Using balanced scorecard approach to project management performance 胡效匡、曾清枝

E-mail: 342132@mail.dyu.edu.tw

ABSTRACT

Project management is the core activity in many firms. Project management performance may directly affect the firm survival; as a result, how to measure project management performance is a crucial topic for all the firms. From previous works on measuring project management performance, most of the studies are focus on project internal factors such as cost, schedule and quality, ignoring project external factors. Therefore, this study attempts to construct an assessment model to evaluate project management performance, ranging from internal to external factors. The model consists of four dimensions, originated from Balanced Scorecard (BSC), and 19 key performance indicators (KPIs), then integrate all KPIs into a single index. Finally, through expert questionnaire by using Analytic Hierarchy process (AHP), the weights of four dimensions and nineteen KPIs are easily obtained. The major findings of this study is discussed as follows. Through the survey of this study,we can understand that the project management performance of the company's key performance indicators of the views, which the internal processes, is the highest weight. We can see in this case the Balanced Scorecard companies wishing to import the most critical dimensions are internal processes (project maturity), and thus improve customer satisfaction to achieve improved financial indicators.

Keywords : project management performance,、Balanced Scorecard、Analytic Hierarchy process Table of Contents

目 錄 中文摘要 ...................... ii 英文摘要 .................

..... iii 誌謝 ........................ iv 目錄 ...............

......... v 表目錄  ...................... vii 圖目錄  .........

............. viii 第一章  緒論.................... 1   第一節  研究背 景與動機............. 1   第一節  研究目的................ 2   第一節   研究範圍與流程............. 3 第二章  文獻探討.................. 5   第一 節  專案管理................ 5   第二節  專案績效管理.............. 8    第三節  平衡計分卡............... 13   第四節  專案成熟度.............

..   第五節  層級分析法............... 18 第三章  研究架構.............

..... 32   第一節  研究方法與流程............. 32 第二節  建構專案管理績效評估模式.

......... 33 第三節  構面的研擬................. 35 第四節  整體績效指標...

............. 第四章  研究結果與分析............... 第一節  調查方法與對象

............. 第二節  問卷發放結果.............. 第五章  結論與建議....

............. 第一節  結論 .................. 第二節  研究貢獻.....

........... 第三節  研究限制................ 第四節  後續研究之建議....

.......... 參考文獻..................... 42 表 目 錄 表 2-1 隨機指標(R.I.)表..

............ 30 表 4-1 受訪者資料................. 39 表 4-2 平衡計分卡專案績效評 估模式構面排序... .. 40 表 4-3 財務構面之績效指標之排序...... .... 42 表 4-4 顧客構面之績效指標之 排序...... .... 44 表 4-5 專案員工學習與成長構面之績效指標之排序 ... 49 表 4-6 整體權重排序表...

............ 50 圖 目 錄 圖 1-1 本研究流程圖.................4 圓 2-1 五個程序群流 程關係圖............ 7 圖 2-2 平衡計分卡四個構面關係圖.......... 14 圖 2-3 發展平衡計分卡 之流程............ 15 圖 3-1 本研究架構圖................ 34 圖 4-1 平衡計分卡專案 績效評估模式的四個構面的排序 . 46 圖 4-2 財務構面指標之排序............. 48 圖 4-3 顧客構面評估指 標之排序........... 50 圖 4-4 專案員工學習與成長構面評估指標之排序.... 56

REFERENCES

Project Management Institute(2002),”專案管理知識體系導讀指南”,熊培霖、蘇佳慧、吳俊德譯,博頡策略顧問,。 Robert S. Kaplan

& David P. Norton(2001),「新策略管理制度:平衡計分卡」,四個構面關係圖,台北市,天下文化,2001 年 林怡伶(2004),專案管理平

(2)

衡計分卡,國立臺灣大學資訊管理學研究所未出版碩士論文 吳道生,張國棟(2005),組織專案管理成熟度模式解析,營建知 訊,2 (269)

,55-63。 陳怡珊(2002),專案管理成熟度模式及評估稽核表之建構,私立中華大學科技管理研究所未出版之碩士論文。 熊培霖、范淼

、黃哲明、周祥東、陸正平(2006),專案管理基礎知識與應用實務,台北:社團法人中華專案管理學會。 鄧振源,曾國雄(1989),層級分 析法的內涵特性與應用(下),中國統計學報,27(7),1-20。 二、英文部分 Brown, M. & Sevenson, R. (1988). Measuring R&D productivity.

Research Technology Management, 6, 11-15. Calantone, R. J., Cavusgil, S. T., & Zhao, Y. (2002). Learning orientation, firm innovation

capability, and firm perfor-mance. Industrial Marketing Management, 31(6), 515-524. Cooke-Davies, T. J., & Arzymanow, A. (2003). The maturity of project management in different industries: An investigation intovariations between project management models. International Journal of Project Management, 21(6), 471-478. Cordero, R. (1990). The measurement of innovation performance in the firm: An overview. Research Policy, 19(2), 185-192. Dr o ng elen, I. C. & Bild er beek , J . (1999 ) . R&D performance measurement: More than choosing a set of metrics. R&D Management, 29(1), 35-46. Drongelen, I. C. & Cook, A. (1997). Design principles for the de-velopment of measurement systems for research and devel-opment processes. R &D Management, 27(4), 345-357. Gemser, G. & Leenders, M. A. A. M. (2001). How integrating in-dustrial design in the product development process impacts on company performance. Journal of Product Innovation Management, 18(1), 28-38. Hartel I, Burger, G., Billinger, S., Kamio, Y.(2002) Virtual organization of after-sales service in the one-of-a -kind industry. In M. Luis. Camarinha-Matos: Collaborative Business Ecosystems and Virtual Enterprises, pp. 405-420, Kluwer Academic Publishers, Boston, 2002, 631 pages. Kaplan, R. S., & Norton D.

P.(1996)Using the balanced scorecard as a strategic management system. Harvard business review, 75-84. Levinson, H. 2003. Management by whose objectives? Harvard Business Review ( January): 107-116. Montoya-Weiss, M. M. & Calantone, R. (1994). Determinants of new product performance: A review and meta-analysis. Journal of Product Innovation Management, 11(5), 397-417. Nonaka, I., Kusunoki, K., & Nagata, A. ( 1998). Organizational ca-pabilities in product development of Japanese firms: A con-ceptual framework and empirical findings. Organization Science, 9(6), 699-718. Osawa, Y. & Murakami, M. (2002). Development and application of a new methodology of evaluating industrial R&D projects. R&D Management, 32, 79-86. Project Management Institute (2008). Organizational Project Man-agement Maturity Model Knowledge Foundation(2rd edi-tion). Pillai, A. S., Joshi, A., & Rao, K. S.(2002) Performance measure-ment of R&D projects in a multi-project, concurrent engi-neering environment. Project Management, 20. Norrie, J.,&, Walke, D. H T (2004)A Balanced Scorecard Approach to Project Management Leadership, Project Management Journal 35(4),47-56. Robert S. K., & David P. N.(1992) The Balanced Scorecard: Meas-ures That Drive Performance. Harvard Business Review, 172-180. Rozenes, S., G. Vitner and S. Spraggett(2004), “MPCS: mul-tidimensional project control system,” International Journal of Project Management, 22, 109-118. Szilagyi, A. D. (1981). Management and performance. CA: Goo-dyear Publishing Company, Inc. Schuler, A. J.(2003). How to Take the Pain out of Performance Ap-praisals. Sieli, E. M.(1991). Managing a Project as a Process. AT&T Tech-nical Journal, March/April . 33-39 Saaty, T. L. (1980). The analytic hierarchical process. New York:McGraw-Hill. Vitner, G., S. Rozenes and S. Spragget, (2006) “Using data envelope analysis to compare project efficiency in a multi-project environment,”

International Journal of Project Management, 24, 323-329. Katzell, M. E. (1975). The measure and the myth. New York: Amaeom. Kast, F. E. &

Posenzweig, J. E. (1979). Organization andmanage-ment: A system and contingency approach.New York: McGraw-Hill. Werner , B. M. & Souder, W. E. (1997). Measuring R&D perfor-mance-State of art. Research Technology Management, 40(2), 34-42. Wang, C. W., Wu, J. J., & Horng, R.

Y. (1999). Creative thinking ability, cognitive and R&D performance. R&D Management, 29(3), 247-254. Kerzner, H.(1995). Project Management: A systems Approach to Planning , Scheduling , and Controlling” Van Nostrand Reinhold.4th ,

參考文獻

相關文件

The results show the effectiveness of PBC on road maintenance project through the flexibility of works and encouragement of using preventive maintenance methods.... 第一章

Keywords : Project Time Management, Project Schedule Performance Index, Resource Leveling...

The objective is to evaluate the impact of personalities balance in a project management team on the team’s performance.. To verify the effectiveness of this model, two

Most construction firms often cannot effectively control the cost of construction project due to inaccurate budget allocation; therefore, they cannot effectively forecast

Should the project manager does not pay attention to such unbalanced ratio of duration to budget in utility relocation works; it may induce significant external

The Earned Value Management (EVM) is an international standard for project cost control, which provides a promising tool for project cost control practice of the middle

95.3% of respondents considered that the public construction project planning and design stage in the import mechanism for risk management and risk events on the expected

18.Zhu, 2000, Construction Project Management Structure Due to the Design and Build Approach as Practiced in Singapore, Singapore University, Thesis(M.S.).. D.,