle. Constraints (3) state that item i must be produced each time to last until the next time it is produced again. Constraint (4) means that the cycle time T must be the sum of production, setup, and idle times for all the items produced in the cycle. Note that, in order to find the production time easily, Moon (2002) assumed that there are no idle times for a given production sequence. They called this method a quick-and-dirty heuristic and claimed that this approximation works very well for a highly loaded facility. However, when considering a flow-shop production system (or a serial-type supply chain system), the idle time can no longer be neglected (Huang and Yao 2007a). We will have further discussion on this issue later.

3.2 The ST-TVLS model

In this section, we present the formulation for the ST-TVLS model for a serial-type supply chain system with m firms. Since more than one facility/firm is involved in the manufacturing process, we have to re-define the notation as follows. The index j (j ¼ 1, 2, . . . , m) is used to denote the jth firm. The problem can be viewed as one that decides cycle length (days) Tj, production sequences, production times and idle times through a serial-type supply chain so as to minimise the sum of setup and inventory holding costs while a given demand is fulfilled. The setup costs Aiof item i are the sum over all the facilities, i ¼ 1, 2, . . . , n. For each finished item in position ‘, the demand rate is denoted as r‘, and the process time (on facility m) is denoted as t‘m. For item in position ‘ on facility j, the

production rate is p‘j, and the holding cost rate (per unit per unit time) for the work-in-process (WIP) is h‘j.

To indicate the production sequence in a production schedule, we denote d‘jas the starting time of item in position ‘

on facility j.

We note that the production planning and scheduling in a serial-type supply chain system share some common characteristics with the flow-shop production system. We indicate some important features that should be taken into account in the formulation of the ST-TVLS model. As stated in Ouenniche and Boctor’s (2001a) study, when dealing with the ELSP in flow shops, no products can be transferred to the next facility before its production lot is finished at the current facility at each facility. The importance of the delayed time in the feasibility testing of a solution for the ELSP in flow shops and its effect on the total cost are thoroughly discussed by Huang and Yao (2007b). Since no facility can process more than one product at a time, and a lot is not transferred to the next facility until the entire lot is processed at the current facility, a waiting time could exist during the lot transfer between two successive facilities, which will increase total cost accordingly.

738 J.-Y. Huang and M.-J. Yao

(6)

Inspired by the models of Dobson (1992) and Ouenniche and Boctor (2001a), we present the ST-TVLS model as follows. Min Z ¼ 1 m Xm j¼1 1 Tj XL ‘¼1 A‘ ( ) þX  L ‘¼1 h‘mt ‘mr‘ 2 1  r‘ p‘m   þðr ‘Þ2 2 Xm j¼2 t‘jh‘,j1 1 p‘j 1 p‘,j1   ( ) þX m j¼2 XL ‘¼1 h‘,j1r‘ðd‘jd‘,j1Þ: ð5Þ Subjected to X ‘2Jt p‘jt‘j¼r‘Tj, i ¼1, . . . , n, j ¼ 1, . . . , m ð6Þ X ‘2Lk ðt‘jþs‘jþu‘jÞ ¼ ðpkj=rkjÞtkj, k ¼1, . . . , L, j ¼ 1, . . . , m ð7Þ XL ‘¼1 ðt‘jþs‘jþu‘jÞ ¼Tj, j ¼1, . . . , m: ð8Þ

4. The proposed three-phase heuristic

We propose a three-phase heuristic for solving the ST-TVLS model in this section. We first give an overview of the three-phase heuristic as follows. In the first phase, we obtain candidate sets of the production frequencies and cycle time using a junction-point heuristic. The second phase determines the production sequences for each firm using a bin-packing method. Finally, in the third phase, we obtain the production times of the products for each firm in the supply chain system by iteratively solving a set of linear simultaneous equations which were derived from the constraints. Then, we choose the best solution among the candidate solutions. Figure 2 displays a flowchart for the proposed three-phase heuristic.

1st phase: Secure the production frequency of each facility of the supply chain by junction-point searching heuristic

2nd phase: Solving the production sequence of each facility

3rd phase: Determination of the production times, idle times and lots

To next junction point

Optimal Solution Yes

No Are all the junction

points been tested?

Figure 2. The proposed three-phase heuristic for solving the ST-TVLS problem.

(7)

We will discuss the details of each phase in the following subsections.

4.1 Phase one: search for the production frequency

In this phase, we determine the production frequencies by solving a relaxation formulation of Ouenniche and Boctor’s (2001a) model which was solved under the PoT policy, i.e. the cycle time of each item Tiis a PoT integer multiplier of a basic period B (Ti¼kiBwhere ki¼2i, iis a non-negative integer). When using a PoT policy, one

should examine the production schedule of a global cycle of KB, where K ¼ lcm{ki} ¼ max{ki}. Note that if we did not use PoT policy, the value of lcm{ki} could be very large in some extreme cases where there are prime numbers in the set {ki}. Therefore, we confine the scope of this study under PoT policy.

Our phase-one heuristic aims at determining the optimal value of the basic period B, the set of optimal replenishment frequencies, a feasible assignment with its corresponding production sequence, and the starting times so as to minimise the average total costs. It obtains an approximation solution of the production frequencies by relaxing Ouenniche and Boctor’s (2001a) model. More specifically, by substituting the term d‘jd‘,j1¼t‘,j1into

Equation (5), the objective function of the relaxed problem is reorganised as ðRÞ Zðk1, k2, . . . , kn, BÞ ¼ Xn i¼1 TCiðki, BÞ ¼ Xn i¼1 C1i kiB þC2ikiB   ð9Þ where C1i¼Ai C2i¼hi ri 2 1  ri pim   þr 2 i 2 Xm j¼2 hi,j1 1 pij þ 1 pi,j1  

Since the terms on the right-side of (9) are notably separable, we are motivated to study the properties of TCiðki, BÞ so as to establish foundation for our new heuristic. The following heuristic focuses on the multipliers ki

because the solution of ST-TVLS model does not include the search for the basic period. Let us define a new function TC

iðBÞby taking the optimal value of kiat any value B04 0 for the function TCiðki, BÞ as follows.

TC iðB0Þ ¼ min ki2Nþ TCiðkiðBÞ, BÞ 8B ¼ B00     : ð10Þ

That the function TC

iðBÞis a piece-wise convex with respect to B can be easily proved by referring to Huang and

Yao’s papers (2005, 2006). Consequently, the problem (R) can be re-written by R1 ð Þ ðBÞ ¼ inf B40 Xn i¼1 TCiðBÞ ( ) : ð11Þ

where the function ðBÞ is the optimal objective function value of problem (R1) with respect to B. Since the ðBÞ function is the sum of a convex function and n piece-wise convex functions, it is obvious piece-wise convex with respect to B. The junction point for piece-wise convex function TC

iðBÞcan be defined as a particular value of B

where two consecutive convex curves TCiðki, BÞ and TCið2ki, BÞ concatenate (Huang and Yao 2006). Importantly,

such a junction point provides us with the information on at ‘what value of B’ where one should change its multiplier value from kito 2kiso as to secure the optimal value for the TC

iðBÞfunction. A closed form to locate the

junction points can be derived by letting the difference between TCiðki, BÞ and TCið2ki, BÞ to be zero. Then we have

the junction point for the multipliers kiand 2kiof product i as iðkiÞ ¼ 1 ki ffiffiffiffiffiffiffiffiffi C1i 2C2i r ð12Þ The following inequality (13) holds for the junction points.

iðvÞ5    5 iðk þ1Þ 5 iðkÞ   5 ið2Þ 5 ið1Þ ð13Þ

740 J.-Y. Huang and M.-J. Yao

(8)

where v is an (unknown) upper bound on the value of k. Theorem 1 is an immediate result from Equations (12) and (13).

Theorem 1: With regard to a junction point w of the TC

iðBÞ function, suppose that kL and kR are the optimal

maintenance frequencies for the convex curves on the left side (i.e. B  w) and the right side (i.e. B 4 w) of w, respectively, then k

L¼2kR.

As shown in the studies of Yao (1999, 2005) and Huang (2006), all the junction points for each facility will be inherited by the ðBÞ function. In other words, if w is a junction point for a product i, w must also show as a junction point on the piece-wise convex curve of the ðBÞ function. The following corollary is a by-product of theorem 1, and it provides an easier way to obtain the optimal maintenance frequency k

iðBÞ 2 Nþ for the TCiðBÞfunction for any

given B 4 0.

Corollary 1: For any given B4 0, an optimal value of k

iðBÞ 2 Nþ for the TCiðBÞ function is given by

k iðBÞ ¼ 1 B4 ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiC1i=C2i p 2p, ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiC 1i=C2i p =2p5 B  ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiC 1i=C2i p =2p1; p 2 Nþ  : ð14Þ KPoTðBÞð¼ fkiðBÞg n

i¼1Þis denoted as the set of optimal production multipliers of item i at time B. Recall that the

TC

iðBÞfunction is piece-wise convex with respect to B, these theoretical results encourage us to solve the problem

(R) by searching along the B-axis. To design a search algorithm that obtains an optimal solution for the problem (R), one need to define the search range by a lower and an upper bound on the B-axis, which are denoted by BLand

BU, respectively. The best local minimum in ½BL, BU must be no worst than any solution outside this searching

range. One may refer to Huang and Yao’s paper (2008) for the derivation of lower and an upper bound. Under PoT policy, we may serve Bcc/2 as the lower bound, i.e. Bmin¼Bcc/2. While, the upper bound on the search range can be obtained by the common cycle (CC) approach in which it requires that ki¼1 for all i, i.e. all of the products share a common production cycle. We set

Bcc¼ ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffi Xn i¼1 C1i . Xn i¼1 C2i s ð15Þ For any given vector of k, one may locate its local minimum, B^ðkÞ, by taking the first derivative of the objective function ðBÞ and equating it to zero.

B^ðkiÞ ¼ ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffi Xn i¼1 C1i=ki ! . Xn i¼1 C2iki ! v u u t ð16Þ

It is obvious that B^ðkÞ  Bccsince ki1 for all i. Therefore, there exists no local minimum for B 4 Bcc; that is,

there exist no local minima for B 4 Bcc for the ðBÞ function.

By the rationale discussed above, the proposed search algorithm for our phase-one heuristic is summarised as follows.

Step 1: The initialisation.

(a) Obtain the common cycle period Bccby Equation (15). Let ‘ ¼0 and locate the smallest junction point that

is greater than (or equal to) Bcc, and define it as w0¼minfiðkiÞ: iðkiÞ4 Bccg. If w0does not exist, let ‘ ¼1,

w0¼Bcc, K1¼ f1, . . . , 1g, B1¼Bcc, and calculate the cost ðK

^

1, BccÞ.

(b) Obtain the multipliers by Equation (14). Calculate  ¼ arg maxifiðkiÞ5 w0gand let w1¼ðkÞ, j ¼ 1. If the

local minimum locates within ½w1, w0, i.e., B

^ ðKPoTðBccÞÞ 2 ½w1, w0, let ‘ ¼ 1, K ^  ‘¼KPoTðBccÞ , B^‘¼ B ^ ðK^‘Þand compute ðK ^  ‘, B ^  ‘Þ.

Step 2: The search procedure.

(a) Calculate the next set of multipliers KPoTðwjÞby KPoTðwjÞ  ðKPoTðwj1ÞnfkgÞ [ f2kg.

(b) Find  ¼ arg maxifiðkiÞ5 wjgand let wj¼ðkÞ.

(c) If B^ ðKPoTðBccÞÞ 2 ½wjþ1, wj, let ‘ ¼ ‘ þ1, K ^  ‘¼KPoTðwjÞ, B ^  ‘¼ B ^ ðK^Þand compute ðK ^  ‘, B ^  ‘Þ. Step 3: Let j ¼ j þ 1. If wj5 B ^

1=2, then go to Step 4, otherwise go back to Step 2.

(9)

Step 4: Secure a candidate of the multipliers ðK

PoT, BPoTÞ ¼arg min‘fðK

^

 ‘, B

^



‘Þg. Once the optimal multipliers are

secured (the basic period can be neglected), one can obtain the production frequency y, which is the inverse of the multipliers.

4.2 Phase two: find the production sequence

The production sequence can be determined by using the bin-packing heuristic which has been suggested by many researchers (Doll and Whybark 1973, Dobson 1987). Once the production frequency y is obtained from phase one, the bin-packing heuristic attempts to spread them out as evenly as possible. We create b bins in which b ¼ maxifkig.

For each product i, the production time duration viis estimated by vi¼siþ ðrit=pikiÞ. The lots is assumed to be

equally spaced, that is, we do the bin-packing with b bins and yiitems of height vifor all i. Although, the value of t is not determined yet at this moment, the value of ri=piki can be used as a reference value for comparison since

si ðrit=pikiÞ. The products are ordered lexicographically (yi,vi)by using a variation of the longest processing time

(LPT) rule. The products are ordered by frequency yi first, then by ri=piki, among products with identical

frequencies. By minimising the maximum height of the bin, production sequence f can be determined (one may refer to Dobson (1987) for details).

4.3 Phase three: determine the production times, idle times and total cost

In the third phase, we first secure the position set Lk ðk ¼1, . . . , LÞ. Then, we obtain the production time

t‘1, ‘ ¼ 1, . . . , Lof the first firm in the supply chain by solving a system of linear equations induced from constraints (7). The cycle time T can be obtained from either constraint (6) or (8). Next, we will calculate the production times for all the downstream firms.

Note that the waiting time u‘jð‘ ¼1, . . . , L, j ¼ 2, . . . , mÞ during the batch transfer between two neighbouring

facilities (i.e. to calculate the values of d‘,jd‘,j1) needs to be taken accounts, although there is no feasibility

problem for a ST-TVLS problem. The value of d‘j for all facilities in sequence can be obtained by the following

steps.

For the first firm in the supply chain system ( j ¼ 1), the starting time can be determined as follows: d11 ¼s1,

d‘1¼d‘1,1þt‘1,1þs‘, ‘ ¼2, . . . , L: ð17Þ

The starting times for the following firms ( j 4 1) are as follows: d1j¼d1,j1þt1,j1þs1,

dkj¼maxðdk1,jþtk1,jþsk, dk,j1þtk,j1þskÞ k ¼2, . . . , L: ð18Þ The production times t‘1, ‘ ¼ 1, . . . , L of the first firm in the supply chain system are calculated by solving a

system of linear equations induced from constraints (7). ðpkj=rk1Þtkj X

‘2Lk=k

t‘j¼X

‘2Lk

ðs‘jþu‘jÞ, k ¼1, . . . , L, j ¼2, . . . , m: ð19Þ This equation assures that enough product i must be produced each time to last until the next time it is produced again. Since two sets of unknowns are to be determined, the processing times tkj and idle times ukj, an iterative

process is necessary because the simultaneous equations are not enough for solving all the unknowns at a time. One may first calculate an initial value of tkj, and accordingly secure a set of waiting time ukj. The final values of tkj and

ukj are determined through an iterative process until their values no longer vary. The details of our phase-three heuristics are summarised as follows.

Step 1: Calculate Lk, k ¼ 1, . . . , L.

742 J.-Y. Huang and M.-J. Yao

(10)

Step 2: Determine the processing time of the finished goods (i.e. the production time of the final facility of the supply chain, tkm

1 ) by solving the simultaneous equations which is reorganised from Equation (19)

as follows ð1  pkj=rkÞtkjþ X ‘2Lk=k t‘j¼ X ‘2Lk ðs‘jþu‘jÞ, k ¼1, . . . , L:

Step 3: Determine the production time of the rest of facilities by tkj¼pkmtkm=pkj, which assure the continuity of the

production lot transferring between different facilities.

Step 4: If it is the first time iteration, go to Step 5. Otherwise, check the convergence of the iteration by examining the value of tkjwith its previous value for all the facilities of the supply chain. If all the production values keep the same, which means that the production times are determined. After the calculation of the total production time of each facility Tj and the total cost of the supply chain ðK, BjÞ, one should go back to phase one to test next

junction point. If all the junction points have been investigated, go to Step 6.

Step 5: Calculate the starting time dkj and waiting time ukj, j ¼ 1, . . . , m  1, k ¼ 1, . . . , L, from the first facility to

the last one. Go back to Step 2.

Step 6: The optimal solution can be determined by ðK

, BjÞ ¼arg minfðK, BjÞg.

5. Numerical experiments

In this section, we first use an example to demonstrate the implementation of the proposed three-phase heuristic. Then, we conduct random experiments. The third part presents sensitivity analysis on the effect of the setup time, the setup cost and the holding cost.

5.1 A demonstrative example

Here, we take an example with five facilities and 10 products, with its data set shown in Table 1, to demonstrate the implementation of the proposed three-phase heuristic.

Note that only one set of multiplier (that is, one junction point) is chosen as a candidate of the production frequency each time in the first phase. And then, the corresponding production sequence, the idle time and the average total cost are determined through phase two and three. After the first round, we go back to phase one to choose another candidate of the production frequency and to go round and begin again until we finish the searching of all the junction points. Among all these tests, the set of multiplier with the minimum cost will be the optimal solution.

Before starting a searching process, the feasibility criteria for each facility in the supply chain system, Pn

i¼1ri=pi5 1, should be test. The feasible criteria for each facility are fulfilled, as listed in Table 2.

Next, we present the implementation details of the proposed three-phase heuristic. Phase 1:Search for the production frequency.

(1) Obtain the upper bound on the search range by Equation (15), we have Bcc¼11.62. Set  ¼ 1. Calculate the junction points of all the products, as shown in Table 3.

(2) We have the first junction point locate at w1¼11.62.

(3) Obtain the production frequency of each product, that is, the multipliers KPoTðiÞ ¼

{1, 1, 1, 1, 1, 1, 1, 1, 1, 1}.

Phase 2: Find the production sequence of the products by using our bin-packing heuristic. In this example, the products are manufactured in the fifth firm using the following production sequence: ð f1, f2, . . . , fLÞ ¼

(9, 4, 3, 8, 7, 1, 5, 6, 2, 10).

Phase 3:Determine the production times, idle times and total cost.

(11)

Table 1. The data set of the demonstrative example. Product i Producer j Demand rate ri Production rate pij Setup time ij Sum of setup cost Ai Inventory cost hij 1 1 376.6 7638.4 0.24 66.7 0.0040 2 5365.6 0.16 0.0021 3 6845.9 0.34 0.0031 4 6433.3 0.19 0.0047 5 8624.5 0.30 0.0047 2 1 212.4 5496.3 0.24 85.7 0.0047 2 6791.2 0.23 0.0043 3 9796.8 0.30 0.0012 4 7224.8 0.26 0.0021 5 10737.5 0.31 0.0031 3 1 589.6 9306.2 0.34 71.4 0.0028 2 10741.1 0.18 0.0043 3 5698.3 0.22 0.0042 4 9550.8 0.18 0.0018 5 7467.9 0.29 0.0022 4 1 502.5 5210.5 0.21 95.9 0.0046 2 10292.9 0.22 0.0039 3 6947.7 0.22 0.0040 4 6236.3 0.21 0.0013 5 5672.9 0.34 0.0010 5 1 411.1 5927.7 0.21 148.9 0.0013 2 8317.9 0.18 0.0040 3 6238.8 0.21 0.0018 4 9326.3 0.32 0.0022 5 10236.4 0.24 0.0011 6 1 201.7 10610.1 0.23 138.4 0.0040 2 6374.9 0.28 0.0023 3 6642.7 0.27 0.0038 4 5615.2 0.25 0.0017 5 7995.2 0.33 0.0021 7 1 450.7 10944.6 0.26 92.0 0.0030 2 7356.9 0.27 0.0039 3 9654.0 0.18 0.0014 4 8184.9 0.30 0.0022 5 9617.9 0.35 0.0050 8 1 602.1 6232.9 0.31 141.7 0.0014 2 5673.1 0.25 0.0012 3 10450.4 0.20 0.0039 4 6344.8 0.23 0.0042 5 7805.6 0.22 0.0019 9 1 733.7 7317.0 0.16 134.3 0.0029 2 6295.0 0.22 0.0022 3 8531.6 0.23 0.0027 4 5342.8 0.33 0.0046 5 5137.4 0.30 0.0013 10 1 191.1 9664.2 0.16 130.9 0.0015 2 6122.8 0.23 0.0028 3 9836.8 0.33 0.0022 4 6128.3 0.15 0.0034 5 10248.3 0.26 0.0012

744 J.-Y. Huang and M.-J. Yao

(12)

Step 1: Calculate Lk, k ¼ 1, . . . , Las: L1¼ð1, 2, 3, 4, 5, 6, 7, 8, 9, 10Þ; L2¼ð2, 3, 4, 5, 6, 7, 8, 9, 10, 1Þ; L3¼ð3, 4, 5, 6, 7, 8, 9, 10, 1, 2Þ; L4¼ð4, 5, 6, 7, 8, 9, 10, 1, 2, 3Þ; L5¼ð5, 6, 7, 8, 9, 10, 1, 2, 3, 4Þ; L6¼ð6, 7, 8, 9, 10, 1, 2, 3, 4, 5Þ; L7¼ð7, 8, 9, 10, 1, 2, 3, 4, 5, 6Þ; L8¼ð8, 9, 10, 1, 2, 3, 4, 5, 6, 7Þ; L9¼ð9, 10, 1, 2, 3, 4, 5, 6, 7, 8Þ; L10 ¼ð10, 1, 2, 3, 4, 5, 6, 7, 8, 9Þ:

Set  ¼ 1 (use  as the record of the number of iteration). Step 2: Utilise the linear simultaneous equations,

ð1  pkj=rkÞtkjþ X

‘2Lk=k

t‘j¼ X

‘2Lk

ðs‘jþu‘jÞ, k ¼1, . . . , L, to determine the processing time of the finished products, that is tkm

1 . We have the set of the processing time of the

fifth firm as {1.00, 0.62, 0.56, 0.54, 0.33, 0.31, 0.28, 0.18, 0.14, 0.13}.

Step 3: Determine the production times of the other firms by tkj ¼pkmtkm

 =pkj. The results are shown in Table 4.

Step 4: Check the convergence of the iteration. Since it is the first time of iteration,  ¼ 1, go to Step 5.

Step 5: Calculate the starting time dkj and waiting time ukj, j ¼ 1, . . . , m  1, k ¼ 1, . . . , L, from the first firm to the

last one, as shown in Tables 5 and 6, respectively.

Table 4. The production time of the firms.

Firm j Production time tkj1 k ¼1 k ¼2 k ¼3 k ¼4 k ¼5 k ¼6 k ¼7 k ¼8 k ¼9 k ¼10 1 0.70 0.68 0.45 0.68 0.29 0.35 0.49 0.13 0.27 0.14 2 0.82 0.34 0.39 0.75 0.43 0.49 0.35 0.22 0.22 0.22 3 0.60 0.51 0.73 0.41 0.33 0.39 0.46 0.21 0.15 0.14 4 0.97 0.57 0.43 0.67 0.39 0.41 0.31 0.25 0.21 0.22 5 1.00 0.62 0.56 0.54 0.33 0.31 0.28 0.18 0.14 0.13

Table 3. The junction points.

i 1 2 3 4 5 6 7 1 0.08044 0.16883 0.33766 0.67532 1.35064 2.70128 5.40255 2 0.16187 0.32374 0.64748 1.29495 2.58990 5.17980 10.35960 3 0.08613 0.17226 0.34452 0.68904 1.37807 2.75615 5.51229 4 0.12711 0.25423 0.50846 1.01691 2.03383 4.06765 8.13530 5 0.20745 0.41490 0.82979 1.65959 3.31918 6.63836 13.27671 6 0.24690 0.49380 0.98760 1.97520 3.95041 7.90081 15.80163 7 0.09221 0.18443 0.36885 0.73771 1.47542 2.95084 5.90167 8 0.12720 0.25440 0.50880 1.01761 2.03521 4.07042 8.14084 9 0.10465 0.20930 0.41861 0.83722 1.67444 3.34888 6.69775 10 0.31582 0.63164 1.26327 2.52655 5.05310 10.10620 20.21239

Table 2. Feasibility testing.

Firm Pni¼1ri=pi 1 0.59 2 0.60 3 0.56 4 0.63 5 0.58

(13)

Set  ¼  þ 1 ¼ 2 and continue the iteration. Go back to Step 3 of Phase 3, we have, at the second time, the production time of the finished product as {1.00, 0.62, 0.56, 0.54, 0.33, 0.31, 0.28, 0.18, 0.14, 0.13}. We update the production times and waiting times of each firm, and summarise the information in Table 7.

Step 4: Check the convergence of the iteration.

(a) Since the values of all the production lots keep the same, this iteration converges, and the production times are thus determined.

(b) We obtain the total production time of each firm Tj as T1¼6.536, T2¼6.942, T3¼6.776, T4¼6.840 and T5¼7.031.

(c) Calculate the total cost of the supply chain system 1ðK1, B1jÞ ¼$220.83.

(d) Proceed with the next junction point starting from phase 1 again at the next iteration. Next iteration: Set  ¼  þ 1 ¼ 2.

(1) Since w2¼10:36 4 Bcc=2, we continue the investigation by checking the next junction point.

(2) The value  ¼ arg maxifiðkiÞ5 wg ¼2 means that the multiplier of product number two needs to be

updated, i.e. w2¼2ðk2Þ.

(3) By utilising KPoTðw2Þ (KPoTðw1Þ\{k2}) [ 2k2}, we have KPoTðw2Þ ¼{1, 2, 1, 1, 1, 1, 1, 1, 1,}.

(4) Following the same procedures, we have 2ðK2, B2jÞ ¼$162.25.

According to our results, the proposed three-phase heuristic investigated only 7 junction points before termination, and the information on their locations and corresponding costs are summarised in Table 8.

Table 7. Production time of each firm.

Firm j Production time tkj1 k ¼1 k ¼2 k ¼3 k ¼4 k ¼5 k ¼6 k ¼7 k ¼8 k ¼9 k ¼10 1 0.70 0.68 0.45 0.68 0.29 0.35 0.49 0.13 0.27 0.14 2 0.82 0.34 0.39 0.75 0.43 0.49 0.35 0.22 0.22 0.22 3 0.60 0.51 0.73 0.41 0.33 0.39 0.46 0.21 0.15 0.14 4 0.97 0.57 0.43 0.67 0.39 0.41 0.31 0.25 0.21 0.22 5 1.00 0.62 0.56 0.54 0.33 0.31 0.28 0.18 0.14 0.13

Table 5. The starting time of each firm.

j d1j d2j d3j d4j d5j d6j d7j d8j d9j d10j 1 0.16 1.07 2.09 2.85 3.79 4.32 4.87 5.59 5.96 6.40 2 1.08 2.12 2.72 3.78 4.79 5.38 6.06 6.69 7.14 7.59 3 2.13 2.96 3.69 4.72 5.40 6.22 6.81 7.55 8.06 8.54 4 3.07 4.24 4.99 5.66 6.62 7.20 7.93 8.49 9.00 9.36 5 4.33 5.68 6.59 7.37 8.26 8.89 9.44 10.05 10.53 10.93

Table 6. The waiting time of each firm.

j u1j u2j u3j u4j u5j u6j u7j u8j u9j u10j 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 0.00 0.00 0.07 0.42 0.00 0.00 0.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.11 0.10 0.15 0.00 0.00 0.00 0.00 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

746 J.-Y. Huang and M.-J. Yao

(14)

As shown in Table 8, the optimal solution can be determined by ðK

, BjÞ ¼arg minfðK, BjÞg. The minimum

total cost is located in the last iteration with the value of $162.25. In this example, the optimal cost ($162.25) is significantly less than that from the common cycle ($220.83), which is well known as an upper-bound solution, by 26.5%.

5.2 Random experiments

We randomly generate the instances for our numerical experiments by picking the parameters values from the following uniform distribution functions: the demand rate from UNIF [140–740], the production rate from UNIF [5000–11,000], the setup time from UNIF [0.15–0.35], setup cost in UNIF [60–150], holding cost in UNIF [0.001– 0.005]. We have a total of 16 combinations of the number of firms (m) and the number of items (n) with m ¼ 3, 5, 7, 10 and n ¼ 5, 10, 15, 20, and tested 250 randomly generated instances for each combination.

Recall that the solution from the common cycle approach may serve as an upper bound for the ST-TVLS model. Therefore, we compare the solution from the proposed three-phase heuristic with that from the common cycle approach. Also, we define a performance measure CR, which is the percentage of cost reduction, by

CR ¼ðCCÞ=CC100% ð20Þ

We carried out our numerical experiments on a PC (Pentium 4 CPU 3.2 GHz with 1 G RAM). After solving the instances, we summarised the statistics of CR for all the combinations in Table 9.

We have two interesting observations from Table 9:

(1) As the number of firms (m) increases, the average cost reduction increases. It is evident that our three-phase heuristic can obtain a much better schedule than the common cycle approach, and the advantage turns more significant for those larger size serial-type supply chains.

(2) Note that we solve all the instances (i.e. a total of 4000 instances) in 12.29 seconds. The average run time for those m ¼ 10 instances is only 0.6 seconds longer than those m ¼ 3 instances. Therefore, our numerical results show that the proposed three-phase heuristic is able to effectively solve solution with excellent quality.

5.3 Sensitivity analysis

Here, we conduct sensitivity analysis of the setup time, the setup cost and the holding cost on the optimal solution quality. First, we set up the baseline ranges for the setup time, the setup cost and the holding cost as [0.15–0.35], UNIF [60–150], and [0.001–0.005], respectively. Then, in our sensitivity analysis, we change the range of a particular parameter by multiplying its baseline range by the factors of 1, 2, 3, 5 and 10, respectively. For example, as the baseline range of the setup time multiplies by factor 2, it becomes UNIF [0.30–0.70]. Using the combination of 10 firms and 10 products as our base, we summarise the results of our sensitivity analysis in Tables 10.

We would like have some discussions on our sensitivity analysis as follows:

(1) The higher the holding cost, the smaller the cost reduction. In other words, the common cycle approach is apt to obtain a close-to-optimal solution as the holding cost is high. One may observe a similar trend in the setup time, and it is even more sensitive than the holding cost.

Table 8. The searching process.

w k1 k2 k3 k4 k5 k6 k7 k8 k9 k10 ðK, BjÞ 11.620 1 1 1 1 1 1 1 1 1 1 220.83 10.360 1 2 1 1 1 1 1 1 1 1 282.74 8.140 1 2 1 1 1 1 1 2 1 1 233.87 8.135 1 2 1 2 1 1 1 2 1 1 256.73 6.700 1 2 1 2 1 1 1 2 2 1 188.75 5.900 1 2 1 2 1 1 2 2 2 1 178.69 5.510 1 2 2 2 1 1 2 2 2 1 162.25

(15)

(2) The average CR decreases as the number of items increases. It is because the value of Pni¼1ri=pi

increases when the number of items increases, and the common cycle approach becomes favourable in such a case.

Finally, Table 11 presents the sensitivity analysis of the setup cost on the values of CR. One may observe that the average CR increases with the values of the setup cost.

Table 11. The relation between cost reduction and setup cost.

Number of firms m

Number of items n

Average cost reduction (percentage) Setup cost UNIF [6–15] Setup cost UNIF [60–150] Setup cost UNIF [600–1500] 3 5 4.1 8.3 8.8 10 1.5 9.2 13.6 15 0.2 4.8 15.2 20 0.1 1.2 10.8 5 5 3.5 12.2 14.8 10 0.9 12.5 20.4 15 0.2 4.7 19.9 20 0.0 1.2 14.3 7 5 3.3 15.0 19.5 10 0.4 14.5 26.8 15 0.1 3.8 22.6 20 0.1 1.0 15.8 10 5 3.1 19.5 25.3 10 0.2 16.4 32.3 15 0.1 3.7 26.3 20 0.0 0.9 16.8

Table 10. The sensitivity analysis on the three parameters.

Parameters Factor

Cost reduction (percentage) Min. CR (%) Max. CR (%) Avg. CR (%) Setup time 1 0.0 39.2 16.4 3 0.0 6.0 0.3 5 0.0 0.2 0.0 7 0.0 0.0 0.0 10 0.0 0.0 0.0 Setup cost 1 0.0 39.2 16.4 3 2.2 44.7 26.0 5 3.8 48.0 29.3 7 5.7 47.2 30.4 10 12.1 55.2 32.3 Holding cost 1 0.0 39.2 16.4 3 0.0 18.7 5.7 5 0.0 14.2 2.5 7 0.0 7.1 0.5 10 0.0 5.4 0.2

Table 9. The cost reduction for different number of firms and items.

Number of firms m

Number of items n

Cost reduction (percentage) Min. CR (%) Max. CR (%) Avg. CR (%) 3 5 0 28.5 8.3 10 0 23.5 9.2 15 0 19.4 4.8 20 0 14.8 1.2 5 5 0 30.9 12.2 10 0 27.8 12.5 15 0 20.5 4.7 20 0 17.2 1.2 7 5 0 39.0 15.0 10 0 32.1 14.5 15 0 18.7 3.8 20 0 16.0 1.0 10 5 0 43.7 19.5 10 0 39.2 16.4 15 0 19.5 3.7 20 0 12.9 0.9

748 J.-Y. Huang and M.-J. Yao

(16)

6. Concluding remarks

In this paper, we solve the optimal sequencing, lot-sizing and scheduling decisions for several products manufactured through several firms in a serial-type supply chain so as to minimise the average of total costs. Using a time-varying lot-sizing policy, we formulate the ST-TVLS model for the concerned problem. We propose a three-phase heuristic that obtains the production frequencies of each product, find the production sequence and determine the production times as well as idle times for all the production lots in the three phases. Based on our numerical experiments, we demonstrate that the proposed three-phase heuristic not only is effective, but also obtains solutions much better than the upper-bound solutions from the common cycle approach.

Some topics may serve as possible extensions of this study in the future. One could extend the decision making scenario of the lot-sizing and scheduling problem to a supply chain system with a more general structure, e.g. an assembly-type supply chain, etc. As one may easily figure that the co-ordination among the scheduling of the production lots from branches of the supply chain system could become a problem with severe challenge. Another one could be the integration of the lot-sizing and scheduling problem in a serial-type supply chain system with the transportation operations. The key issue could be the trade-off between the effect of shipment consolidation in transportation and reducing number of setups in production and the economies of scale in holding inventory.

Acknowledgements

This work was supported by the National Science Council of Taiwan under grant number NSC NSC 95-2416-H-275-005.

References

Axsa¨ter, S., 1982. Alternative dynamic programming approaches to obtain upper bounds for the economic lot scheduling problem. Engineering Costs and Production Economics, 6 (1), 17–23.

Bomberger, E., 1966. A dynamic programming approach to a lot size scheduling problem. Management Science, 12 (11), 778–784.

Dobson, G., 1987. The economic lot scheduling problem: achieving feasibility using time-varying lot sizes. Operations Research, 35 (5), 764–771.

Dobson, G., 1992. The cyclic lot scheduling problem with sequence-dependent setups. Operations Research, 40 (4), 736–749. Doll, L. and Whybark, C., 1973. An iterative procedure for the single machine, multiproduct lot scheduling problem.

Management Science, 20 (1), 50–55.

Elmaghraby, S.E., 1978. The economic lot scheduling problem (ELSP): review and extension. Management Science, 24, 587–597. Gallego, G. and Roundy, R., 1992. The economic lot scheduling problem with finite backorder costs. Naval Research Logistics,

39 (5), 729–739.

Gallego, G. and Shaw, X., 1997. Complexity of the ELSP with general cyclic schedules. IIE Transactions, 29 (2), 109–113. Haessler, R., 1979. An improved extended basic period procedure for solving the economic lot scheduling problem. AIIE

Transactions, 11 (4), 336–34.

Huang, J.Y. and Yao, M.J., 2005. On optimally coordinating inventory for a deteriorating item in a supply chain system with a single-vendor and multiple-buyers. Journal of the Chinese Institute of Industrial Engineers, 22 (6), 473–484.

Huang, J.Y., 2006. New search algorithm for solving the maintenance scheduling problem for a family of machines. Optimisation Methods and Software, 21 (3), 461–477.

Huang, J.Y. and Yao, M.J., 2006. An improved heuristic for solving the economic lot scheduling problem in flow shops under power-of-two policy. Journal of the Chinese Institute of Industrial Engineers, 23 (2), 127–140.

Huang, J.Y. and Yao, M.J., 2007. On the production scheduling for the multi-product economic lot-sizing problem in flow shop. International Journal of Advanced Manufacturing Technology, 33 (5), 560–578.

Huang, J.Y. and Yao, M.J., 2008. A genetic algorithm for the multi-product economic lot sizing and scheduling problem in flow shops. International Journal of Production Research, 46 (14), 3737–3761.

Hsu, W.L., 1983. On the general feasibility of scheduling lot sizes of several products on one machine. Management Science, 29, 93–105.

Lopez, M.A. and Kingsmans, B.G., 1991. The economic lot scheduling problem: theory and practice. International Journal of Production Economics, 23 (1–3), 147–164.

Maxwell, W., 1964. The scheduling of economic lot sizes. Naval Research Logistics Quarterly, 11 (2), 89–124.

Moon, I., Silver, E.A., and Choi, S., 2002. Hybrid genetic algorithm for the economic lot-scheduling problem. International Journal of Production Research, 40 (4), 809–824.

(17)

Ouenniche, J. and Boctor, F.F., 2001a. The multi-product, economic lot-sizing problem in flow shops: the power-of-two heuristic. Computer and Operations Research, 28 (12), 1165–1182.

Ouenniche, J. and Boctor, F.F., 2001b. The two-group heuristic, to solve the multi-product, economic lot-sizing and scheduling problem in flow shops. European Journal of Operational Research, 129 (3), 539–554.

Raza, S.A. and Akgunduz, A., 2008. A comparative study of heuristic algorithms on economic lot scheduling problem. Computers and Industrial Engineering, 55 (1), 94–109.

Yao, M.J., 1999. The economic lot scheduling problem with extension to multiple resource constraints. Unpublished Dissertation (PhD). North Carolina State University, Raleigh, North Carolina, USA.

Yao, M.J., 2005. The economic lot scheduling problem without capacity constraints. Annals of Operations Research, 133 (1–4), 193–205.

750 J.-Y. Huang and M.-J. Yao

數據

Figure 1. The routing and transfer operations of items in a serial-type supply chain.
Figure 2. The proposed three-phase heuristic for solving the ST-TVLS problem.
Table 1. The data set of the demonstrative example. Product i Producer j Demandrate r i Productionrate pij Setuptime  ij Sum of setup cost A i Inventorycost hij 1 1 376.6 7638.4 0.24 66.7 0.0040 2 5365.6 0.16 0.0021 3 6845.9 0.34 0.0031 4 6433.3 0.19 0.00
Table 4. The production time of the firms.
+4

參考文獻

相關文件

In Sung Dynasty while Ch’an was popular, Ch’an Buddhism who don’t pay attention to words accept the benefits of text printing and binding, and began to produce a lot of

By using the case study and cross analysis of the results, The Purpose of this research is find out the Business implementing Supply Chain Management system project, Our study

Therefore, this study proposes a Reverse Logistics recovery scheduling optimization problem, and the pallet rental industry, for example.. The least cost path, the maximum amount

After 1995, the competitive environment changed a lot in Taiwan, the cost of employee and land got higher and higher, the medium and small enterprises in Taiwan faced to

Li, “Concurrent engineering: a strategy for procuring construction projects,” International Journal of Project Management, Vol. Towill and D.R., “Time compression and supply chain

A., “Linking the Supply Chain Using the Theory of Constraints Logistical Applications and a New Understanding of the Role of Inventory/Buffer Management,. “

Episcopos, A.,1996, “Stock Return Volatility and Time Varying Betas in the Toronto Stock Exchange”, Quarterly Journal of Business Economics, Vol.. Brooks,1998 Time-varying Beta

Hsueh (1996), “A Dynamic User-Optimal Route Choice Problem Using a Link-Based Variational Inequality Formulation,”. Paper Presented at The 5th World Congress of the RSAI