• 沒有找到結果。

1. Anthony D. Songer and Keith R. Molenaar, “Project Characteristics for Successful Public-Sector Design-Build ”, Journal of Construction Engineering and Management, ASCE, 123(1), 34-40, 1997

2. Keith R. Molenaar and Anthony D. Songer, “ Model for Public Sector Design-Build

Project Selection ”, Journal of Construction Engineering and Management, ASCE, 124(6), 467-479, 1998

3. J. K. Yates, “ Use of Design/Build in E/C Industry ”, Journal of Construction Engineering and Management, ASCE, 11(6), 33-38, 1995

4. Kevin J. Potter and Victor Sanvido, “ Implementing a Design/Build Prequlification System ”, Journal of Management in Engineering, ASCE, 11(3), 30-34, 1995

5. Jack Rizzo, “ FEATURE: Design/Build Alternative: A Contracting Method ”, Journal of Management in Engineering, ASCE, 14(6), 44-47, 1998

6. Tyson R. Browning, “ Applying the Design Structure Matrix to System Decomposition and Integration Problems: A Review and New Directions ”, IEEE Transactions on Engineering Management, 48(3), 292-306, 2001

7. Chun-Hsien Chen, Shih Fu Ling, and Wei Chen, “ Project Scheduling for Collaborative Product Development Using DSM ”, International Journal of Project Management, 21, 291-299, 2003

8. Donald V. Steward, “ The Design Structure System: A Method for Managing the Design of Complex Systems ”, IEEE Transactions on Engineering Management, EM 78(3), 71-74, 1981

9. A. Yassine, D. Falkenburg, and K. Chelst, “ Engineering Design Management: An Information Structure Approach ”, International Journal of Production Research, 37(13), 2957-2975, 1999

10. Ali A. Yassine, Daniel E. Whitney, and Tony Zambito, “ Assessment of Rework

Probabilities for Simulating Product Development Processes Using the Design Structure Matrix (DSM) ”, International Design Engineering Technical & Computers and

Information in Engineering Conference, ASME, 1-9, 2001

11. Ali Yassine, “An Introduction to Modeling and Analyzing Complex Product Development Processes Using the Design Structure Matrix (DSM) Method”, Quaderni di Management

(Italian Management Review), www.quaderni-di-management.it, No.9, 2004 12. Thomas U. Pimmler and Steven D. Eppinger, “ Integration Analysis of Product

Decompositions ”, Design Theory and Methodology Conference, ASME, 1-10, 1994 13. Shi-Jie (Gary) Chen and Li Lin, “ Decomposition of Interdependent Task Group for

Concurrent Engineering ”, Computers & Industrial Engineering, 44, 435-459, 2003 14. Andrew Kusiak, Juite (Ray) Wang, David W. He, and Chang-Xue Feng, “ A Structured

Approach for Analysis of Design Process ”, IEEE Transactions on Components, Packaging, and Manufacturing Technology, Part A, 18(3), 664-673, 1995

15. Hyun Jeong Choo, Jamie Hammond, Iris D. Tommelein, Simon A. Austin, and Glenn Ballard, “ DePlan: A Tool for Integrated Design Management ”, Automation in Construction, 13, 313-326, 2004

16. 劉福勳、吳繼熊、陳盛隆,「統包工程招標策略之探討」,營建管理季刊(秋季號), 第 56 期,第 38 頁-第 42 頁,2003

17. 黃國立、李國榮、吳大川,「統包採購問題探討」,現代營建,第 271 期,第 69 頁-第 74 頁,2002

18. 黃俊銘,「統包工程設計階段管理缺失及因應策略之探討」,碩士論文,私立中華大 學營建管理研究所,新竹,2004

19. 李得璋,「公共工程統包制度之推動」,營建工程統包制度研討會,第Ⅱ-1 頁-第Ⅱ-32 頁,台北,2000

20. 陶家維、梁樾,「公共工程統包制度之研究」,行政院公共建設督導會報專案研究計 畫,1994

21. 王啟元、陳邁、李得璋,「建築工程執行設計與施工結合(Design-Build)制度之可 行性分析」,台灣省政府住宅及都市發展局委託執行專案研究計畫,1995

22. 林家煌,「公共工程統包專案設計管理之研究」,碩士論文,國立台灣大學土木工程 研究所,台北,2003

23. 葉宏安,「淺論 D/B 與 Turnkey 有關工程統包之差異與應用」,營建管理季刊,第 56 期,第 1 頁-第 6 頁,2003

24. 郭旭輝,「統包工程之專案管理」,營建工程統包制度研討會,第Ⅲ-1 頁-第Ⅲ-9 頁,

台北,2000

25. 林俊昌,「眷村改建工程採用統包之探討」,營建工程統包制度研討會,第Ⅳ-1 頁-第

Ⅳ-27 頁,台北,2000

26. 林利國、張智強,「高科技廠房興建之統包策略探討」,營建管理季刊,第 56 期,第 7 頁-第 16 頁,2003

27. 行政院公共工程委員會,「建置全生命週期工程管理機制-統包模式之工程進度及品質 管理」,研究報告,2003

28. 謝壽明,「同步工程設計模式之建立-以晶圓廠廠務系統設計為例」,碩士論文,國立 交通大學土木工程研究所,新竹,2002

29. 陳俊伊,「同步工程應用於新產品開發專案工作協調之研究」,碩士論文,國立台北 科技大學生產系統工程與管理研究所,台北,2002

30. 黃文賢、蕭開元、王維志、林俊昌、郭明祥,「特殊機電工程統包執行模式之案例探 討」,工程與技術,第 78 卷,第 2 期,第 87 頁-第 103 頁,2005

31. 郭奉宜,「統包工程之進度規劃模式」,碩士論文,國立交通大學土木工程研究所,

新竹,2005

32. 廖宗信,「利用模擬方法考慮設計循環之設計進度模型」,碩士論文,國立交通大學 土木工程研究所,新竹,2004

相關文件