• 沒有找到結果。

Identify the Core Competence of Project Manager in Different Industries. 鄭鵠瀚、曾清枝

N/A
N/A
Protected

Academic year: 2022

Share "Identify the Core Competence of Project Manager in Different Industries. 鄭鵠瀚、曾清枝"

Copied!
3
0
0

加載中.... (立即查看全文)

全文

(1)

Identify the Core Competence of Project Manager in Different Industries.

鄭鵠瀚、曾清枝

E-mail: 321386@mail.dyu.edu.tw

ABSTRACT

The thesis mainly discusses the order of different industries p-roject managements’core competence. In order to elevate their core a-bility and lead to succeed.Besides adopting the studying method of A-nalytic Hierarchy Process, the thesis also use thirteen criteria inc-luding four core parts such as profession and knowledge,management c-ompetence, interpersonal relationship and characters to evaluate the abilities of project management. According to the study, the importance of core competence of pr-oject management varies by industries. The most important is integri-ty and leadership competence. Second, the industry should offer a well-founded training program. Third, develop in thee system integr-ation capabilities, the proposed project manager in training issues, job rotation can be classified as full-screen indicators of project managers or reference. Last, experiences can be the main criteria of five evaluations. Companies adopt not only formal training or acade-mic training program but also consulting skills can develop project managements’ competence.

Keywords : project management、project manager、core competence、analytic hierarchy process Table of Contents

          內容目錄 中文摘要..................... iii 英文摘要.........

............ iv 誌謝辭 ..................... v 內容目錄..........

........... vi 表目錄 ..................... viii 圖目錄 ..........

........... x 第一章 緒論................... 1   第一節 研究背景與動機...

......... 1   第二節 研究目的............... 2   第三節 研究流程.......

........ 3 第二章 文獻探討................. 5   第一節 專案管理應具備能力之定義.

...... 5   第二節 關鍵核心能力之內涵.......... 9   第三節 關鍵核心能力衡量指標....

.....14 第三章 研究方法.................19   第一節 研究架構..........

.....19   第二節 研究方法...............21   第三節 問卷設計..........

.....29   第四節 調查方法與對象............30 第四章 研究結果與分析.........

.....31   第一節 問卷發放結果.............31   第二節 問卷結果與分析.......

.....31 第五章 結論與建議................55   第一節 結論............

.....55   第二節 研究限制與建議............56   第三節 研究限制..........

.....58   第四節 續研究與建議.............58 參考文獻................

.....60 附錄A  專案經理核心能力填寫問卷.........67 表目錄 表 2- 1 管理監督權的演變......

........ 10 表 3- 1 AHP評估尺度意義及說明.......... 25 表 3- 2 成偶比對矩陣........

........ 26 表 3- 3 隨機指標.................. 28 表 4- 1 製藥業有效問卷之樣本資料..

........ 32 表 4- 2 製藥業專業經理核心能力構面排序....... 32 表 4- 3 營造業有效問卷之樣本資料..

........ 33 表 4- 4 營造業專業經理核心能力構面排序....... 33 表 4- 5 電子業有效問卷之樣本資料..

........ 35 表 4- 6 電子業專業經理核心能力構面排序....... 35 表 4- 7 工程技術服務業有效問卷之樣本 資料...... 36 表 4- 8 工程技術服務業專業經理核心能力構面排序... 37 表 4- 9 製藥業專案知識及經驗評估指標 之排序..... 38 表 4-10 製藥業管理能力評估指標之排序........ 39 表 4-11 製藥業人際關係和人格特質評 估指標之排序... 40 表 4-12 製藥業系統整合能力評估指標之排序...... 41 表 4-13 營造業產業知識及經驗評估 指標之排序..... 42 表 4-14 營造業管理能力評估指標之排序........ 43 表 4-15 營造業人際關係和人格特 質評估指標之排序... 44 表 4-16 營造業系統整合能力評估指標之排序...... 45 表 4-17 電子業專業知識及經驗 評估指標之排序..... 46 表 4-18 電子業管理能力評估指標之排序........ 47 表 4-19 電子業人際關係和人 格特質評估指標之排序... 48 表 4-20 電子業系統整合能力評估指標之排序...... 49 表 4-21 工程技術服務業專 業知識及經驗評估指標之排序. 50 表 4-22 工程技術服務業管理能力評估指標之排序.... 51 表 4-23 工程技術服務業 人際關係和人格特質評估指標排序 52 表 4-24 工程技術服務業系統整合能力評估指標之排序.. 53 圖目錄 圖 1- 1 AHP 研究流程圖.............. 4 圖 2- 1 專案績效鐵三角............... 6 圖 3- 1 AHP 分析研究架構............. 20 圖 4- 1 製藥業專案經理核心能力之排序........ 33 圖 4- 2 營造業

(2)

專案經理核心能力之排序........ 34 圖 4- 3 電子業專案經理核心能力之排序........ 36 圖 4- 4 工程技 術服務業專案經理核心能力之排序.... 37 圖 4- 5 製藥業專案知識及經驗評估指標之排序..... 39 圖 4- 6 製藥業 管理能力評估指標之排序........ 40 圖 4- 7 製藥業人際關係和人格特質評估指標之排序... 41 圖 4- 8 製藥業 系統整合能力評估指標之排序...... 42 圖 4- 9 營造業產業知識及經驗估指標之排序...... 43 圖 4-10 營造 業管理能力評估指標之排序........ 44 圖 4-11 營造業人際關係和人格特質評估指標之排序... 45 圖 4-12 營 造業系統整合能力評估指標之排序...... 46 圖 4-13 電子業專業知識及經驗評估指標之排序..... 47 圖 4-14 電子業管理能力評估指標之排序........ 48 圖 4-15 電子業人際關係和人格特質評估指標之排序... 49 圖 4-16 電子業系統整合能力評估指標之排序...... 49 圖 4-17 工程技術服務業專業知識及經驗評估指標之排序. 51 圖 4-18 工程技術服務業管理能力評估指標之排序.... 52 圖 4-19 工程技術服務業人際關係和人格特質評估指標排序 53 圖 4-20 工程技術服務業系統整合能力評估指標排序... 54

REFERENCES

一、中文部分 吳生生(1982),專案管理與專案經理之計畫管制功能,國立中山大 學管理研究所未出版之碩士論文。 林欽榮(2001),人際 關係與溝通,台北,揚智文化。 許如欽(2005),專案負責人能力、專案執行力與專案效益之探討- 以政府專案計畫為例,中山管理評論

,13(1),247-278。 許國清(1998),不同專案群組下,專案經理人特性對專案績效之影 響,私立靜宜大學企業管理學系碩士班未出版之 碩士論文。 許憲國,黃三平(2009),知識、能力和職業素質培養,機械職業教 育期刊,2009(4),6-7。 張建達(2007),專案經理人專業知 能與培訓之研究-以電子系統產 品製造業為例,國立清華大學工業工程與工業管理研究所 未出版之碩士論文。 曾國書(2006),企業界 專案執行人員具備專案管理能力之研究,私 立長榮大學經營管理研究所未出版之碩士論文。 楊智彬,呂文授(2008),營建專案管理經理 人應具備基本知識之分 析,專案管理學刊,1(1),1-19。 廖述良(2001),系統分析概論,環境系統動力學理論與應用研習會, 中壢:國立 中央大學。 劉曉明(2006),專案經理人型態與技能能力之配對對專案凝聚力影 響之研究,國立國防管理學院後勤管理研究所未出版之碩 士論文。 劉晏孜(2008),金融專業人才應具備核心能力之研究,文大商管學 報,13(2),47-70。 鄧振源,曾國雄(1989),層級分析法的內 涵特性與應用(下),中國 統計學報,27(7),1-20。 二、英文部分 Albert, H. (2004). Project management reform: a public body case study.

Municipal Engineer, 157(3), 199-207. Anderson, S. D., & Tucker, R. L. (1994). Improving project mana- gement of design. Journal of Management in Engineering, 10 (4), 35-44. Andrew, R. J., Dainty, M. C., & David, R. M. (2003). A competency based performance model for construction project management manager. Construction Management and Economics, 22, 877-886. Atkinson, R. (1999). Project management:

Cost, time and quality,t- wo best guesses and aphenomenon, its time to accept other s- uccess criteria. International Journal of Project

Management, 17(6), 337-342. Barczak, G., & Wilemon, D. (1989). Leadership differences in new p- roduct development teams. Journal of Product Innovation Mana- gement, 6(2), 259-267. Boyatzis, R. E. (1982). Competencies in the 21th. Journal of Manag- ement Development, 27(1), 5-17.

Briner, W., Hastings, C., & Geddes, M. (1996). Project leadership. England: Gower. Cleland, D. I., & King, W. R. (1983). System analysis and Project Management (2nd ed). New York: McGraw-Hill. Crawford, L. (2005). Senior management perceptions of project man- agement competence. International Journal of Project Manager, 23(1), 7-16. David, J. B., & Gillian, H. W. (2007). Project management priorit- ies and the link with performance management systems. Project Management Institute, 38(4), 5-11. Dilenschneider, R. L. (1991). A briefing for leader:

Communication as the ultimate exercise of power. New York: HarperCollins. Edward, M., Deborah, J. F., Erv, R. T., & Valerie, P. (2007). So- ft skills quantification (ssq) for project manager compete- ncies. Project Manager Institute, 38(2), 30-38. Edum-Fotwe, F. T., & McCaffer, R. (2000).

Developing project man- agement competency: Perspectives from the construction ind- ustry. International Journal of Project Management, 18(2), 111-124. Fisher, D., Schluter, L., & Toleti, P.avan. (2005, Aug.). Proje- ct Manageement education and training process for career development.

Journal of Construction Engineering and Mana- gement, 131(8), 903-910. Harrison, F. L. (1993). Advanced project management. England: Gower.

Heerkens, G. R. (2002). Project management. New York: McGraw-Hill. Jeffrey, L. B. (2005). Project managers, Can we make them or just make better. Conference on Information Technology Education, (6), 167-173. Jessup, H. R. (1990). New roles in team leadership. Training and D- evelopment Journal, 44(11), 79-83. Jennifer, M. B., Bishop, M. J., & Andrew, E. W. (2006). Thecompete- ncies and characteristics required of an effective project m- anager. Educational Technology Research & Development, 54(2), 115-140. Jiang, J. J., Gary, K., & Steve, M. (1998).

Important behavioral s- kills for is project managers: The judgments of experienced is professional. Project Management Journal, 29(1), 39-43.

Kamal, M. A. A. (2001), Application of the AHP in project manage- ment. International Journal of Project Management, 19 (1), 19-27. Katz, R. L.

(1955). Skills of an effective administrator. Harvard Business Review, 33 (1), 33-42. Kerzner, R. T. (1979). Project management: A system approach to planning, scheduling and controlling. New York: Van Norstrand Reinhold. Mintzberg, H. (1973). The nature of managerial work. New York:

Harper and Row. Meredith, J. R., & Mantel, S. J., (1995). Project management a managerial approach (3rd ed). Singapore: John Wiley & S- ons.

Morris, P. W. G., Patel, M. B. & Wearne. S. H. (2000). Resear- ch into revising the APM. Project management body of kn- owledge. International Journal of Project Management, 18 (3), 155-164. Munns, A. K., & Bjeirmi, B. F. (1996). The role of project ma nagement in achieving project success. International J- ournal of Project Management, 14(2), 81-87. Nicholas, J. M. (1990). Managing business and engineering pr- ojects. New Jersey: Prentice-Hall. Parfitt, M. K., & Sanvido, V. E. (1993). Checklist of critic- al success factors for building projects. Journal of M- anagement in Engineering, 9(3), 243-249. Pinto, K., & Slevin, D. P. (1987). Critical factors in succe- ssful project management. IEEE Transaction on Engineer- ing, 34(1), 22-27. Pinto, J. K., & Covin, J. G. (1989). Critical factors in pro- ject implementation: A comparison of construction and R- &D projects.

(3)

Technovation, 9(1), 49-62. Saaty, T. L. (1980). The analytic hierarchical process. New Y- ork: McGraw-Hill. Souder, W. E., & Song, S. (1998).

Critical development activi- ties for really new versus incremental product. Journal of Product Innovation Management, 15(3), 124-135. Spencer, L. M., & Spencer, S. M. (1993). Competence at work: Modelsfor superior performance. New York: John Wiley & Sons. Suikkia, R., Raija, T., &

Haapasalob, H. (2004). Project man- agementcompetence development framework in turbulent b- usiness environment. Elsevier Ltd, 26(5/6), 723-738. Tavares, L. V. (2002). A review of the contribution of opera- tional research to project management. European Journa- l of Operational Research, 136(1), 1-18. Thomas, A. C. (2004). Project Manager Skill Development: A s- urvey of programs and practitioners. Engineering Manag- ement Journal, 11(3), 10-16. Vijay, K. V. T., & Wideman, R. M. (1994, & 2002). Project ma- nager toproject leader? Project Management Institute

’s 25th annualseminar & symposium (pp. 1-9), Canada: Van- couver, University of British Columbia. Zimmerer, T. W., & Mahmoud M. Y.

(1998). A Leadership profi- le of american project managers. Project Management J- ournal, 29(1), 31-38.

參考文獻

相關文件

The objective is to evaluate the impact of personalities balance in a project management team on the team’s performance.. To verify the effectiveness of this model, two

The impact of human resource management practices on turnover, productivity, and corporate financial performance. Understanding human resource management in the contexe

Harvey Michael & Novicevic Milorad(2002), “The role of political competence in global assignments of expatriate managers”, Journal of International Management Volume: 8, Issue:

The Earned Value Management (EVM) is an international standard for project cost control, which provides a promising tool for project cost control practice of the middle

(1995), “A typology for evaluating branch-level perceptions of internal customer management processes within the UK clearing banks,” The Service Industries Journal, Vol..

Keywords: Failure Mode & Effects Analysis (FMEA), Project Management, Professional Construction Management (PCM), Military Construction.. Due to the reduction of

95.3% of respondents considered that the public construction project planning and design stage in the import mechanism for risk management and risk events on the expected

These results can use to eliminate quality management problems in planning and design stage, that is, providing project management organization for investigation